# 498 West End Avenue, Manhattan

Condominium · 34 units · built c. 1912 · Block 1231, Lot 7502.

On Umarelli: https://umarelli.org/nyc/1012317502/498-west-end-avenue

More construction in Upper West Side: https://umarelli.org/nyc/manhattan/upper-west-side.md

Every lot on block 1231: https://umarelli.org/nyc/manhattan/1231.md

## Building permits

- Alteration, filed Oct 30, 2026, estimated cost $187K, described as “Renovation of an existing apartment to include general construction, minor demolition with installation of new non-load-bearing partitions, hung ceilings, flooring, millwork, doors and finishes as per plans. No change to use, egress or…”
- Alteration, filed Jul 24, 2026, estimated cost $476K, described as “Interior renovation of an existing apartment, including partition changes as per plans. No change of use, egress or occupancy under this application.”
- Alteration, filed Mar 19, 2026, estimated cost $50K, described as “Removing interior non-bearing partitions, install minor non-load bearing partitions. Change of use to be filed under seperate ALT1 application #121185608. This alt 2 application is limited to interior alterations only.”
- Alteration, filed May 16, 2024, described as “Installation of suspended scaffold for facade work or inspection”
- Alteration, filed Dec 4, 2023, estimated cost $400K, described as “Exterior restoration no change in use egrees or occupancy”
- Alteration, filed Oct 30, 2023, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jan 18, 2023, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 8, 2021, estimated cost $21K, described as “Here with filing 2 Air Handler Unit with each being connected to a air conditioner condenser and steam system for hot water connected to 5 new cast iron radiators in Apt.BD”
- Alteration, filed Sep 7, 2021, estimated cost $71K, described as “Herewith filing application for interior plumbing work in Apt.4BD.”
- Alteration, filed Aug 18, 2021, estimated cost $224K, described as “Herewith filing application for the interior demo and build-out to combine Apts. 4B & 4D and installation of new trash closet in public hallway.”
- Alteration, filed Jun 23, 2021, estimated cost $45K, described as “Herewith filing application for interior demo of Apt.1C.”
- Alteration, filed Feb 15, 2021, estimated cost $127K, described as “Herewith filing application for build-out of Apt.3C with Plumbing and MH filings to be filed separately”
- Alteration, filed Feb 15, 2021, estimated cost $30K, described as “Here with filing 2 air handler/ condenser combo units in Apt.3C.”
- Alteration, filed Jan 13, 2021, estimated cost $484K, described as “Emergency Shoring and Permanent Repairs to Existing Deteriorated Steel Column at East Lot Line Courtyard Northeast corner column. No change in zoning, occupancy, egress or use. Filed in conjunction with Job#123888597.”
- Alteration, filed Jan 11, 2021, estimated cost $50K, described as “Herewith filing for the cap and removal of existing fixtures and installation of new fixturesin apartment 3C. No change in use, egress, or occupancy.”
- Alteration, filed Dec 3, 2020, estimated cost $5K, described as “Proposed installation of pipe scaffold for remedial repairs as per plans. No change in use occupancy or egress under this application.”
- Alteration, filed Jul 31, 2020, estimated cost $15K, described as “Installing (2) New 116 Gallon Hot Water Heaters & (1) 100 Gallon Hot Water Storage Tank to be connected to existing boilers on penthouse lower level.”
- Alteration, filed Jun 17, 2020, estimated cost $20K, described as “Proposed installation of heavy duty sidewalk shed filed for remedial repairs as per plans. No change in use occupancy or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of THE2014…”
- Alteration, filed Dec 11, 2018, estimated cost $8K, described as “Alteration type 3 - construction equipment - scaffold proposed installation of pipe scaffold for remedial repairs as per plans. No change in use occupancy or egress under this application.”
- Alteration, filed Mar 6, 2018, estimated cost $11K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Nov 3, 2017, estimated cost $20K, described as “Proposed installation of pipe scaffold for remedial repairs as per plans. No change in use occupancy or egress under this application.”

## Property taxes

- Assessment: $9,964,674
- 2026–27 Tax: $1,127,321
- Market value (city estimate): $22,143,719
- Taxable value: $9,117,218
- Assessed land: $1,440,000
- Assessed improvements: $8,524,674
- Condo units with their own tax lots: 37

## Zoning

R10A: floor area ratio 9.04 built, 10.00 allowed by base zoning.

## Recent sales

- Oct 23, 2026: $3,875,000, Apt 4B
- Mar 5, 2026: $8,995,000, Apt 9A
- Dec 15, 2022: $3,800,000, Apt 4B
- Mar 7, 2022: $7,750,000, Apt 6A
- Feb 23, 2022: $12,897,176, Unit PH
- Feb 16, 2022: $3,105,078, Apt 3C
- Sep 23, 2021: $9,675,000, Apt 12A
- May 7, 2021: $3,870,000, Apt 8A
- Nov 2, 2020: $413,773, Apt 11D
- Nov 1, 2020: $956,773, Apt 4C

The 10 most recent of 26 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of Riverside-West End Historic District Extension I (Historic District). 27 Landmarks Preservation Commission permits are on file.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
