101 West End Avenue, Manhattan
Apartment building · 503 units · built 1999 · Block 1171, Lot 62.
Building permits
- Alteration, filed Jun 3, 2024, estimated cost $150K, described as “Limited concrete repairs within parking garage cellar and sub-cellar”
- Alteration, filed Mar 9, 2023, estimated cost $1.2M, described as “Exterior facade restoration as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Oct 17, 2022, estimated cost $30K, described as “Installation of heavy duty sidewalk shed as per plans. No change in use occupancy or egress under this application. Sidewalk shed shall comply with chapter 33 of the 2014 NYC building code.”
- Alteration, filed Sep 27, 2021, estimated cost $40K, described as “MH work for interior renovation of 3rd FL (apts 4F, 4G, 4Q & 4R). Relocation of 2 exist. PTAC units, duct work/insulation, demo & removal of MH items, connect toilet exhaust, kitchen exhaust, &/or laundry exhaust to exist. base bldg risers…”
- Alteration, filed Sep 24, 2021, estimated cost $95K, described as “Filing of plumbing work to accommodate interior renovation of the 3rd FL (Marketing: 4th FL - Apartments 4F, 4G, 4Q & 4R) as per plans submitted herewith. No change in use, egress of occupancy.”
- Alteration, filed Sep 1, 2021, estimated cost $108K, described as “Interior renovation of the 3RD floor (apartments 4F, 4G, 4Q & 4R) as per plans submitted herewith. Construction floor: 3RD. Marketing floor: 4TH. No change to use, egress or occupancy.”
- Alteration, filed Jun 24, 2020, estimated cost $40K, described as “In cellar floor parking garage, replace existing cogen system radiator.”
- Alteration, filed Dec 30, 2019, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 29, 2019, estimated cost $250K, described as “Structural work for tenant amenity roof deck.”
- Alteration, filed Oct 16, 2019, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 16, 2019, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Sep 3, 2019, described as “Installation of scaffold as hoist runback structure per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Aug 22, 2019, estimated cost $65K, described as “Installation of new plumbing fixtures (sinks, gas bbq, ice marker, RPZ primary, RPA secondary) on roof deck.”
- Alteration, filed Aug 22, 2019, estimated cost $50K, described as “Application filed for mechanical work for ventilation system & associated ducts & piping.”
- Alteration, filed Jul 25, 2019, estimated cost $4.0M, described as “Plumbing work as shown on plans for the mentioned units”
- Alteration, filed Jul 18, 2019, estimated cost $1.1M, described as “Plumbing work shown on plans at units 4M, 4W, 5HH, 5J, 5P, 5T, 6H, 6N, 6T, 7P,7V, 8AA, 8U, 8V, 9BB, 9C, 9H, 9N, 9P, 10U, 11G, 11Q, 11V, 12H,12V, 17C, 17E, 17G, 17N, 18A, 18F,18N, 19M, 20C, 21D, 22F, 24C,25H, 28B, 28D, 29G, 34B, 34C, 34D,…”
- Alteration, filed Jul 18, 2019, estimated cost $5K, described as “Install medium duty scaffolding as per plans. No change in use , egress, occcupancy under this application. Pipe scaffolding shall comply with chapter 33 of the NYC building code. Sidewalk shed filed under separate application”
- Alteration, filed Jul 15, 2019, estimated cost $3K, described as “Installation of heavy duty sidewalk shed for remedial repairs. No change in use occupancy or egress under this application. Sidewalk shed shall comply with chapter 33 of the 2014 NYC building code.”
Property taxes
- Assessment
- $73,008,900
- 2026–27 tax
- $4,606,224
- Market value (city estimate)
- $162,242,000
- Taxable value
- $37,030,500
- Assessed land
- $6,750,000
- Assessed improvements
- $66,258,900
Tax breaks
- 421-a exemption, through Jun 30, 2039, about $4,475,353 a year below the full tax.
Zoning
C4-7: floor area ratio 23.01 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Sep 13, 2018: $416,100,000
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- 101 WEST END AVE (City Planning P2000M0288): Completed, decided Aug 21, 2000. 1ST MOD TO RESTRICTIVE DECL (D-143) TO PROVIDE A GYM ANNEX*TO THE 59TH ST RECREATION CENTER OR AN ATHLETIC FIELD & RECR*CENTER UPGRADE (FUNDING BY TISHMAN & CONSTRUCTED BY DPR)
- ABC STUDIOS WEST END AVE (City Planning P1992M0376): Completed, decided Jan 30, 1999. 92DCP052M: REZONING & SPECIAL PERMIT TO EXPAND PRESENT ON-SITE STUDIO & STORAGE SPACE FOR RESIDENTIAL, RETAIL, COMM'L USE AS WELL AS A 350 SPACE PUBLIC PARKING FACILITY
- ABC STUDIOS WEST END AVE PROJ (City Planning P1992M0479): Completed, decided Jun 7, 1993. 92DCP052M: REZONING & SPECIAL PERMIT TO EXPAND PRESENT ON-SITE STUDIO & STORAGE SPACE FOR RESIDENTIAL, RETAIL, COMM'L USE AS WELL AS A 350 SPACE PUBLIC PARKING FACILITY