205 West End Avenue, Manhattan
Condominium · 543 units · built 1962 · Block 1179, Lot 7503.
Building permits
- Alteration, filed Feb 3, 2026, estimated cost $13K, described as “Scope of work in unit 26T on 26TH floor, removal and installation of non-loadbearing partitions as shown on plans. All plumbing work filed under separate application. No change to egress, use, or occupancy.”
- Alteration, filed Dec 23, 2025, estimated cost $160K, described as “Install split system air conditioning units.”
- Alteration, filed Nov 3, 2025, estimated cost $49K, described as “Combination apartments 15E and 15F in accordance to TPPN03/97, including minor layout changes, electrical, lighting and plumbing work. No change in use, egressand/or occupancy.”
- Alteration, filed Oct 15, 2025, described as “Installation and use of suspended scaffold for facade restoration/ inspection as per plans submitted”
- Alteration, filed Aug 14, 2025, estimated cost $129K, described as “Alt type 2 to combine apt 10D & 10E. Remove kitchen at 10E and new laundry room. Upgrade one existing bathroom. Remove tub and new shower, replaced toilet and vanity. New wookd floor new framing and doors. No change in use, egress or…”
- Alteration, filed Feb 6, 2025, estimated cost $133K, described as “Renovation and combination of apartments 27M/N and 27P. Plumbing filed under subsequent filing M01173519-S1. No change to use. egress, or occupancy. Also filing to superseding application number 101891124”
- Alteration, filed Sep 17, 2024, estimated cost $110K, described as “Herewith file plans to combine Apts. 27R and 27S per TPP memo 3/97, - Renovate 27S bath (No work in 27R bath)- Renovate 27R Kitchenette-27S kitchen to become laundry room-modifications to non-structural partitions-upgrade to finishes…”
- Alteration, filed Sep 13, 2024, estimated cost $626K, described as “Filing for combination of co-op apt. 29R&29P on 29TH flr. Work includes removal of non-structural interior walls. Changes to layout of kitchen. Relocating plumbing fixtures. Repairing & replacing interior finishes. No change to use, egress…”
- Alteration, filed May 21, 2024, estimated cost $6K, described as “Replace existing bathroom fixtures as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed May 20, 2024, estimated cost $32K, described as “Removal of ductwork filed in conjuction with interior renovation of the apartment as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed May 11, 2024, estimated cost $120K, described as “Combination of apartments 19W and 20W on the 18th and 19th Architectural Floors / 19th and 20th Marketing Floors. Application filed as per TPPN #3/97. Interior non-structural partitions, finishes as shown on plans. No change in Use, Egress…”
- Alteration, filed Mar 15, 2024, estimated cost $32K, described as “Removal and installation of non bearing partitions and related finishes as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Mar 8, 2024, estimated cost $27K, described as “CO 114236 for 101244020 was issued for accessory gym Subsequent CO's issued missed adding this. We are filing to get a Letter of completion for the accessory gym. Used only by building occupants”
- Alteration, filed Dec 19, 2023, estimated cost $88K, described as “Combination of apts filed under tppn 3/97 in conjunction with DOB now pl. No change to use, occupancy or egress.”
- Alteration, filed Sep 13, 2023, estimated cost $70K, described as “Garage repairs as per plans submitted herewith. There is no change in use, egress or occupancy.”
- Alteration, filed Sep 7, 2023, estimated cost $55K, described as “Interior renovation and partial combination of two apartments as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Sep 7, 2023, estimated cost $2K, described as “Ductwork from one new bathroom to existing ventilation shaft as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Sep 7, 2023, estimated cost $18K, described as “Renovation of bathroom and new plumbing fixtures instalation as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Jun 28, 2023, estimated cost $213K, described as “Application filed for interior renovation and combination of apartment unit 16M & 16N as per tppn #3/97. No change in use, occupancy, or egress.”
- Alteration, filed Jun 28, 2023, estimated cost $60K, described as “Filing for the Interior Renovation of Unit 19L as per plans herewith. No Change in Use, Egress or Occupancy.”
- Alteration, filed Feb 22, 2023, estimated cost $13K, described as “Replacement of plumbing fixtures and gas range on existing piping.”
- Alteration, filed Feb 22, 2023, estimated cost $80K, described as “Removal and installation of interior partitions and fixtures. No change in use, egress or occupancy.”
- Alteration, filed Feb 15, 2023, estimated cost $46K, described as “Interior renovation in apt 11E filed in conjunction with DOB now pl. No change to use, occupancy or egress.”
- Alteration, filed Feb 7, 2023, estimated cost $60K, described as “Alterations to existing apartment 5V on the 5th Floor. Minor modifications of interior non-structural partitions demo and installations, finishes as shown on plans. Plumbing Work filed under DOB NOW M00817021-I1. No change in Use, Egress…”
- Alteration, filed Feb 7, 2023, estimated cost $18K, described as “Plumbing Work related to alterations of apartments 5V on the 5th Floor, Plumbing fixtures modifications as shown on plans. In conjunction w/ General Construction Work filed under DOB NOW Job Number M008167939-I1.”
22 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $70,594,429
- 2026–27 tax
- $6,940,356
- Market value (city estimate)
- $156,876,505
- Taxable value
- $65,163,975
- Assessed land
- $11,213,101
- Assessed improvements
- $59,381,328
- Condo units with their own tax lots
- 8
Zoning
R8: floor area ratio 7.09 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Sep 30, 2026: $942,500
- Aug 26, 2026: $1,850,000
- Aug 26, 2026: $760,000
- Aug 17, 2026: $1,500,000
- Jul 29, 2026: $770,000, Apt 1A
- Jun 10, 2026: $999,000
- Jun 8, 2026: $415,000
- May 26, 2026: $400,000
- Apr 27, 2026: $1,115,000
- Apr 1, 2026: $760,000
The 10 most recent of 216 open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- Change to an earlier grant (Board of Standards and Appeals 1330-66-BZ): Change to an earlier grant, Granted, filed Jun 5, 2007, decided Sep 11, 2007. Extension of Time to request a variance, originally granted under §60(3) of the Multiple Dwelling Law.