211 West 61st Street, Manhattan
Community Facility Condominium · built c. 1927 · Block 1154, Lot 7502.
Building permits
- Alteration, filed Oct 27, 2026, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
- Alteration, filed Oct 19, 2026, estimated cost $186K, described as “Facade repair as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Aug 2, 2023, estimated cost $1.5M, described as “Application filed for the complete evacuation and removal of the exisitng rooftop standby generator enclosure, exisitng fuel fill port at 61ST street, all related fuel piping the existing basment level fuel tank and associated containment…”
- Alteration, filed Jul 25, 2023, estimated cost $5K, described as “Installation of a pipe scaffold”
- Alteration, filed Oct 26, 2021, estimated cost $12K, described as “Minor non-structural partition removal and installation on the second floor. No change to use, egress or occupancy.”
- Alteration, filed Jun 1, 2021, estimated cost $20K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Livel load 300 per square feet. Sidewalk shed shall comply with chapter #33 of the 2014 code. No change in use occupancy or egress under this application.”
- Alteration, filed Apr 26, 2021, estimated cost $314K, described as “Exterior patching repairs as per drawings. No change in use, egress or occupancy is required under this application.”
- No Work, filed Mar 6, 2020, described as “Middle School Musical Performance for the Lower School students and faculty (03/10, 03/11& 03/12). Attendees: Approximately 40 persons / 177 persons allowed (max.)”
- No Work, filed Dec 11, 2019
- No Work, filed Oct 15, 2019, described as “Curriculum Night for Middle School Teachers and administrators review the curriculum and explain to parents what they should expect throughout the year. DATE/TIME: October 17, 2019 // 5:00 pm 8:00 pm. ATTENDEES: Approximately 100 attendees…”
- No Work, filed Oct 9, 2019, described as “How Fundraising Really Works Seminar - The school is hosting a seminar headed by Jason Lewis, author and fundraiser. Registration is open to the public and includes breakfast and lunch. The rolldown stage and chairs will be used during the…”
- No Work, filed Oct 3, 2019, described as “Multiple events: Curriculum Nights ( 10/3 & 10/10) where teachers review curriculum and explain to parents and Mathland Lecture (10/29) - Lecture on mathematics. Rolldown stage and chairs will be used for this event. All events have 100…”
- No Work, filed Sep 25, 2019, described as “9/26/2019: Back to School Cocktail Reception: Chair of the Board of Trustees and the Head of School welcome back the school community and parents meet informally with teachers, trustees, and administrators. Caterers provide passed hors…”
- No Work, filed Sep 17, 2019, described as “Evening Lecture for parents around student behaviors. Ross Greene, a clinical child psychologist and author, will be speaking to parents about his model of intervention called Collaborative & Proactive Solutions. The roll down stage and…”
- Alteration, filed Aug 22, 2019, estimated cost $48K, described as “For the PAA, revision made to the unit schedule on sheet M-004.01 for the manufacturer and model of units, and addition of the serial number.”
- Alteration, filed Aug 13, 2018, estimated cost $7K, described as “Installation of Sidewalk Shed as per plans.”
Building history
- Alteration, filed Nov 8, 2010, permit issued - entire job/work
- Alteration, filed Jun 24, 2010, permit issued - entire job/work, described as “Interior alterations and change of use at partial basement level to accommodate new classrooms and accessory offices for the gateway school.(filing to obtain a facof per DOB memo dated 7/13/1981 for partial basement only)”
- Alteration, filed Jul 26, 2007, permit issued - entire job/work
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $18,238,948
- Market value (city estimate)
- $40,531,001
- Taxable value
- $1,594,807
- Assessed land
- $2,956,500
- Assessed improvements
- $15,282,448
- Condo units with their own tax lots
- 17
Tax breaks
- Nonprofit exemption (mental or moral improvement), with no end date, about $724,343 a year below the full tax.
- Nonprofit exemption (college or university), with no end date, about $1,056,872 a year below the full tax.
- Nonprofit exemption (school), with no end date, about $15,259 a year below the full tax.
Zoning
R8: floor area ratio 5.84 built, 6.02 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.