# 235 West End Avenue, Manhattan

Condominium · 148 units · built c. 1929 · Block 1182, Lot 7501.

On Umarelli: https://umarelli.org/nyc/1011827501/235-west-end-avenue

More construction in Upper West Side: https://umarelli.org/nyc/manhattan/upper-west-side.md

Every lot on block 1182: https://umarelli.org/nyc/manhattan/1182.md

## Building permits

- Alteration, filed Jun 16, 2026, estimated cost $40K, described as “Filing interior partial renovation of apartment 3H on the 3RD floor and create new penetrations for ac installation; no change to use, egress or occupancy. Proposed work has no effect on structural stability.”
- Alteration, filed Jan 12, 2026, estimated cost $76K, described as “Partial demolition of non-load bearing partitions, doors, floor & wall finishes. New work is new doors, flooring, remodeled Kitchen & Bathroom finishes, hard wired SD/CO detectors. Plumbing to be filled under an LAA. No change to use,…”
- Alteration, filed Dec 22, 2025, estimated cost $18K, described as “Plumbing fixtures replacement for kitchen and bath in apt. 8D as per plans filed herewith. No architectural work proposed. No change to use, egress or occupancy.”
- Alteration, filed Dec 10, 2025, estimated cost $2K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 22, 2024, described as “Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.”
- Alteration, filed Jan 23, 2024, estimated cost $474K, described as “Facade repairs as indicated on the plans filed herewith. No change in used, egress or occupancy.”
- Alteration, filed Nov 17, 2023, estimated cost $3K, described as “Installation of a temporarily Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Nov 17, 2023, estimated cost $12K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Apr 3, 2023, estimated cost $22K, described as “Filing for related plumbing work and fixtures replacement as per plans. No change in use, egress or occupancy.”
- Alteration, filed Apr 3, 2023, estimated cost $278K, described as “Renovation of penthouse apartment c as per plans. Non-load bearing partittions alerations. Replacement of plumin fixtures to be filed under separate application. No change in use, egress or occupancy.”
- Alteration, filed Aug 12, 2021, estimated cost $3K, described as “Installation of a new washer and sink only”
- Alteration, filed May 5, 2021, estimated cost $11K, described as “Interior alteration to replace the existing finished floor and sub floor throughout the apartment. No change in use, occupancy or egress.”
- Alteration, filed Oct 19, 2020, estimated cost $5K, described as “Renovation of apt. 1D. Work to include minor interior demolition, general construction and plumbing modifications as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Dec 5, 2019, estimated cost $10K, described as “Interior architectural and plumbing modifications per plans to apt. #10F. No change in use, egress, or occupancy.”
- Alteration, filed Nov 15, 2019, estimated cost $26K, described as “Minor plumbing as per plans. No change of use, egress or occupancy under this application.”
- Alteration, filed Oct 16, 2019, estimated cost $20K, described as “Remove the existing kitchen equipment and bathroom fixtures and replace the kitchen equipment and bathroom fixtures. No change of egress, or occupancy under this application.”
- Alteration, filed Nov 30, 2017, estimated cost $10K, described as “Installation of pipe scaffold (+/-)451'-0" long and 12'-0" / 18'-0" high on roof to penthouse and water tank tower inside wall as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”

## Property taxes

- Assessment: $22,874,856
- 2026–27 Tax: $2,089,417
- Market value (city estimate): $50,832,999
- Taxable value: $19,379,886
- Assessed land: $2,902,478
- Assessed improvements: $19,972,378
- Condo units with their own tax lots: 148

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $241,361 credit this tax year.

## Zoning

R8B: floor area ratio 9.55 built, above the 4.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Sep 16, 2026: $725,000, Apt 3C
- Aug 28, 2026: $835,000, Apt 7B
- Apr 8, 2026: $850,000, Apt 15E
- Dec 8, 2025: $650,000, Apt 1G
- Sep 25, 2025: $885,000, Apt 8D
- Aug 5, 2025: $795,000, Apt 16A
- Oct 3, 2024: $732,500, Apt 5G
- Sep 24, 2024: $799,000, Apt 3A
- Aug 30, 2024: $720,000, Apt 9G
- Aug 12, 2024: $1,695,000, Apt 6J

The 10 most recent of 51 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of West End-Collegiate Historic District Extension (Historic District). 37 Landmarks Preservation Commission permits are on file.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
