## Building permits

- Alteration, filed Feb 5, 2024, estimated cost $250K, described as “Provide replacement of existing sanctuary ac equipment in kind per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Feb 5, 2024, estimated cost $736K, described as “Mechanical scope of HVAC installation per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Feb 5, 2024, estimated cost $440K, described as “Modification of transon to accomodate new louvers as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Feb 5, 2024, estimated cost $60K, described as “Structural application filed for 1ST and roof floor framing in conjunction with gym renovations as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Feb 5, 2024, estimated cost $87K, described as “Sprinkler instllation as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jun 23, 2023, estimated cost $30K, described as “Steel dunnage installation for HVAC unit support per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Apr 6, 2023, estimated cost $1.2M, described as “Mechanical application for the removal and replacement of cooling tower as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Oct 25, 2022, estimated cost $80K, described as “Replacement boiler as per plans filed. No change to use, egress, or occupancy.”
- Alteration, filed Oct 1, 2021, estimated cost $5K, described as “Temporary installation of heavy duty sidewalk shed and pipe scaffold as per drawings during deneral construction work. No change in use, egress and occupancy. Sidewalk shed and pipe scaffold to comply with chapter 33 of the NYC building…”
- Alteration, filed Aug 27, 2020, estimated cost $5K, described as “Installation of heavy duty sidewalk shed and pipe scaffold as per drawings during general construction work. No change in use, egress, or occupancy. Sidewalk shed and scaffold to comply with chapter 33 of the NYC building code of 2014.”
- Alteration, filed Mar 19, 2020, described as “Installation of temporary supported scaffold as roof protection per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”

## Property taxes

- Assessment: $7,083,450
- Market value (city estimate): $15,741,000
- Taxable value: $0
- Assessed land: $3,870,000
- Assessed improvements: $3,213,450

## Tax breaks

- Nonprofit exemption (house of worship), with no end date, about $768,413 a year below the full tax.

## Zoning

R10A: floor area ratio 1.71 built, 10.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of West End Collegiate Church and Collegiate School: Individual Landmark, West End-Collegiate Historic District Extension (Historic District). 32 Landmarks Preservation Commission permits are on file.