# 211 West 84th Street, Manhattan

Condominium · 45 units · built 2024 · Block 1232, Lot 7503.

On Umarelli: https://umarelli.org/nyc/1012327503/211-west-84-street

More construction in Upper West Side: https://umarelli.org/nyc/manhattan/upper-west-side.md

## Building permits

- New Building — Mid-Rise, filed May 12, 2022, 45 units, 18 stories, described as “To erect new multi story, multi family mixed use building.”
- Alteration, filed Aug 19, 2026, estimated cost $500K, described as “Renovation of an existing duplex dwelling unit. Architectural work as per plans. Related plumbing work filed under M01460723-I1-LA. No change of use, occupancy or egress.”
- Alteration, filed Aug 14, 2026, estimated cost $639K, described as “Interior renovation of penthouse apartment on 13TH floor. Removal of non-load bearing partitions, erection of new partition walls, finishes, flooring and paint work. All as per plans and applications. No change to use, egress or occupancy.”
- Alteration, filed Jul 20, 2026, estimated cost $40K, described as “Filing herewith tenant fit out (nail salon) as indicated on plans. No change in use egress or occupancy.”
- Alteration, filed Jun 24, 2026, estimated cost $1K, described as “Illuminated non-advertising accessory wall sign - in property lines - pura vida miami. No change of use, egress or occupancy.”
- Alteration, filed Jun 24, 2026, estimated cost $1K, described as “Illuminated non-advertising accessory wall sign - in property lines - pura vida miami. No change of use, egress or occupancy.”
- Alteration, filed Jun 2, 2026, estimated cost $300K, described as “Hereby filing for the interior renovation and tenant fit out of existing demising space. No change to use occupancy or egress.”
- Alteration, filed Mar 20, 2026, estimated cost $150K, described as “Replace the water damaged mechanical-electrcial parts of the existing automated parking system. All mainframe beams to remain. System originally approved & signed off under application #M00728230-I1.”
- Alteration, filed Mar 25, 2025, estimated cost $325K, described as “Proposed new automated parking system in the existing garage.”
- Alteration, filed Aug 20, 2024, estimated cost $10K, described as “Support of excavation for the installation of con edison transformer vault at the sidewalk.”
- Alteration, filed Jun 21, 2023, estimated cost $1K, described as “To erect new construction fence in conjunction with NB application # M00728230-I1. No change in use, occupancy or egress. 355' aligns with the p.l. 205'-9" beyond c.l. 370'-10" outside property line & extending beyond 3' of property line.”
- Alteration, filed May 26, 2023, estimated cost $180, described as “One (1) 12'-0" curb cut, including two (2) 1'-6" splays on each side. North side of west 84TH street, 132.3' east of broadway”

## Property taxes

- Assessment: $21,644,554
- 2026–27 tax: $2,626,297
- Market value (city estimate): $48,098,997
- Taxable value: $21,258,953
- Assessed land: $5,699,702
- Assessed improvements: $15,944,852
- Condo units with their own tax lots: 46

## Zoning

R8B (part of the lot is C4-6A): floor area ratio 7.03 built, above the 4.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Aug 18, 2026: $3,062,250, Apt 5E
- Jul 2, 2026: $14,768,250, Apt 5A
- Jun 30, 2026: $12,600,000, Apt 11W
- Jun 16, 2026: $12,400,000, Apt 10W
- May 27, 2026: $2,497,584, Apt 5F
- May 26, 2026: $13,120,000, Apt 14W
- May 18, 2026: $22,092,035, Unit PHD
- May 11, 2026: $17,000,000, Unit THW, sold with other lots
- May 1, 2026: $28,690,731, Unit PHA
- Apr 14, 2026: $10,812,450, Apt 10E

The 10 most recent of 38 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## In the news

[The Henry Completes Construction at 211 West 84th Street on Manhattan’s Upper West Side](https://newyorkyimby.com/2026/09/the-henry-completes-construction-at-211-west-84th-street-on-manhattans-upper-west-side.html), New York YIMBY, Sep 7, 2026.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
