# 211 Central Park West, Manhattan

Co-op · 183 units · built c. 1929 · Block 1195, Lot 29.

On Umarelli: https://umarelli.org/nyc/1011950029/211-central-park-west

More construction in Upper West Side: https://umarelli.org/nyc/manhattan/upper-west-side.md

Every lot on block 1195: https://umarelli.org/nyc/manhattan/1195.md

## Building permits

- Alteration, filed Nov 10, 2026, estimated cost $66K, described as “Interior non structural demolition of partitions, ceiling and floors in an existing doctors office. No change to use, egress or occupancy under this application.”
- Alteration, filed Nov 4, 2026, estimated cost $340K, described as “Renovation of an existing dwelling unit. Architectural work as per plans. No change of use, occupancy or egress.”
- Alteration, filed Sep 22, 2026, estimated cost $275K, described as “Interior renovation of kitchen and 3 bathrooms. New central air conditioning system. Removal of non-load bearing partitions and minor new partition work as shown on plans.”
- Alteration, filed Jul 13, 2026, estimated cost $80K, described as “Replace doors in existing openings and replace existing windows with doors in modify masonry openings. No change to use, egress or occupancy.”
- Alteration, filed Jun 30, 2026, estimated cost $110K, described as “Four (4) window replacements in modified masonry openings and seven (7) louvers in modified and new masonry openings. No change to use, egress or occupancy.”
- Alteration, filed May 20, 2026, estimated cost $495K, described as “Interior renovation of an existing apartment including minor partition changes as per plans. No change of use, kgress or occupancy under this application.”
- Alteration, filed Apr 27, 2026, estimated cost $50K, described as “Repair existing chimney liner for existing fireplace as per plans. No change in use, occupancy or egress.”
- Alteration, filed Mar 12, 2026, estimated cost $800K, described as “Filing for interior renovation of apt 10/11C as per plans submitted herewith.”
- Alteration, filed Dec 30, 2025, estimated cost $580K, described as “Combination and Renovation of an existing apartments 16G and 17G on the 16th and 17th floors. work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Oct 3, 2025, estimated cost $3K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 3, 2025, estimated cost $3K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Sep 26, 2025, estimated cost $20K, described as “Renovation of existing bathroom”
- Alteration, filed Aug 7, 2025, estimated cost $57K, described as “Repair existing chimney liner for existing fireplace and install draft inducer as per plans. No change in use, occupancy or egress.”
- Alteration, filed Jul 31, 2025, estimated cost $262K, described as “Interior renovation of apartment 14K on the 14TH floor. No change in use, egress, or occupancy.”
- Alteration, filed Jul 18, 2025, estimated cost $636K, described as “Apartment combination of units 19D/20D per TPPN 3/97 including new floor slab penetration at 20fl for new stair, select window and door doors replacement from interior, interior non-structural partitions to be modified to accommodate…”
- Alteration, filed Jul 7, 2025, estimated cost $4K, described as “New masonry through wall opening for AC unit as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Jul 3, 2025, estimated cost $123K, described as “Interior renovation includes merging Apartment 3DA and 3DB. No change in use, egress and occupancy.”
- Alteration, filed Jun 6, 2025, estimated cost $107K, described as “Installation of new heating and air conditioning system and new exhaust system as per plans attached herewith. No change in use, egress and occupancy.”
- Alteration, filed Jun 6, 2025, estimated cost $50K, described as “Modification to the plumbing work as per plans attached herewith. No change in use, egress and occupancy.”
- Alteration, filed May 23, 2025, estimated cost $10K, described as “Architectural exterior modifications to apartments 14D on the 14th Floor. Removal of existing PTAC louver and brick-up in place of opening as per plans filed here with. No change in egress, occupancy, or use.”
- Alteration, filed May 23, 2025, estimated cost $405K, described as “Interior renovation of existing apt #14D on the 14h Floor. No change to use, egress or occupancy under this application. Plumbing and mechanical system works filed separately.”
- Alteration, filed Mar 25, 2025, estimated cost $486K, described as “Service courtyard vault and cellar repairs. No change to use, egress, or occupancy”
- Alteration, filed Dec 26, 2024, estimated cost $217K, described as “Interior renovation to existing apartment. General construction to include minor partition layout changes and new finishes,.plumbing and mechanical plans to be filed as subsequent applications to the I1 document.”
- Alteration, filed Dec 13, 2024, estimated cost $500K, described as “Removal and installation of non bearing partition and related finishes to renovate apartment, close masonry HVAC Sleeves, create new masonry opening for HVAC sleeve as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Nov 5, 2024, estimated cost $8K, described as “Mechanical Support Hangers. No changes in use, egress, or occupancy with this application.”

71 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1011950029/211-central-park-west.

## Property taxes

- Assessment: $70,089,300
- 2026–27 tax: $7,356,591
- Market value (city estimate): $155,754,000
- Taxable value: $67,901,370
- Assessed land: $11,745,000
- Assessed improvements: $58,344,300

## Tax breaks

- Co-op and condo abatement, with no end date, a $1,090,317 credit this tax year.

## Zoning

R10A (part of the lot is R8B): floor area ratio 14.89 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Aug 4, 2026: $3,279,300
- Jul 16, 2026: $7,915,000
- Jun 23, 2026: $6,312,500
- Jun 16, 2026: $5,800,000
- Jun 2, 2026: $1,650,000
- May 27, 2026: $1,500,000
- Mar 11, 2026: $2,700,000
- Sep 17, 2025: $8,500,000
- Sep 4, 2025: $800,000
- Aug 5, 2025: $9,435,000

The 10 most recent of 78 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of The Beresford Apartments: Individual Landmark, Upper West Side/Central Park West Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.

## Board and land use applications

- BERESFORD APARTMENTS (City Planning P1988M0203): Completed, decided Oct 29, 1987. LANDMARK-CITY COLLEGE OF NY, REMSEN CEMETERY,TROTTING\*COURSE LA; Additional LPC #(s): 497

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
