45 West 44th Street, Manhattan
Hotel · built 1999 · Block 1260, Lot 14.
Building permits
- Alteration, filed Oct 21, 2025, estimated cost $50K, described as “Filing for interior demo of 4TH floor space related to alt 1 application # M01268316-I1.”
- Alteration, filed Sep 15, 2025, estimated cost $1.6M, described as “Filing for conversion of existing conference rooms and prefunction space on the fourth (4TH) floor to a guest room suite and event space as per plans submitted herewith.”
- Alteration, filed Aug 7, 2025, estimated cost $7K, described as “Modification to existing sprinkler system as per plans. no change in use, egress or occupancy. (existing restaurant renovation)”
- Alteration, filed Jun 5, 2025, estimated cost $89K, described as “Modification to existing plumbing system as per plans. no change in use, egress or occupancy. (existing restaurant renovation)”
- Alteration, filed Jun 5, 2025, estimated cost $51K, described as “Modification to existing HVAC system as per plans. no change in use, egress or occupancy. (existing restaurant renovation) Relocation of some thermostats, removal of couple diffusers plus ductwork and provide new linear diffusers plus…”
- Alteration, filed Jun 3, 2025, estimated cost $1.8M, described as “Removal & installation of interior non-load bearing walls. No change in use, egress or occupancy. (renovation of existing restaurant area) + steel welding work per plans.”
- No Work, filed May 6, 2025
- Alteration, filed Apr 10, 2025, estimated cost $2.0M, described as “Renovation of the cellar level fitness, public restrooms, first floor lobby renovation and reception areas. No change in use, egress or occupancy.”
- Alteration, filed Jan 7, 2025, estimated cost $800K, described as “Modification to existing plumbing fixtures. No change in use, egress or occupancy. (guest room roll out & corridor renovation).”
- Alteration, filed Jan 3, 2025, estimated cost $200K, described as “Furnish and install (5) fan coil units with supply ductwork, piping, supply diffusers, return grilles and thermostats.”
- Alteration, filed Jan 2, 2025, estimated cost $6.8M, described as “Interior alteration and ADA upgrade. Presidential Suite redesign..NO CHANGE in use, egress or occupancy. (Guest Room Roll Out & corridor renovation)”
- Alteration, filed Dec 26, 2024, estimated cost $100K, described as “Modification to existing sprinkler system as per plans. no change in use, egress or occupancy. guest room roll out, presidential suite & corridor renovations.”
- Alteration, filed Mar 1, 2024, described as “IRA to assist with Condition Assessment.”
- Alteration, filed Feb 16, 2024, estimated cost $1K, described as “Installation of sidewalk bridge as per plan. No change in use, egress or occupancy.”
- Alteration, filed Jan 18, 2024, estimated cost $100K, described as “Facade repairs. No change in egress, use or occupancy.”
- Alteration, filed Apr 12, 2023, estimated cost $23K, described as “Modification to existing plumbing fixtures in model room. No change in use, egress or occupancy.”
- Alteration, filed Apr 6, 2023, estimated cost $117K, described as “Removal & installation of interior non-load bearing floors to model rooms on 20TH floor (construction) / 21ST floor (marketing). No change in use, egress or occupancy.”
- Alteration, filed Feb 1, 2022, estimated cost $44K, described as “Herewith filing for replacement of air cooled condensing units on the 30th and 31st floor roofs serving existing EMRs as indicated on plans. No change in use, occupancy, or egress.”
Building history
- New Building — Tower, filed Jul 2, 1997, plan exam - disapproved, 395 units, 27 stories
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $46,773,900
- 2026–27 Tax
- $4,850,248
- Market value (city estimate)
- $103,942,000
- Taxable value
- $44,710,990
- Assessed land
- $10,039,950
- Assessed improvements
- $36,733,950
Zoning
C6-4.5: floor area ratio 18.59 built, above the 12.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.