# 530 Amsterdam Avenue, Manhattan

Co-op · 225 units · built c. 1931 · Block 1233, Lot 33.

On Umarelli: https://umarelli.org/nyc/1012330033/530-amsterdam-avenue

More construction in Upper West Side: https://umarelli.org/nyc/manhattan/upper-west-side.md

Every lot on block 1233: https://umarelli.org/nyc/manhattan/1233.md

## Building permits

- Alteration, filed Aug 11, 2026, estimated cost $300K, described as “Roof replacement, guardrail replacement, and parapet rebuilding as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Jun 5, 2026, estimated cost $155K, described as “Interior renovation of apartment with new and relocated interior partitions and finishes. Combine two apartments into one apartment# 15LM. No change in use, egress or occupancy.”
- Alteration, filed Mar 4, 2025, estimated cost $42K, described as “Removal of non load bearing partition wall, new partition wall for new powder room and laundry, new mechanical vent and new window in apartment 18m”
- Alteration, filed Oct 31, 2024, described as “Installation of suspended scaffolding as per plan and in accordance with Chapter 33 of NYC Building Code. No change in use, egress or occupancy.”
- Alteration, filed Oct 30, 2024, estimated cost $110K, described as “Interior renovation at kitchen and surrounding areas as indicated on drawings submitted herewith. No change in use, egress or occupancy.”
- Alteration, filed Sep 14, 2024, estimated cost $14K, described as “Replacement of plumbing fixtures as part of the interior apartment renovation as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Sep 13, 2024, estimated cost $165K, described as “Interior renovation of apartment including removal and installation of non bearing partitions and related finishes as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Jul 23, 2024, estimated cost $50K, described as “Removal of non load bearing partition closet wall, new partition wall to create large closet, renovate kitchen”
- Alteration, filed Jul 2, 2024, estimated cost $1.0M, described as “Parapet rebuilding and courtyard roof replacement, counterflashing replacement, door sillreplacement, and roof drain replacement as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Feb 13, 2024, estimated cost $1.6M, described as “Parapet rebuilding, door replacement, roof recovery, new roof ventilators, and new guardrail as per plans filed hereiwth. No change to use, egress or occupancy.”
- Alteration, filed Dec 12, 2023, estimated cost $30K, described as “Minor partition wall moderations”
- Alteration, filed Oct 2, 2023, estimated cost $3K, described as “Installation of a temporarily heavy-duty sidewalk rated 600 PSF for material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Aug 7, 2023, estimated cost $123K, described as “Interior renovation work as indicated on the drawings.”
- Alteration, filed Jul 19, 2023, estimated cost $3K, described as “Installation of a temporarily Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jul 18, 2023, estimated cost $3K, described as “Installation of a temporarily heavy-duty sidewalk rated 600 PSF for material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jun 15, 2023, estimated cost $355K, described as “Grade level waterproofing installation and associated column repairs as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed May 4, 2023, estimated cost $185K, described as “Work on apt 12A on the 12th floor only - gut renovate 1 kitchen and three bathrooms. minor partition removal and construction. replace wood floors in portion of apt. no change in use, egress or occupancy”
- Alteration, filed Apr 24, 2023, estimated cost $206K, described as “Alt2 general construction work type to combine units 18DE on 18th floor per TPPN 3/97. Subsequent plumbing app to be filed. All conditions are according to submitted plans. No change in use, egress, or occupancy under this application.”
- Alteration, filed Jan 20, 2023, estimated cost $35K, described as “Installation of (1) new 4.5 ton (59,000 btuh, 1,900 cfm) air cooled split system.”
- Alteration, filed Jan 20, 2023, estimated cost $12K, described as “Renovation of existing apartment ph-f. Minor plumbing work. Removal and installation of non load bearing walls is filled in conjunction with this plumbing application. No change to use, occupancy, or egress.”
- Alteration, filed Jan 20, 2023, estimated cost $128K, described as “Interior apartment renovation of PH-F on the 19th floor. No change to occupancy, use, or egress.”
- Alteration, filed Sep 23, 2022, estimated cost $80K, described as “Excavation and support of excavation for steel repairs and waterproofing at the cellar.”
- Alteration, filed Sep 22, 2022, estimated cost $18K, described as “Plumbing fixture replacement & relocation in conjunction with alt-gc interior renovation of existing 2-bedroom apartment. No change to use, egress, or occupancy.”
- Alteration, filed Sep 22, 2022, estimated cost $120K, described as “Interior renovation of existing 2-bedroom apartment. Replace /relocate partitions, fixtures, finishes, appliances, and lighting. No change to use, egress, or occupancy.”
- Alteration, filed Jul 21, 2022, estimated cost $140K, described as “New alt2 for general construction work to be performed in existing unit 15C on the 15th fl. Subsequent plumbing application to be filed. All in accordance with submitted plans. No changes to use, egress, or occupancy under this application.”

13 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1012330033/530-amsterdam-avenue.

## Building history

- Major Renovation — Conversion, filed Sep 10, 1997, permit issued - entire job/work, 221 units added, 18 stories, described as “Convert storage room at cellar level to exercise room to be used by tenant of building only. Minor partition work and install a/c unit all as per plans.”
- Major Renovation — Conversion, filed May 19, 1997, permit issued - entire job/work, 221 units added, 18 stories, described as “Combine apartments 20A &amp; 20B, remove and relocate non-bearing partition, install new plumbing fixture all as per plan. In addition install new a/c unit.”
- Major Renovation — Conversion, filed May 8, 1996, permit issued - entire job/work, 222 units added, 20 stories, described as “No work under this application. Filing to obtain amended c of o. For apartments 5E &amp; 5I.”
- Major Renovation — Conversion, filed May 31, 1995, permit issued - entire job/work, 224 units added, 17 stories, described as “Combine existing apartments 12E and 12I. Work includes partition changes and some plumbing.”
- Major Renovation — Conversion, filed Jun 30, 1994, signed off Oct 20, 1995, 224 units added, 18 stories, described as “Combine apts 14K &amp; 14L on 12 flr-minor p artition changes remove 1 kitchen and cap plumbing, renovate one k itchen, install two a/c sleeves thru wall no change in use, occupancy or egre ss.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $35,930,700
- 2026–27 Tax: $3,530,209
- Market value (city estimate): $79,846,000
- Taxable value: $33,700,827
- Assessed land: $4,770,000
- Assessed improvements: $31,160,700

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $658,850 credit this tax year.

## Zoning

R10A: floor area ratio 13.81 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Sep 23, 2026: $950,000
- May 12, 2026: $1,630,000
- May 11, 2026: $1,595,000
- Nov 14, 2025: $826,000
- Apr 23, 2025: $1,481,554
- Apr 2, 2025: $1,735,000
- Dec 10, 2024: $800,000
- Sep 25, 2024: $1,950,000
- May 29, 2024: $1,707,000
- May 8, 2024: $1,450,000

The 10 most recent of 67 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- THE BELNORD APTS (City Planning P2001M0042): Completed, decided Dec 15, 2000. 98DCP055M: TO PERMIT TO ALLOW USE GEOUPS 6 AND 10 RETAIL USES IN THE CE LLAR FLOOR LEVE OF THE BUILDING, A PORTION OF WHICH IS LOCAT ED IN R8 AND R10A DISTRICTS WHICH PRECLUDE THESE USES