305 West 72nd Street, Manhattan
Co-op · 46 units · built c. 1913 · Block 1184, Lot 7.
Building permits
- Alteration, filed May 5, 2026, estimated cost $85K, described as “Interior renovation of apartment 8B on the 008 floor. No change in use, occupancy, or egress.”
- Alteration, filed Nov 5, 2025, estimated cost $179K, described as “Application filed for the repair/replace of partitions, ceiling, & finishes in kitchen and bathroom. All work is non-structural. No change to use, egress, or occupancy.”
- Alteration, filed Sep 18, 2025, estimated cost $20K, described as “Interior renovation of the existing residential unit #9C. No change is use, occupancy or egress with this filing.”
- Alteration, filed May 9, 2025, estimated cost $36K, described as “Interior Renovations of Apartment 3D as per plans. Demolition of existing finishes, lighting fixtures and power receptacles. Installation of new finishes lighting fixtures and power receptacles. No change to Use, Egress or Occupancy under…”
- Alteration, filed Apr 9, 2025, estimated cost $8K, described as “Replace existing evaporator within apartment 4AD. No change in use, egress, or occupancy.”
- Alteration, filed Apr 4, 2025, estimated cost $25K, described as “Facade repairs and restoration per plans. There is no change in occupancy use or egress under this application”
- Alteration, filed Nov 13, 2024, described as “Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.”
- Alteration, filed Nov 12, 2024, described as “Amendment for suspended scaffold out rigger system for facade restoration works”
- Alteration, filed Sep 6, 2023, estimated cost $15K, described as “Primary Bathroom: Relocate lavatory and convert tub to shower, replace toilet. Secondary Bathroom: New toilet, lavatory and shower. Half Bath: remove and cap toilet and lavatory. Kitchen: remove and cap gas stove. Relocate sink and…”
- Alteration, filed Aug 9, 2023, estimated cost $65K, described as “Renovate existing apt. 1B. Work to include partitions modification and doors as shown on drawings. No change to use, egress or occupancy.”
- Alteration, filed Jan 4, 2022, estimated cost $35K, described as “Mechanical work filed in conjunction with the renovation of an existing dwelling unit. Architectural and plumbing work filed under separate applications. No change of use, occupancy or egress.”
- Alteration, filed Jan 4, 2022, estimated cost $40K, described as “Plumbing work filed in conjunction with the renovation of an existing dwelling unit. Architectural and mechanical work as per plans. No change of use, occupancy or egress.”
- Alteration, filed Jan 4, 2022, estimated cost $80K, described as “Renovation of an existing dwelling unit. Architectural work as per plans. Plumbing and mechanical work filed under separate applications. No change of use, occupancy or egress.”
- Alteration, filed Sep 17, 2018, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use occupancy or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2014 code.”
Building history
- Major Renovation — Conversion, filed Mar 21, 2001, signed off Jan 21, 2004, 47 units added, 13 stories, described as “Propose to add 14TH floor”
- Major Renovation — Conversion, filed Oct 24, 1996, signed off Nov 12, 2003, 52 units added, 12 stories, described as “Combine two apartments into one apart- ment. Renovate two existing bath rooms and kitchen, add new guest bath room, add new window and enlarge exist- ing window and install new partitions as per plans.”
- Major Renovation — Conversion, filed Oct 25, 1995, signed off Mar 24, 1997, 49 units added, 12 stories, described as “Combination of two (2) existing class 'a " apartments on the seventh flo r. Minor partition and plumbing work,ame nded certificate of occupancy to be obt ined.”
- Major Renovation — Conversion, filed Jul 12, 1994, signed off Jan 29, 1999, 47 units added, 12 stories, described as “Propose to increase the floor area of the penthouse to make it into the 13TH floor.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $6,323,400
- 2026–27 Tax
- $670,457
- Market value (city estimate)
- $14,052,000
- Taxable value
- $5,963,400
- Assessed land
- $1,170,000
- Assessed improvements
- $5,153,400
Tax breaks
- Co-op and Condo Abatement, with no end date, a $71,176 credit this tax year.
Zoning
R10A: floor area ratio 9.15 built, 10.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Aug 6, 2026: $1,365,000
- Oct 8, 2025: $930,000
- May 15, 2025: $1,386,000
- Aug 15, 2024: $1,950,000
- Apr 6, 2023: $250,000
- Jan 5, 2023: $490,000
- Aug 11, 2022: $1,225,000
- Mar 9, 2022: $635,000
- Feb 24, 2022: $1,100,000
- Aug 30, 2021: $1,550,000
The 10 most recent of 18 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of West End-Collegiate Historic District Extension (Historic District). 44 Landmarks Preservation Commission permits are on file.