301 Freedom Place South, Manhattan
Public School · built 2016 · Block 1171, Lot 151.
Building permits
- Alteration, filed Aug 25, 2026, estimated cost $49K, described as “9th Cycle FISP Repair. No change to use, occupancy, or egress.”
- Alteration, filed Feb 5, 2025, estimated cost $10K, described as “Installation of 300 psf sidewalk shed as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Jan 22, 2025, estimated cost $50K, described as “Backflow preventer device installation. No change in use, egress or occupancy. DEP Approval #24101650.”
- Alteration, filed Aug 1, 2024, estimated cost $380K, described as “Modification of the existing steel frame supporting the acoustic screen to allow for the expansion of the screen”
- Alteration, filed Jun 4, 2024, estimated cost $47K, described as “Intallation of non load bearing partitions as per plans.”
- Alteration, filed Dec 22, 2023, described as “FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Kenneth Cole”
- Alteration, filed Aug 25, 2022, estimated cost $12K, described as “2 new sprinkler heads installed; 11 existing sprinkler heads relocated; 1 existing sprinkler heads to be removed, as per plans filed herewith. No change to use, occupancy or egress in the building is included in this filing application.”
- Alteration, filed Aug 25, 2022, estimated cost $32K, described as “Install a new single-use bathroom and sink on the First Floor as per plans filed herewith. No change to use, occupancy or egress in the building filed under this application.”
- Alteration, filed Aug 25, 2022, estimated cost $15K, described as “Work is to modify ductwork and piping to suite new architectural layout on the First floor, relocating chilled beams and providing new VAV box. There is no change to use, occupancy or egress of the building filed under this application.”
- Alteration, filed Aug 25, 2022, estimated cost $214K, described as “Selective demolition of non-load bearing interior partitions. Installation of new non-load bearing partitions, fixtures and finishes as per plans filed herewith. No change to use, occupancy or egress in this building is filed under this…”
- Alteration, filed Nov 16, 2020, estimated cost $80K, described as “Installation of Hot water pump, associated ducts and piping”
- Alteration, filed Feb 26, 2018, estimated cost $250, described as “Non illuminated non advertising accessory identification sign on existing canopy - inside property line. No change of use, egress or occupancy.”
Building history
- New Building — Mid-Rise, filed Dec 29, 2014, signed off Oct 21, 2020, 10 stories, described as “New building. Sub cellar, cellar, 1ST thru 10TH floors and roof.architectural work.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $27,202,050
- Market value (city estimate)
- $60,449,000
- Taxable value
- $0
- Assessed land
- $3,031,650
- Assessed improvements
- $24,170,400
Tax breaks
- Nonprofit exemption (school), with no end date, about $2,950,878 a year below the full tax.
Zoning
R10: floor area ratio 6.07 built, 10.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Collegiate School at Riverside South (City Planning P2013M0272): Completed, decided Apr 20, 2015. Modification of 1992 special permits for large-scale general development to facilitate construction of a 9-story, 124,000 sf school in Riverside South. Modification of the associated restrictive declaration to reflect the modification to…