# 570 5th Avenue, Manhattan

Vacant land · Block 1262, Lot 37.

On Umarelli: https://umarelli.org/nyc/1012620037/7-west-46-street

More construction in Midtown West: https://umarelli.org/nyc/manhattan/midtown-west.md

## Building permits

- New Building — Tower, filed Sep 6, 2024, 20 stories, early work permitted while the building plans are in review, described as “Construction of a new 32 story building.”
- Alteration, filed Oct 9, 2026, estimated cost $50K, described as “Supported Scaffold”
- Alteration, filed Sep 30, 2026, estimated cost $5K, described as “Supported Scaffold Stair Tower”
- Alteration, filed Sep 28, 2026, estimated cost $50K, described as “Install and maintain fence on street.”
- Alteration, filed Nov 17, 2025, estimated cost $5K, described as “Supported Scaffold Stair Tower”
- Alteration, filed Apr 15, 2025, estimated cost $10K, described as “Installation Of Temporary Single Personnel/Material Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Apr 10, 2025, estimated cost $10K, described as “Conversion of entire wet standpipe system to dry pressurized standpipe system on cellar, floors 1-9 prior to full demolition of building filed under separate DOB application and removal of standpipe system by floor during demolition.”
- Alteration, filed Mar 27, 2025, estimated cost $5K, described as “Installation of Temporary Construction Fence on sidewalk and roadway.”
- Alteration, filed Jan 21, 2025, estimated cost $1.0M, described as “Earthwork worktype associated with site clearing and proposed excavation for future develeoment. No chnage in use, egress or occupancy”
- Alteration, filed Dec 19, 2024, estimated cost $10K, described as “Supported Scaffold Stair Tower”
- Alteration, filed Dec 10, 2024, estimated cost $75K, described as “Installation of Temporary Construction Fence on sidewalk.”
- Demolition, filed Sep 17, 2024, estimated cost $750K, described as “Full demolition of 10 story structure, using hand held and mechanical means within, and then full mechanical from grade.”
- Alteration, filed Feb 20, 2024, estimated cost $15K, described as “Installation of work platform as per plans.”
- Alteration, filed Feb 9, 2024, estimated cost $25K, described as “Infill of existing sidewalk vault with flowable fill to provide support for sidewalk as per plans filed. This work is related to full demolition filed under M00869454-I1.”
- Alteration, filed Aug 31, 2023, estimated cost $10K, described as “Installation of 6000 lb single personnel/material hoist car as per plans during construction. Hoist shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 31, 2023, estimated cost $5K, described as “Installation of 300PSF sidewalk shed and pipe scaffolding as per plans. All equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.”
- Alteration, filed Jul 18, 2023, estimated cost $160, described as “Proposed construction fence. No change to use, egress or occupancy under this application.”
- Demolition, filed Jun 12, 2023, estimated cost $35K, described as “Full demolition to an eleven story building”
- Alteration, filed May 15, 2023, estimated cost $10K, described as “Remove the entire sprinkler system prior to Full Demo after all combustible material has been removed and modify existing standpipe system, cut n cap floor by floor as the structure gets lowered”
- Alteration, filed May 12, 2023, estimated cost $25K, described as “Interior demolition to an eleven story building”
- Alteration, filed Sep 1, 2022, estimated cost $5K, described as “Installation of temporary construction plywood fence as per plans during construction. No change in use, egress or occupancy. Fence to comply with chapter 33 of NYC building code of 2014.”
- Alteration, filed Aug 31, 2022, estimated cost $5K, described as “Installation of temporary construction plywood fence as per plans during construction. No change in use, egress or occupancy. Fence to comply with chapter 33 of NYC building code of 2014.”
- Alteration, filed Apr 1, 2022, estimated cost $5K, described as “Installation of 300PSF sidewalk shed, needle beams and pipe scaffolding as per plans. All equipment shall comply with chapter #33 of the 2014 code no change in use, egress or occupancy under this application.”
- Alteration, filed Apr 1, 2022, estimated cost $5K, described as “Installation of 300PSF sidewalk shed, overhead protection and pipe scaffolding as per plans. All equipment shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy under this application.”
- Alteration, filed Mar 16, 2022, estimated cost $9K, described as “Installation of 6000 lb single car personnel/material hoist as per plans during construction. No change in use, egress or occupancy under this application.”

15 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1012620037/7-west-46-street.

## Property taxes

- Assessment: $1,793,250
- 2026–27 tax: $165,799
- Market value (city estimate): $3,985,000
- Taxable value: $1,528,380
- Assessed land: $1,793,250

## Zoning

C5-3 (part of the lot is C6-4.5): floor area ratio 0.00 built, 15.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- 570 Fifth Avenue (Extell) (City Planning 2020M0429): Filed. This is a private application by Extell Development for a zoning text amendment and three zoning special permits pursuant to ZR Sections 66-512, 74-802, and 81-066(c) to undertake transit upgrades including ADA accessibility to the 53rd…

## In the news

[Excavation Continues for KPF-Designed Skyscraper at 570 Fifth Avenue in Midtown, Manhattan](https://newyorkyimby.com/2025/12/excavation-continues-for-kpf-designed-skyscraper-at-570-fifth-avenue-in-midtown-manhattan-2.html), New York YIMBY, Dec 8, 2025.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology