200 West End Avenue, Manhattan
Condominium · 165 units · built 2006 · Block 1158, Lot 7506.
Building permits
- Alteration, filed Oct 16, 2026, estimated cost $15K, described as “Application filed to add new plumbing fixtures in an existing retail store. No change in use egress or occupancy.”
- Alteration, filed Oct 5, 2026, estimated cost $450, described as “Install illuminated non-advertising wall sign reading CVS pharmacy - facing West 70th Street”
- Alteration, filed Jul 20, 2026, estimated cost $450, described as “Install illuminated wall sign.”
- Alteration, filed Jul 20, 2026, estimated cost $450, described as “Install illuminated wall sign”
- Alteration, filed Apr 20, 2026, estimated cost $354K, described as “Interior renovation to include altered partitions, new lighting installation, and new interior finishes.no change in size or layout of habitable spaces, existing light and air compliance to be maintained.no change to use, occupancy or…”
- Alteration, filed Apr 17, 2026, estimated cost $400K, described as “Pharmacy expansion, non-load bearing walls, modify millwork and storage fixtures. New entrance landing wall, replace interior finishes. Modify checkout and display fixture layout and lighting. Replace retail area wall, floor finishes,”
- Alteration, filed Nov 12, 2025, estimated cost $5K, described as “Plumbing gas work during renovation of apartment 15F”
- Alteration, filed Aug 7, 2024, estimated cost $90K, described as “Interior alteration at penthouse c. Remove existing closet partitions. Install new pocket door & associated framing partitions. Install new recessed light fixtures at existing dropped ceiling throughout. No change to use, egress,…”
- Alteration, filed Jun 5, 2024, estimated cost $25K, described as “Interior demolition of non-load bearing walls, and minor inteiror alterations. No change in use, egress, or occupancy.”
- Alteration, filed Oct 10, 2023, estimated cost $125K, described as “Interior renovation in apt 23A filed in conjunction with DOB now pl. No change to use. Occupancy or egress.”
- Alteration, filed Jun 26, 2023, estimated cost $83K, described as “Filing application for the interior renovation of apartment 3A/3B on the 3rd floor. Apartment originally combined and signed off under application numbers M00707393-I1 and M00707393-S1. No change in use, egress, or occupancy.”
- Alteration, filed Apr 20, 2023, estimated cost $500K, described as “Construction”
- Alteration, filed Apr 20, 2023, estimated cost $100K, described as “Mechanical work during renovation of apartment 15F”
- Alteration, filed Apr 20, 2023, estimated cost $60K, described as “Plumbing work during renovation of apartment”
- Alteration, filed Oct 14, 2022, estimated cost $5K, described as “Installation of temporary debris chute as per plans. No change in use, egress or occupancy.”
- Alteration, filed Oct 14, 2022, estimated cost $4K, described as “Installation of temporary storage of materials as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 8, 2022, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 11, 2022, estimated cost $974K, described as “Roof replacement, cap flashing replacement, drain replacement, cell cmu replacement, anchor removal and patching, pointing as per plans. No change in use, egress or occupancy”
- Alteration, filed Jul 25, 2022, estimated cost $10K, described as “Application for gen. Const. Work to combine third floor apartments 3A & 3B under tppn 3/97. Workscope limited to removal of 1 kitchen, opening in demising partition & associated cosmetic work. No change in use, bulk, egress or occupancy.”
- Alteration, filed Jul 12, 2022, estimated cost $4K, described as “Installation of 2 new 3/4 ton heat pump units”
- Alteration, filed Jul 11, 2022, estimated cost $42K, described as “This alteration is being filed for plumbing work in conjunction with GC#M00725963. No change in use, egress or occupancy.”
- Alteration, filed Jul 11, 2022, estimated cost $195K, described as “This application is being filed herewith for the interior alteration of the penthouse apartment on the 27th flr. Work to include the removal and installation of non structural partitions, finish floors and fixtures. No change in use,…”
- Alteration, filed Feb 28, 2022, estimated cost $57K, described as “Dish-Installation of new antennas, RRH units, equip cabinet on new steel platform and GPS antenna on the roof. Installation of conduits and service room connection as per plans.All work is in compliance with TPPN 5/98.No change in use,…”
- Alteration, filed Nov 18, 2019, described as “Installation of sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 15, 2019, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
Property taxes
- Assessment
- $43,314,314
- 2026–27 tax
- $4,487,587
- Market value (city estimate)
- $96,254,000
- Taxable value
- $39,896,078
- Assessed land
- $3,020,855
- Assessed improvements
- $40,293,459
- Condo units with their own tax lots
- 167
Tax breaks
- Nonprofit exemption (faculty and student housing), with no end date, about $44,708 a year below the full tax.
- Co-op and condo abatement, with no end date, a $324,819 credit this tax year.
Zoning
R8: floor area ratio 11.35 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Sep 28, 2026: $1,285,000, Apt 6B
- Jul 20, 2026: $2,600,000, Apt 20A
- Jun 11, 2026: $1,257,500, Apt 10B
- Jan 9, 2026: $2,550,000, Apt 8C
- Nov 5, 2025: $890,000, Apt 8K
- Sep 5, 2025: $3,125,000, Apt 24B
- Aug 13, 2025: $1,200,000, Apt 7D
- Jun 18, 2025: $2,551,001, Apt 4C
- May 9, 2025: $1,300,000, Apt 16H
- Mar 24, 2025: $4,250,000, Unit PHA N
The 10 most recent of 73 open-market sales since 2016, from the Department of Finance’s sales files.