# 105 West 73rd Street, Manhattan

Co-op · 38 units · built c. 1920 · Block 1145, Lot 29.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/1011450029/105-west-73-street

More construction in Upper West Side: https://umarelli.org/nyc/manhattan/upper-west-side.md

Every lot on block 1145: https://umarelli.org/nyc/manhattan/1145.md

## Building permits

- Alteration, filed Nov 11, 2026, described as “Suspended scaffold for inspection & worker access to facade. No change in use, egress, or occupancy.”
- Alteration, filed Oct 12, 2026, estimated cost $1K, described as “Installation of temporary sidewalk shed as per plan. No change in use, egress or occupancy.”
- Alteration, filed Jun 23, 2026, estimated cost $95K, described as “Interior renovation of Apt 1C on the 1st floor. Modifications of partitions, new flooring, cabinets, painting, etc. No change in use, egress or occupancy.”
- Alteration, filed Dec 9, 2024, estimated cost $68K, described as “Carrier: Dish Wireless. New Antenna Installation. Install (2) exterior cabinets on a new platform on the roof. Install (3) new antennas, (3) new OVP devices, (1) GPS, and (6) new RRH units on water tank and bulkhead. In conformance w/ TPPN…”
- Alteration, filed Jan 10, 2024, described as “Pipe scaffold to be installed as per plan. No change in use, egress or occupancy.”
- Alteration, filed Jan 9, 2024, estimated cost $10K, described as “Application filed for mechanical modifications/additions of the rear yard, 1ST, and 2ND floor (apt 1AB & 2A) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jan 5, 2024, estimated cost $20K, described as “Application filed for structural modifications/additions on the 1ST and 2ND floor (apt 1AB and 2A) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jun 16, 2023, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed May 4, 2023, estimated cost $504K, described as “9th Cycle FISP repairs. No change to use, egress or occupancy.”
- Alteration, filed May 2, 2023, estimated cost $22K, described as “Application filed for plumbing modifications/additions on the 1st (APT 1A/B) and 2nd floor (APT 2A) as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed May 2, 2023, estimated cost $211K, described as “Application filed for interior/exterior renovation of rear yard, 1ST, and 2ND fl (apt 1AB & 2A). Work includes installation of in ground pool and counter for bbq grill and sink as per plans filed herewith. No change in use, egress, or…”
- Alteration, filed Jul 26, 2022, estimated cost $30K, described as “Installation of 1 courtyard-mounted AC condenser, refrigerant lines to 1 air-handler mounted within the dwelling unit. Ductwork distribution. New system replaces window AC units.”
- Alteration, filed Apr 26, 2022, estimated cost $25K, described as “Remove 1 tub. Replace 1 lav., 1 toilet, 1 sink, 1 dishwasher and 1 gas range on existing branch. Install 1 new shower, 1 clothes washer, 1 toilet, 1 lav.”
- Alteration, filed Apr 26, 2022, estimated cost $145K, described as “Renovation of kitchen and bathroom, construction of new laundry closet and half-bath. Minor non-structural partition demolition, new partitions and flooring.”
- Alteration, filed Jan 12, 2022, estimated cost $220K, described as “Renovate apt 7A, general construction (partitions, finishes, electrical), plumbing fixture replacements, removal, installation, no change to use, exits or occupancy”
- Alteration, filed Oct 26, 2021, estimated cost $25K, described as “Install chimeny liner.”
- Alteration, filed Aug 26, 2021, estimated cost $22K, described as “Bathroom and Kitchen Renovation, relocation of existing plumbing fixtures, installation of new plumbing fixtures. Remove existing gas meter and gas stove & replace with electrical gas stove. Cap existing gas line.”
- Alteration, filed Jun 15, 2021, estimated cost $155K, described as “Minor layout adjustments to kitchen cabinetry. Please see dwg 100.02”
- Alteration, filed Jun 15, 2021, estimated cost $20K, described as “Application filed for plumbing modifications/additions on the 7TH fl (apt 7B) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jun 15, 2021, estimated cost $67K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 7TH floor (apt 7B) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed May 8, 2020, estimated cost $16K, described as “Installation and modification of plumbing fixtures.”
- Alteration, filed Nov 27, 2018, estimated cost $22K, described as “Filing for installation of pipe scaffolding on behalf of contractor”
- Alteration, filed Nov 15, 2018, estimated cost $11K, described as “Filing for installation of sidewalk shed on behalf of contractor”

## Property taxes

- Assessment: $5,282,550
- 2026–27 Tax: $545,929
- Market value (city estimate): $11,739,000
- Taxable value: $5,078,500
- Assessed land: $778,500
- Assessed improvements: $4,504,050

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $85,145 credit this tax year.

## Zoning

C1-8A (part of the lot is R8B): floor area ratio 7.24 built, 7.52 allowed by base zoning.

## Recent sales

- Dec 19, 2024: $775,000
- Jan 26, 2024: $715,000
- Oct 11, 2023: $1,150,000
- Aug 16, 2022: $1,450,000
- Feb 2, 2022: $765,000
- Jun 3, 2021: $715,000
- May 20, 2021: $712,500
- Apr 15, 2021: $600,000
- Nov 16, 2020: $1,355,000, Apt 3C
- Nov 2, 2020: $1,500,000, Apt 9C

The 10 most recent of 18 open-market sales since 2016, from the Department of Finance’s sales files.

## Landmarks

Part of Upper West Side/Central Park West Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
