5 West 93rd Street, Manhattan
College · built c. 1900 · Block 1207, Lot 23.
Building permits
- Alteration, filed Jun 24, 2026, estimated cost $1K, described as “Installation of temporary pipe scaffold as per plan. No change in use, egress or occupancy.”
- Alteration, filed Jun 24, 2026, estimated cost $115K, described as “Filing herewith for temporary structural shoring in conjunction with renovation of existing school as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 23, 2026, estimated cost $3K, described as “Installation and use of temporary supported scaffold as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jun 23, 2026, estimated cost $3K, described as “Installation and use of temporary construction fence as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Jun 16, 2026, estimated cost $3K, described as “Installation and use of temporary sidewalk shed as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed May 1, 2026, estimated cost $262K, described as “Filing herewith facade repair as per plans, no change in use, egress or occupancy.”
- Alteration, filed Mar 27, 2026, estimated cost $3.5M, described as “Filing herewith interior renovation to include new kitchen and cafeteria and multipurpose space as per plans.”
- Alteration, filed Jun 12, 2025, estimated cost $375K, described as “Herewith filing architectural as per plans. No change in use, egress or occupancy”
- Alteration, filed Feb 25, 2025, estimated cost $105K, described as “Herewith filing architectural work for parapet replacement as per plans. No change in use, egress or occupancy”
- Alteration, filed Sep 26, 2024, estimated cost $1K, described as “Ulma Shoring system filing for slab supports as per plans filed herewith.”
- Alteration, filed Aug 23, 2024, estimated cost $1K, described as “Installation of temporary pipe scaffold as per plan. No change in use, egress or occupancy. Pipe scaffold stair tower and hoist bay at the east alley elevation from the ground to the top of the pool roof.”
- Alteration, filed Aug 22, 2024, estimated cost $1K, described as “Lateral wall bracing installation.”
- Alteration, filed Jun 11, 2024, estimated cost $30K, described as “Add a new partition and door on existing 2nd floor to create a new accessory office. There is no change in use, egress, or occupancy.”
- Alteration, filed May 8, 2024, estimated cost $310K, described as “Herewith filing architectural work for roof repairs as per plans. No change in use, egress or occupancy”
- Alteration, filed Jul 8, 2023, estimated cost $3K, described as “Installation and use of the temporary platform vim scaffolding as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Feb 14, 2023, estimated cost $8K, described as “Modification to the existing sprinkler system as per plans. No change to use, egress or occupancy”
- Alteration, filed Feb 13, 2023, estimated cost $3K, described as “Modification to the existing HVAC system as per plans. No change to use, egress or occupancy.”
- Alteration, filed Feb 13, 2023, estimated cost $38K, described as “Minor demolition, Installation of new interior partitions, Doors, frame and saddle frame suspended ceilings and finishes as per plans. No change to use, egress or occupancy.”
- Alteration, filed Jan 4, 2021, estimated cost $29K, described as “Install new chimney liner as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 25, 2020, estimated cost $75K, described as “Replace one (1) boiler and one (1) oil burner as per plans. No change in use, egress or occupancy.”
Property taxes
- Assessment
- $3,222,000
- Market value (city estimate)
- $7,160,000
- Taxable value
- $0
- Assessed land
- $1,683,000
- Assessed improvements
- $1,539,000
Tax breaks
- Nonprofit exemption (school), with no end date, about $349,523 a year below the full tax.
Zoning
R7-2: floor area ratio 1.86 built, 3.44 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.