330 West 72nd Street, Manhattan
Co-op · 63 units · built c. 1927 · Block 1183, Lot 46.
Building permits
- Alteration, filed Mar 6, 2026, estimated cost $28K, described as “Interior Renovation of Apt. 12D at the 12th floor, including general construction work. No change to egress, use or occupancy. The proposed work has no effect on the structural stability of existing building.”
- Alteration, filed Dec 9, 2025, described as “Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Diego Buri Cumbe”
- Alteration, filed Dec 23, 2024, estimated cost $98K, described as “New chimney liner. New breeching. New gas meter room. No change in means of egress use group or occupancy.”
- Alteration, filed Jul 15, 2024, estimated cost $205K, described as “Interior renovations including new opening for mechanical unit as per plans filed herewith. No change to use, egress or occupancy”
- Alteration, filed May 9, 2022, estimated cost $6K, described as “Replacement of exisitng gas meter bar as per code requirements. Plan pl-001.02 to be revised”
- Alteration, filed May 5, 2022, estimated cost $45K, described as “Filing herewith application for window replacement as per plans submitted. No change in use, egress or occupancy.”
- Alteration, filed May 5, 2022, estimated cost $50K, described as “Amended plans for new ceiling soffit detail and floor and wall repair detail. Add progress instpection fire rated construction all plan changes have been bubbled”
- Alteration, filed Mar 21, 2022, estimated cost $2K, described as “Installation of vent for dryer appliance; in conjuction with PL # M00643505-I1”
- Alteration, filed Mar 21, 2022, estimated cost $6K, described as “Filed herein installation of new fixtures as per plans in apartment 12B; in conjunction with MS #M00651092-I1”
- Alteration, filed Nov 23, 2021, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 11, 2021, described as “Installation of temporary sidewalk shed as per plan. No change in use,egress or occupancy.”
- Alteration, filed Sep 10, 2021, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jul 14, 2021, estimated cost $268K, described as “Combination of apartments 9C and 9D on the 9TH floor into one apartment as per tppn 3-97.interior renovation.creation of an additional bedroom. No change to use, egress, or occupancy.”
- Alteration, filed Jul 14, 2021, estimated cost $36K, described as “Cap and remove, relocate, replace, and install new fixtures.”
- Alteration, filed May 18, 2021, estimated cost $13K, described as “Modifications to existing plumbing in apartment 13B”
- Alteration, filed May 18, 2021, estimated cost $80K, described as “General construction to include, partitions, lighting, tilework, cabinetry, doors, waterproofing, firestopping.”
- Alteration, filed Apr 14, 2021, estimated cost $38K, described as “Renovation of existing apartment 6A. Kitchen and bathroom work to be done. No change of use, egress or occupancy under this application.”
- Alteration, filed Mar 23, 2021, estimated cost $77K, described as “Renovation of existing apartment 6A. New Mechanical systems for heating and cooling by through-window condensers. No change of use, egress or occupancy under this application.”
- Alteration, filed Mar 22, 2021, estimated cost $140K, described as “Interior Renovation of CO-OP Apartment .#6A to include removal and installation of partitions, kitchens and bathrooms. Exterior work for new opening for thru wall AC units. No change of use, egress or occupancy.”
- Alteration, filed Feb 15, 2021, described as “Pipe Scaffolding installed per plans, no change in use, egress or occupancy”
- Alteration, filed Jan 21, 2021, described as “Pipe scaffold proposed installation of pipe scaffold as per plan. No change in use,egress or occupancy.”
- Alteration, filed Jan 21, 2021, described as “Sidewalk shed proposed installation of sidewalk shed as per plan. No change in use,egress or occupancy.”
- Alteration, filed Dec 18, 2020, estimated cost $46K, described as “Install HVAC systems in conjunction with the apartment renovation. No change in use,egress or occupancy.”
- Alteration, filed Dec 18, 2020, estimated cost $51K, described as “Filing plumbing work in conjunction with the renovation of the apartment.”
Building history
- Alteration, filed Sep 24, 2015, permit issued - entire job/work, units 61 to 62, described as “Legalization of two apartments on the ph and related work.”
- Major Renovation — Conversion, filed Jun 8, 2004, signed off Jul 12, 2010, 60 units added, 15 stories
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $12,928,050
- 2026–27 Tax
- $1,172,985
- Market value (city estimate)
- $28,729,000
- Taxable value
- $11,161,560
- Assessed land
- $1,561,500
- Assessed improvements
- $11,366,550
Tax breaks
- Co-op and Condo Abatement, with no end date, a $193,918 credit this tax year.
Zoning
R10A: floor area ratio 11.57 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Oct 6, 2026: $1,355,000
- Sep 28, 2026: $999,999
- Jun 11, 2026: $2,400,000
- Nov 6, 2025: $1,855,000
- Jun 17, 2025: $875,000
- Jan 21, 2025: $1,450,000
- Feb 7, 2024: $1,400,000
- Jul 12, 2023: $2,100,000
- Aug 30, 2022: $1,270,000
- May 18, 2022: $985,000
The 10 most recent of 24 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of West End-Collegiate Historic District Extension (Historic District). 50 Landmarks Preservation Commission permits are on file.