# 100 West 94th Street, Manhattan

Co-op · 162 units · built 1966 · Block 1224, Lot 29.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/1012240029/100-west-94-street

More construction in Upper West Side: https://umarelli.org/nyc/manhattan/upper-west-side.md

Every lot on block 1224: https://umarelli.org/nyc/manhattan/1224.md

## Building permits

- Alteration, filed Jul 24, 2026, estimated cost $375K, described as “Filing for Local Law 11 faade repairs work that includes brick masonry repairs, replacement and/or repair of windowsills, repair of eroded mortar joints, etc. a”
- Alteration, filed Nov 6, 2025, estimated cost $45K, described as “Interior renovation of apt. 5A on the 5TH floor. No change to use, egress, or occupancy.”
- Alteration, filed May 1, 2025, described as “Installation and use of temporary suspended scaffold for facade repairs as per plans filed herewith. No change to use, egress or occupancy under this application.”
- Alteration, filed Apr 12, 2025, estimated cost $100K, described as “Proposed interior renovation of apartment # 18G”
- Alteration, filed Mar 13, 2025, estimated cost $80K, described as “Minor interior renovation of existing apartment unit.”
- Alteration, filed Mar 2, 2025, estimated cost $65K, described as “Minor interior renovation of an existing unit 12 f as per plan ( apt 12F, floor 12)”
- No Work, filed Dec 9, 2024
- Alteration, filed Dec 2, 2024, described as “Installation and use of temporary suspended scaffold for facade repairs as per plans filed herewith. No change to use, egress or occupancy under this application.”
- Alteration, filed Oct 16, 2024, estimated cost $40K, described as “Interior renovation and combination of apts 11C and 11D on the 11TH floor. No change in use, egress or occupancy.”
- Alteration, filed Sep 18, 2024, estimated cost $40K, described as “Apt combination (Units 11F and 11E) to include interior renovation work.”
- Alteration, filed Sep 4, 2024, estimated cost $469K, described as “Herewith filing for replacement of comfort cooling system and kitchen exhaust equipment for existing first floor restaurant.”
- Alteration, filed Jul 26, 2024, estimated cost $118K, described as “Scope of Work to combine the Commercial Spaces as indicated. No change in use, occupancy or egress”
- Alteration, filed Feb 29, 2024, estimated cost $12K, described as “Scope of work to remove existing partitions as Indicated. No change in use, occupancy, or egress”
- Alteration, filed Jun 9, 2023, estimated cost $3K, described as “Installation of an illuminated business accessory sign . No change in use, egress or occupancy.”
- No Work, filed May 24, 2023
- Alteration, filed Apr 24, 2023, estimated cost $18K, described as “New plumbing work type filed in conjunction with DOB now gc appliation #M00863679. Relocation and installation of existing plumbing fixtues as per plan. No change in use, occupancy or means of egress.”
- Alteration, filed Apr 24, 2023, estimated cost $113K, described as “Refurbishing existing retail store at 1st floor as per plan. Plumbing work type to be filed under separate DOB NOW application. no change in use, occupancy, or means of egress.”
- Alteration, filed Apr 14, 2023, estimated cost $19K, described as “Repair, and replace facade to include masonry, pointing, stainless steel drip edge, concert patching and caulking. No removal of existing caulking.”
- Alteration, filed Mar 7, 2023, estimated cost $126K, described as “Application filed herewith for interior renovation at the apt. 5G on the 9TH floor as per plans attached herewith. No change to use, egress or occupancy.”
- Alteration, filed Mar 7, 2023, estimated cost $16K, described as “Plumbing work on apt 5G as per plans filed herewith. No change in use, egress and occupancy.”
- Alteration, filed Oct 7, 2022, estimated cost $200K, described as “Plumbing work in conjunction with revovation. No change in use, egress or occupancy.”
- Alteration, filed Oct 7, 2022, estimated cost $200K, described as “Interior renovation of 100 West 94th street units #18A. No change in use, egress, or occupancy.”
- Alteration, filed Jun 22, 2022, estimated cost $65K, described as “Structural repair of spalled concrete girder at (3) locations along its length, structural repair of (1) concrete beam at the 1st floor. Repairs consist of post installing additional reinforcement into concrete, splicing new rebar to…”
- Alteration, filed Feb 15, 2022, estimated cost $86K, described as “Cosmetic work only within existing eating & drinking establishment. No change to use, egress or occupancy.”
- Alteration, filed Feb 15, 2022, estimated cost $24K, described as “Installation of commercial cooking equipment and sinks”

4 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1012240029/100-west-94-street.

## Building history

- Alteration, filed Sep 27, 2006, permit issued - entire job/work, described as “Application filed to revise the Eating &amp; Drinking establishment from 120 persons to 149 persons located on the first floor as per plans filed herewith, no work to be done under this application. All Work filed under Application…”
- Major Renovation — Conversion, filed Sep 30, 1991, signed off Oct 5, 1992, 145 units added, 26 stories, described as “No work to be done;to amend c of o to reflect existing restaurant as was approved under alt.21/68.all work has been signed off.this appl.is to show the existing use on the c of o. Only.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $17,560,350
- 2026–27 Tax: $1,425,585
- Market value (city estimate): $39,023,000
- Taxable value: $13,681,627
- Assessed land: $3,816,000
- Assessed improvements: $13,744,350

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $280,237 credit this tax year.

## Zoning

C1-9 (part of the lot is R7-2): floor area ratio 8.47 built, 10.00 allowed by base zoning.

## Recent sales

- Oct 15, 2026: $750,000
- Aug 3, 2026: $735,000
- Jul 29, 2026: $1,349,000
- Jul 28, 2026: $675,000
- Mar 10, 2026: $720,000
- Jan 27, 2026: $720,000
- Dec 15, 2025: $1,295,000
- Sep 4, 2025: $1,425,000
- Aug 26, 2025: $1,275,000
- Jun 17, 2025: $885,000

The 10 most recent of 60 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology