# 310 West 72nd Street, Manhattan

Co-op · 120 units · built c. 1924 · Block 1183, Lot 37.

On Umarelli: https://umarelli.org/nyc/1011830037/310-west-72-street

More construction in Upper West Side: https://umarelli.org/nyc/manhattan/upper-west-side.md

Every lot on block 1183: https://umarelli.org/nyc/manhattan/1183.md

## Building permits

- Alteration, filed Oct 30, 2026, estimated cost $115K, described as “Interior renovation existing coop apts. #1D. Work to include demolition, general construction and finishes. No change in use, egress or occupancy.”
- Alteration, filed Sep 28, 2026, estimated cost $125K, described as “New 10 gage chimney liner. New underground breeching. No change in means of egress use group or occupancy.”
- Alteration, filed Mar 23, 2026, estimated cost $401K, described as “Interior renovation & combination of existing coop apts. #16B and PH3. Work to include demolition, general construction and finishes. Apts. combined in compliance with TPPN 3/97. No change in use, egress or occupancy.”
- Alteration, filed Oct 17, 2025, estimated cost $40K, described as “Replacement of existing mini-split units and associated condensing units, and installation of newmini-split systems and condensing units as per the plans, maintaining the same number of units inplace. Demolition of primary bedroom closet…”
- Alteration, filed Sep 16, 2025, estimated cost $90K, described as “Renovate apt. 12GH, general construction to include minor finish and cabinet removal, new finishes and cabinetry per plans filed. No change to use occupancy or egress”
- Alteration, filed Apr 1, 2025, estimated cost $242K, described as “Interior renovation at apr 7H. Remove and construct non-bearing or non-structural partitions. All work as per plan. No change in use, egress or occupancy.”
- Alteration, filed Mar 25, 2025, estimated cost $56K, described as “Hereby filing for the interior renovation of existing apartment #16A located on the 15TH floor. No change to use occupancy or egress.”
- Alteration, filed Aug 16, 2024, estimated cost $100K, described as “Interior renovation as indicated on the drawings filed herewith.”
- Alteration, filed Jan 31, 2023, estimated cost $131K, described as “Renovation to include minor removal and installation of non load bearing interior partitions and finishes. Replace and relocate plumbing fixtures as per schedule b and plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jan 30, 2023, estimated cost $21K, described as “Replace and relocate plumbing fixtures as per schedule b and plans filed herewith. No change, etc.”
- Alteration, filed Jun 7, 2022, estimated cost $8K, described as “Bathroom renovation remove and replace water closet and lavatory installation of tub general construction work filed under a separate application.”
- Alteration, filed Jun 4, 2022, estimated cost $6K, described as “General construction application. Bathroom renovation. Remove and replace partitions and doors. Installation of new tile floor. No change in use, egress or structure. Plumbing work will be filed under a separate application.”
- Alteration, filed Apr 28, 2022, estimated cost $34K, described as “Plumbing work at Apt. #6G & #6F at 6th floor indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application”
- Alteration, filed Apr 27, 2022, estimated cost $139K, described as “General Construction to combine apartments #6F and 6G at 6th floor indicated on drawings filed herewith. No change in Use Egress or occupancy under this application.”
- Alteration, filed Nov 24, 2021, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Aug 26, 2021, estimated cost $171K, described as “9th Cycle facade repair program. No change to use, egress or occupancy.”
- Alteration, filed Jul 20, 2021, estimated cost $15K, described as “Replace existing plumbing fixtures. new Dishwasher. All work at Apt 9C in conjunction with general construction filed under M00555996.”
- Alteration, filed Jul 20, 2021, estimated cost $40K, described as “Renovate existing apt 9C. New interior doors, repair flooring. replacing cabinetry. Patch existing walls.”

## Building history

- Major Renovation — Conversion, filed Jul 16, 2002, permit issued - entire job/work, 117 units added, 15 stories, described as “Combining existing doctor's office (Apt. 1G) with Apt. 1H (Res.) into one doctors office - filed in conjunction with approved application #103079810. Changing Apt. 1D (Res.) into a doctors office; Existing doctors office Apt. 1F to remain…”
- Major Renovation — Conversion, filed Aug 19, 1997, permit issued - entire job/work, 118 units added, 15 stories, described as “Combine apartments 12G and 12H on the 12 th floor. Interior demolition, erect partitions and install sanitary fa cilities, as per plans filed herewith. Obtain amended c of o.”
- Major Renovation — Conversion, filed Jun 5, 1990, permit issued - partial job, 117 units added, 15 stories, described as “Combine two apts on 4TH floor (4A &amp; 4B) into one apt. Structural stblity will not be affected. Remove existing fixtures, cabinets &amp; appliances, cap all plumbing fixtures in former kitchen of apt. 4B.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $14,795,100
- 2026–27 Tax: $1,424,091
- Market value (city estimate): $32,878,000
- Taxable value: $12,990,610
- Assessed land: $2,745,000
- Assessed improvements: $12,050,100

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $190,787 credit this tax year.

## Zoning

R10A: floor area ratio 11.24 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- May 20, 2026: $865,000
- Jan 27, 2026: $399,000
- May 14, 2025: $4,700,000
- Feb 6, 2025: $2,995,000
- Jan 28, 2025: $2,990,000
- Dec 18, 2024: $1,400,000
- Dec 5, 2024: $1,650,000
- Sep 23, 2024: $1,850,000
- May 29, 2024: $775,000
- Mar 20, 2024: $3,087,500

The 10 most recent of 37 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of West End-Collegiate Historic District Extension (Historic District). 41 Landmarks Preservation Commission permits are on file.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
