161 West 75th Street, Manhattan
Condominium · 132 units · built c. 1924 · Block 1147, Lot 7501.
Building permits
- Alteration, filed Sep 1, 2026, estimated cost $131K, described as “Interior renovation of apt 1C filed in conjunction with DOB now pl. No change to use, occupancy or egress.”
- Alteration, filed Jun 15, 2026, described as “Installation of industrial rope access for facade inspections.”
- Alteration, filed Jun 24, 2025, estimated cost $13K, described as “Interior renovation of primary bathroom in apartment #15GH on 15TH floor of existing building, all as per plan. No change in egress, use or occupancy under this application.”
- Alteration, filed Mar 19, 2025, estimated cost $15K, described as “Replacement of three existing lot line windows within existing masonry opening at apt #15GH on the 15TH floor. All as per plan. No change in egress, use or occupancy under this application.”
- Alteration, filed Feb 14, 2025, estimated cost $95K, described as “Interior renovation in apt 13B filed in conjunction with DOB now pl. No change to use, occupancy or egress.”
- Alteration, filed Sep 19, 2024, estimated cost $106K, described as “Filing herewith to renovate apt 6F on the 6 th floor.demolition & construction of non-structural partitions asper architectural plans. Plumbing work as per subsequentapplicant as per plumbing plans. No change to use, egressor occupancy.”
- Alteration, filed Sep 16, 2024, described as “Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.”
- Alteration, filed Sep 5, 2024, estimated cost $36K, described as “Alt application for minor non-load bearing build out alteration of an exist'g commercial space into a coffee shop. No change in use, egress or occupancy”
- Alteration, filed Aug 22, 2024, estimated cost $5K, described as “Install (1) 3 compartment sink, 1 handsink, 1 slop sink, 1 ice -machine, 1 expresso machine, 1 floor drain, 1 grease trap, keep 1 exist'g lavatory, 1 toilet no change in egress, use or occupancy.”
- Alteration, filed Jan 4, 2024, described as “Facade repairs - new platform added”
- Alteration, filed Oct 31, 2023, estimated cost $106K, described as “Interior renovation in apt 6E filed in conjunction with DOB now pl. No change to use, occupancy or egress.”
- Alteration, filed Jun 12, 2023, estimated cost $9K, described as “Install AC sleeves in new and modified openings under existing windows as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed May 31, 2023, estimated cost $105K, described as “Filing herewith to renovate APT3J on the 3 rd floor as perarchitectural plans. Plumbing work filed as subsequentapplication as per plumbing plans. No change to use, egress or ooccupancy.”
- Alteration, filed May 8, 2023, estimated cost $80K, described as “Apt combination as per tppn #/97, minor non load bearing partition removal, newinterior gwb non load bearing partitions and doors, new cabinetry and finishes,all as per plans supplied. No change to use, occupancy or egress”
- Alteration, filed May 8, 2023, estimated cost $35K, described as “Plumbing: new, replaced, relocated and removed plumbing fixtures as per plansfiled.no change to use, occupancy or egress”
- Alteration, filed Feb 7, 2023, estimated cost $5K, described as “Installation of a temporary pipe scaffold as per plans in conjunction with general construction work. No change in use, egress or occupancy. Scaffold to comply with NYC building code, chapter 33.”
- Alteration, filed Dec 20, 2022, estimated cost $5K, described as “Installation of a heavy duty sidewalk shed as per plans in conjunction with general construction. No change in use, egress or occupancy. Sidewalk shed to comply with NYC building code, chapter 33.”
- Alteration, filed Nov 17, 2022, estimated cost $2.0M, described as “Facade, exterior and masonry repairs as per drawings. No change in egress, use or occupancy is involved under this application.”
- Alteration, filed Sep 14, 2022, estimated cost $12K, described as “Interior renovation of existing class "A" apartment. No change of use, egress or occupancy under this application.”
- Alteration, filed Jun 22, 2022, estimated cost $124K, described as “Herewith file application to renovate apt 14D, including removing and installing non-bearing partitions and finishes; no change to use, egress or occupancy.”
- Alteration, filed Dec 22, 2021, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 13, 2021, estimated cost $17K, described as “General plumbing modifications to unit 3G as per plans, there is no change to occupancy use or egress under this application”
- Alteration, filed Sep 13, 2021, estimated cost $70K, described as “Proposed interior renovation to unit 3G to include removal of existing non load bearing partitions, floors and finishes to be replaced with new, there is no change in occupany use or egress under this application”
- Alteration, filed Jul 2, 2021, estimated cost $10K, described as “Hereby filing for the removal, replacement and relocation of fixtures. No change to use occupancy or egress.”
- Alteration, filed Jul 2, 2021, estimated cost $70K, described as “Hereby filing for the interior renovation of apartment 4AE, installation of vent hood. No change to use egress or occupancy.”
5 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $26,674,070
- 2026–27 tax
- $2,618,578
- Market value (city estimate)
- $59,275,713
- Taxable value
- $24,361,761
- Assessed land
- $4,937,849
- Assessed improvements
- $21,736,221
- Condo units with their own tax lots
- 3
Zoning
C2-7A (part of the lot is R8B): floor area ratio 10.28 built, above the 7.52 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Aug 10, 2026: $3,025,000
- Jul 1, 2026: $2,750,000
- Jun 26, 2026: $2,100,000
- May 21, 2026: $1,990,000
- Mar 26, 2026: $1,999,990
- Dec 10, 2025: $1,929,584
- Sep 8, 2025: $1,929,584
- Jul 14, 2025: $1,400,000
- Feb 18, 2025: $4,050,000
- Dec 10, 2024: $6,145,000
The 10 most recent of 55 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Upper West Side/Central Park West Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.