# 110 West End Avenue, Manhattan

Co-op · 186 units · built 1976 · Block 1156, Lot 1.

On Umarelli: https://umarelli.org/nyc/1011560001/110-west-end-avenue

More construction in Upper West Side: https://umarelli.org/nyc/manhattan/upper-west-side.md

Every lot on block 1156: https://umarelli.org/nyc/manhattan/1156.md

## Building permits

- Alteration, filed Nov 1, 2025, described as “Ira to assist with condition assessment.”
- Alteration, filed Jan 22, 2025, estimated cost $81K, described as “AT&T - Replacement of antennas with removal and installation of RRH units on roof. Removal, retrofit and installation of cabinets on existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use,…”
- Alteration, filed Oct 23, 2024, estimated cost $243K, described as “Interior renovation in 1ST fl comm space for eating & drinking establishment w/ commercial cooking. New commercial kitchen & hood. Associated mechanical and plumbing work fto be filed subsequently.”
- Alteration, filed Feb 16, 2024, estimated cost $53K, described as “Interior cleanup and minor demo of existing deli at first floor (commercial floor). Remove suspended ceiling. Prep concrete sub-flooring for new work. Remove existing hoods. In conjunction with M00932111-I1.”
- Alteration, filed May 3, 2023, estimated cost $2K, described as “Install exterior illuminated wall sign (robofun)”
- Alteration, filed Apr 11, 2022, estimated cost $10K, described as “Modification to plumbing on cellar & 1ST floor as per plans. No change in use, egress or occupancy.”
- Alteration, filed Apr 11, 2022, estimated cost $55K, described as “Removal and installation of partitions on cellar & 1ST floor included minor mechanical work as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Aug 13, 2020, estimated cost $35K, described as “AT&T - Replacement of existing telecommunication antennas with installation and replacement of RRH units on the roof. Installation and retrofitting of equipment cabinets in the equipment platform on the roof. All work is in compliance with…”
- Alteration, filed Jun 30, 2020, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 6, 2020, described as “Installation of sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 1, 2019, estimated cost $6K, described as “Installation of temporary suspended scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 17, 2018, estimated cost $22K, described as “AT&T WIRELESS. Replacement of existing telecommunications antennas with replacement/installation of RRH units on roof. Retrofit of cabinets in the existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to…”
- Alteration, filed Nov 21, 2017, described as “Installation of heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 24, 2017, estimated cost $17K, described as “Replacement of existing telecommunications antennas with installation of related RRH units on roof. Installation of new equipment cabinet and retrofit of existing equipment cabinet on existing platform on roof. All work in compliance with…”

## Property taxes

- Assessment: $56,638,800
- 2026–27 tax: $288,718
- Market value (city estimate): $125,864,000
- Taxable value: $0
- Assessed land: $6,660,000
- Assessed improvements: $49,978,800

## Tax breaks

- Mitchell-Lama exemption, with no end date.

## Zoning

R8: floor area ratio 14.87 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology