# 360 Central Park West, Manhattan

Condominium · 88 units · built c. 1929 · Block 1209, Lot 7502.

On Umarelli: https://umarelli.org/nyc/1012097502/360-central-park-west

More construction in Upper West Side: https://umarelli.org/nyc/manhattan/upper-west-side.md

Every lot on block 1209: https://umarelli.org/nyc/manhattan/1209.md

## Building permits

- Alteration, filed Mar 17, 2026, estimated cost $35K, described as “Interior apartment plumbing renovation including fixture replacement and associated work as per plans. no change in use, egress or occupancy”
- Alteration, filed Jan 16, 2026, described as “Installation of industrial rope access for facade inspections”
- Alteration, filed Jan 5, 2026, estimated cost $1K, described as “Filing to obtain certificate of compliance for (1) ac unit installed on the roof under previously approved bis application.”
- Alteration, filed Oct 15, 2024, estimated cost $33K, described as “Removal and installation of mechanical ductwork and ac units in apartments 15C & 15D.”
- Alteration, filed Oct 15, 2024, estimated cost $309K, described as “Combination of apartments 15C & 15D as per tppn 3/97. Work to include the removal and installation of interior partitions , flooring and finishes. No change to use, egress or occupancy.”
- Alteration, filed Oct 14, 2024, estimated cost $74K, described as “Removal and installation of plumbing and gas fixtures in apartments 15C & 15D.”
- Alteration, filed Jun 26, 2024, estimated cost $120K, described as “Modification of mechanical system and installation of ac units in apt. 8A/9A.”
- Alteration, filed Jun 4, 2024, estimated cost $502K, described as “Combination of apartments 8A & 9A as per tppn 3/97. Work to include removal and installation of interior partitions, flooring and fixtures. No change in use, egress, or occupancy.”
- Alteration, filed Jun 4, 2024, estimated cost $102K, described as “Removal and installation of plumbing and gas fixtures in apt.8A/9A.”
- Alteration, filed May 22, 2024, estimated cost $100K, described as “Structural work related to the the installation of new stair between the 8TH and 9TH floors (apt. 8A/9A).”
- Alteration, filed May 2, 2024, estimated cost $21K, described as “Plumbimg work at 4TH floor as per plans filed herewith”
- Alteration, filed May 2, 2024, estimated cost $42K, described as “Interior renovation to combine apartments 4K and 4L, forming apartment 4KL, as per plans filed herewith”
- Alteration, filed Nov 22, 2023, estimated cost $70K, described as “Removal and installation of plumbing and gas fixtures.”
- Alteration, filed Nov 22, 2023, estimated cost $33K, described as “Removal and installation of mechanical ductwork and ac units.”
- Alteration, filed Sep 20, 2023, estimated cost $23K, described as “Proposed interior renovation work as per plan. No change in use, egress, or occupancy.”
- Alteration, filed Sep 19, 2023, estimated cost $121K, described as “Combination of apartments 16K & 16L as per tppn 3/97. Work to include the removal and installation of interior partitions , flooring and finishes. No change to use, egress or occupancy.”
- Alteration, filed Jul 17, 2023, estimated cost $23K, described as “Proposed interior renovation work as per plan. No change in use, egress, or occupancy.”
- Alteration, filed Jan 6, 2023, estimated cost $50K, described as “Submitted on behalf of contractor for the installation of emergency temporary construction equipment (scaffold) 1600 sf, no change in use, occupancy or egress”
- Alteration, filed Nov 4, 2022, estimated cost $33K, described as “Modification of mechanical ductwork.”
- Alteration, filed Nov 4, 2022, estimated cost $43K, described as “Removal and installation of interior partitions, flooring and finishes. No chnage in use, egress or occupancy.”
- Alteration, filed Nov 4, 2022, estimated cost $20K, described as “Modification of mechanical ductwork.”
- Alteration, filed Nov 4, 2022, estimated cost $33K, described as “Removal and installation of plumbing fixtures.”
- Alteration, filed Nov 4, 2022, estimated cost $121K, described as “Combination of apartments 9K & 9L as per tppn 3/97. Work to include the removal and installation of interior partitions , flooring and finishes. No change to use, egress or occupancy.”
- Alteration, filed Nov 4, 2022, estimated cost $63K, described as “Removal and installation of plumbing fixtures.”
- Alteration, filed Nov 2, 2022, estimated cost $1K, described as “Filing to obtain certificate of compliance for units installed under previously approved, permitted and signed off application.”

21 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1012097502/360-central-park-west.

## Property taxes

- Assessment: $17,414,054
- 2026–27 tax: $1,651,205
- Market value (city estimate): $38,697,861
- Taxable value: $14,413,770
- Assessed land: $2,993,869
- Assessed improvements: $14,420,185
- Condo units with their own tax lots: 104

## Tax breaks

- Nonprofit exemption (house of worship), with no end date, about $85,641 a year below the full tax.
- Nonprofit exemption (religious school), with no end date, about $93,326 a year below the full tax.
- Nonprofit exemption (parsonage), with no end date, about $48,743 a year below the full tax.
- Co-op and condo abatement, with no end date, a $139,007 credit this tax year.

## Zoning

R10A: floor area ratio 10.06 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Aug 12, 2026: $3,825,000, Apt 15CD
- Jul 23, 2026: $3,500,000, Apt 12E
- Jul 15, 2026: $3,500,000, Apt 11C
- Jul 13, 2026: $3,595,000, Apt 11E
- May 15, 2026: $3,600,000, Apt 2B
- Mar 18, 2026: $6,850,000, Apt 8A
- Mar 18, 2026: $3,200,000, Apt 11E
- Oct 2, 2025: $5,575,000, Apt 9B
- Jul 2, 2025: $2,840,000, Apt 16K
- Mar 24, 2025: $1,170,000, Apt 14E

The 10 most recent of 69 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of Upper West Side/Central Park West Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
