2461 Broadway, Manhattan
Condominium · 52 units · built 2020 · Block 1239, Lot 7503.
Building permits
- Alteration, filed Dec 2, 2025, estimated cost $100K, described as “Proposed minor interior renovation to existing residential apartments at the 14TH floor of existing mixed use building including demoliton of non bearing partitions. No change to existing use, occupancy, egress or floor area.”
- Alteration, filed May 14, 2025, described as “Window inspection via industrial rope access”
- Alteration, filed Nov 1, 2022, estimated cost $650, described as “Illuminated non-advertising accessory wall sign - inside property line - primary & urgent care for pets. No change of use, egress or occupancy.”
- Alteration, filed Nov 1, 2022, estimated cost $650, described as “Illuminated non-advertising accessory wall sign - inside property line - bondvet. No change of use, egress or occupancy.”
- Alteration, filed Oct 20, 2022, estimated cost $1K, described as “Installation of temporary roof protection as per plans. No change in use, egress or occupancy shall comply with CHAPTER#33 of 2014 the ny building code.”
- Alteration, filed Sep 13, 2022, estimated cost $140K, described as “Interior alterations of existing 1ST floor commercial space to include minor demo, partition and carpentry work. No change to use, occupancy or egress”
- Alteration, filed Aug 12, 2022, estimated cost $59K, described as “Herey filing for the installation of plumbing fixtures and sprinkler in first floor commercial space. No change to use occupancy or egress.”
- Alteration, filed Aug 12, 2022, estimated cost $30K, described as “Herey filing for the installation of mechanical equipment for first floor commercial space. No change to use occupancy or egress.”
- Alteration, filed Aug 8, 2022, estimated cost $75K, described as “Hereby filing interior tenant fit out of commercial space. No change to use occupancy or egress.”
- Alteration, filed Dec 21, 2021, estimated cost $1K, described as “Installation of temporary mobile crane as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 7, 2021, estimated cost $1K, described as “Installation of temporary dry standpipe system as per plans filed herewith. Filed in conjunction with NB#121275707.”
- Alteration, filed Dec 3, 2020, estimated cost $1K, described as “Installation of temporary (16'-79') high pipe scaffold at various levels for facade repair work as per plan. No change in use egress or occupancy,pipe scaffold shall comply with CHAPTER#33 of 2014 the ny building code.”
- Alteration, filed Jul 9, 2020, estimated cost $37K, described as “Installation of heavy duty sidewalk shed during NB construction, filed separately. Sidewalk shed shall comply with CH#33 of the NYC bldg code. No change in use, occupancy or egress under this application. Shed installed on roadway. Dot…”
- Alteration, filed Dec 6, 2019, estimated cost $15K, described as “Installation of plywood fence during new building construction, filed separately. Plywood fence shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Nov 7, 2019, estimated cost $1K, described as “Install Emergency Generator as per plans filed. All gas work filed under NB #121275707. No change to use, egress or occupancy.”
- Alteration, filed Nov 7, 2019, estimated cost $1K, described as “Installation of a combined sprinkler and standpipe system as per plans filed in conjunction with NB #121275707.”
- Alteration, filed Nov 7, 2019, estimated cost $1K, described as “Installation of temporary dry standpipe system as per plans filed herewith.Filed in conjunction with NB#121275707.”
- Alteration, filed Jul 24, 2019, estimated cost $9K, described as “Scaffolding installation in association with full building demolition.”
- Alteration, filed Jun 14, 2019, estimated cost $9K, described as “Scaffold installation in association with full building demolition.”
- Alteration, filed Jun 5, 2019, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed May 7, 2019, estimated cost $7K, described as “Install heavy duty sidewalk shed in order to demolish the building as per plans. No change in use occupancy or egress under this application. Sidewalk shed shall comply with chapter 33 of the 2014 NYC building code.”
- Alteration, filed Apr 24, 2019, estimated cost $2K, described as “Installation of construction fence, to protect site during demolition”
- Alteration, filed Apr 24, 2019, estimated cost $2K, described as “Installation of construction fence, to protect site during demolition”
Property taxes
- Assessment
- $28,974,377
- 2026–27 tax
- $3,019,639
- Market value (city estimate)
- $64,387,502
- Taxable value
- $26,617,028
- Assessed land
- $1,358,101
- Assessed improvements
- $27,616,276
- Condo units with their own tax lots
- 54
Tax breaks
- Co-op and condo abatement, with no end date, a $279,307 credit this tax year.
Zoning
C4-6A: floor area ratio 20.67 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- May 21, 2026: $10,050,000, Apt 15B, sold with other lots
- Apr 21, 2026: $3,707,656, Apt 8B
- Mar 27, 2026: $2,400,000, Apt 10D
- Oct 27, 2025: $5,909,673, Apt 16C
- Sep 16, 2025: $5,100,000, Apt 14A
- Jul 29, 2025: $4,275,000, Apt 17B
- Jun 27, 2025: $4,995,000, Apt 11A
- Jun 18, 2025: $6,817,000, Apt 19A
- Apr 17, 2025: $6,425,000, Apt 16A
- Jan 30, 2025: $4,350,000, Apt 16B
The 10 most recent of 45 open-market sales since 2016, from the Department of Finance’s sales files.
In the news
The Westly Wraps Up Construction at 251 West 91st Street on Manhattan’s Upper West Side, New York YIMBY, Mar 28, 2023.