# 510 5th Avenue, Manhattan

Commercial · built 1954 · Block 1258, Lot 40.

On Umarelli: https://umarelli.org/nyc/1012580040/510-5-avenue

More construction in Midtown West: https://umarelli.org/nyc/manhattan/midtown-west.md

Every lot on block 1258: https://umarelli.org/nyc/manhattan/1258.md

## Building permits

- Alteration, filed May 7, 2026, estimated cost $50K, described as “Interior alterations to include non-load bearing demolition of existing partitions. No change to use, occupancy or egress”
- Alteration, filed Jan 14, 2026, estimated cost $1.0M, described as “Mechanical system work as per the plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Oct 28, 2025, estimated cost $100K, described as “Structural modifications to include provision of new elevator pit. No change to use, occupancy or egress”
- Alteration, filed Sep 17, 2025, estimated cost $20K, described as “Interior alterations to include non-load bearing demo and partition work. No change to use, occupancy or egress”
- Alteration, filed May 14, 2025, estimated cost $1.4M, described as “Interior fit up with new sales fixtures/finishes.”
- No Work, filed Jun 9, 2022, described as “Web3 Gallery for NFT.NYC”
- Alteration, filed May 31, 2022, estimated cost $37K, described as “Interior demolition of non load bearing partitions on the 4th floor as indicated on drawings.”
- Alteration, filed May 25, 2021, estimated cost $3K, described as “Sprinkler work on the 5th floor (Whitebox) as indicated on drawings?”
- Alteration, filed May 25, 2021, estimated cost $220K, described as “Mechanical work to install AC unit on the 5th floor (Whitebox) as indicated on drawings.”
- Alteration, filed May 25, 2021, estimated cost $320K, described as “Construction work on the 5th floor (Whitebox) as indicated on drawings.”
- Alteration, filed Dec 9, 2020, estimated cost $20K, described as “Installation of temporary sprinkler loop on the 5th floor as indicated on drawings. No change to use, egress or occupancy.”
- Alteration, filed Nov 12, 2020, estimated cost $4K, described as “Sprinkler alterations on the 1st floor; related work as per plans.”
- Alteration, filed Nov 12, 2020, estimated cost $89K, described as “Mechanical systems alterations on the 1st floor; related work as per plans.”
- Alteration, filed Oct 13, 2020, estimated cost $15K, described as “Removal of plumbing fixtures on the 5th floor as indicated on drawings. No change to use, egress or occupancy.”
- Alteration, filed Oct 13, 2020, estimated cost $40K, described as “Mechanical demolition on the 5th floor as indicated on drawings. No change to use, egress or occupancy.”

## Building history

- Alteration, filed May 12, 2011, permit issued - entire job/work, described as “Architectural work associated with change of use on the 1ST and 2ND floor and part of the cellar level from bank and office (b, UG6) to retail (m, ug 6 &amp; 10) as indicated on drawings.”
- Alteration, filed Apr 25, 2008, plan exam - approved, described as “General construction in conjunction with change in occupancy at cellar and 1ST floor as shown on plans filed herewith.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $15,420,600
- 2026–27 Tax: $1,639,271
- Market value (city estimate): $34,268,000
- Taxable value: $15,095,970
- Assessed land: $5,940,000
- Assessed improvements: $9,480,600

## Zoning

C5-3: floor area ratio 4.56 built, 15.00 allowed by base zoning.

## Recent sales

- Aug 10, 2023: $50,000,000

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of (Former) Manufactures Trust Company Building: Individual Landmark, Manufacturers Trust Company Building, First and Second Floor Interiors (Interior Landmark). 50 Landmarks Preservation Commission permits are on file.

## Board and land use applications

- MANUFACTURERS TRUST COMPANY (City Planning P2011M0141): Completed, decided May 16, 2011. Landmark site (LP-2467) located at 2 West 43rd and 508 Fifth Avenue
- MANUFACTURERS TRUST/NOW CHASE BANK (City Planning P1998M0101): Completed, decided Mar 3, 1998. LANDMARK-CITY COLLEGE OF NY, REMSEN CEMETERY,TROTTING\*COURSE LA; Additional LPC #(s): 411

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
