1260 Avenue Of The Americas, Manhattan
Commercial · built c. 1932 · Block 1266, Lot 1.
Building permits
- Alteration, filed Oct 30, 2026, estimated cost $93K, described as “Alterations to plumbing system in suites on 16th floor as per plans. No change to use, egress or occupancy.”
- Alteration, filed Oct 30, 2026, estimated cost $26K, described as “Alterations to sprinkler system in suites on 16th floor as per plans. No change to use, egress or occupancy.”
- Alteration, filed Oct 27, 2026, estimated cost $76K, described as “Minor interior renovations for dental office at unit #1806 on 18TH floor; no change to use, egress or occupancy”
- Alteration, filed Oct 20, 2026, estimated cost $745K, described as “Interior renovations to suites on 16th floor as per plans. No change to use, egress or occupancy.”
- Alteration, filed Oct 12, 2026, estimated cost $40K, described as “Structural work on 2nd floor as per plans. No change to use, egress or occupancy.”
- Alteration, filed Sep 18, 2026, estimated cost $15K, described as “Install of temp scenic scaffold structure, no alt to exist structures for MLB House of Cards. TPA not required. Producer is responsible to monitor site safety & implement HWAP. All prod equipment removed upon event complete.”
- No Work, filed Sep 4, 2026
- Alteration, filed Sep 1, 2026, estimated cost $75K, described as “Removal and installation of interior non-load bearing partition and related finishes as per drawings.”
- Alteration, filed Aug 25, 2026, estimated cost $5.3M, described as “Removal and installation of interior non-load bearing partition and related finishes as per drawings.”
- Alteration, filed Aug 24, 2026, estimated cost $8.4M, described as “Removal and installation of interior non-load bearing partition and related finishes as per drawings filed herewith.”
- Alteration, filed Jul 31, 2026, estimated cost $268K, described as “Demolition and general construction work in suite 2100 as per plans. No change to use, egress or occupancy.”
- Alteration, filed Jul 22, 2026, estimated cost $16K, described as “Installation of grease exhaust wells ventless hood in basement”
- Alteration, filed Jul 22, 2026, estimated cost $20K, described as “Alterations to plumbing system in suite 2100 as per plans. No change to use, egress or occupancy.”
- Alteration, filed Jul 10, 2026, estimated cost $50K, described as “Alterations to sprinkler and standpipe system in suite 2100 as per plans. No change to use, egress or occupancy.”
- Alteration, filed Jul 10, 2026, estimated cost $193K, described as “Alterations to mechanical system on suite 2100 as per plans. No change to use, egress or occupancy.”
- Alteration, filed Jul 6, 2026, described as “IRA to assist with Condition Assessment”
- Alteration, filed Jun 22, 2026, estimated cost $20K, described as “Install of temp retail kiosks, prod equip, no alt to exist struc. for World Cup Telemundo Fan Village. A TPA permit not req. Producer is responsible to monitor site safety & implement HWAP. All prod equip removed upon event completion.”
- Alteration, filed Jun 10, 2026, estimated cost $90K, described as “Renovate office space on the 22nd floor. No change to use, egress or occupancy.”
- No Work, filed May 20, 2026, described as “A tented Red Carpet event for Tony Award nominated guests to interact with press prior to broadcast. A private event for invited guests only.”
- Alteration, filed May 19, 2026, estimated cost $150K, described as “Alterations to mechanical system in suite 1900 as per plans. No change to use, egress or occupancy.”
- Alteration, filed May 18, 2026, estimated cost $325K, described as “Demolition and general construction in suite 1900 as per plans. No change to use, egress or occupancy.”
- Alteration, filed May 18, 2026, described as “IRA to assist with Condition Assessment”
- Alteration, filed May 18, 2026, estimated cost $32K, described as “Alterations to sprinkler system in suite 1900 as per plans. No change to use, egress or occupancy.”
- Alteration, filed May 18, 2026, estimated cost $33K, described as “Alterations to plumbing system in suite 1900 as per plans. No change to use, egress or occupancy.”
- Alteration, filed May 12, 2026, described as “IRA to assist with Condition Assessment”
472 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $478,125,000
- 2026–27 tax
- $51,867,000
- Market value (city estimate)
- $1,062,500,000
- Taxable value
- $478,125,000
- Assessed land
- $111,149,100
- Assessed improvements
- $366,975,900
Zoning
C5-2.5 (part of the lot is C5-3): floor area ratio 14.80 built, above the 12.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Landmarks
Part of Rockefeller Center: Individual Landmark, International Building (Rockefeller Center) (Interior Landmark). 50 Landmarks Preservation Commission permits are on file.
Board and land use applications
- Change to an earlier grant (Board of Standards and Appeals 33-99-BZIII): Change to an earlier grant, Granted, filed Nov 26, 2019, decided Jul 13, 2020. Extension of Term of a previously approved Special Permit (§73-36) which permitted the operation of a physical cultural establishment (Equinox Fitness) which expired on January 11, 2020. C5-2.5 and C5-3 Midtown Special Purpose district.…
- Change to an earlier grant (Board of Standards and Appeals 33-99-BZII): Change to an earlier grant, Granted, filed Jun 14, 2010, decided Oct 26, 2010. Extension of Term of a Special Permit (§73-36) for the continued operation of a Physical Culture Establishment (The Sports Club/LA) which expired on January 11, 2010; waiver of the rules. C5-3(MID) zoning district.
- Variance or special permit (Board of Standards and Appeals 33-99-BZ): Variance or special permit, Granted, filed Feb 17, 1999, decided Jan 11, 2000. Special Permit (§73-36) to permit the use of a portion of an existing thirty four story office building as a physical culture establishment.
- ROCKEFELLER CENTER OBSERVATION ROOF (City Planning P2005M0227): Completed, decided Jun 28, 2005. 05DCP058M: TO ALLOW TO INSTALL ILLUMINATED SIGN KIOSKS WITHIN ROCKEFELL ER CTR
- ROCKEFELLER CENTER TUNNEL (City Planning P1988M0673): Completed, decided Feb 21, 1991. CONSENT TO RENEW THE REVOCABLE CONSENT FOR THE TUNNEL
- INTERNATIONAL BLDG INTERIOR (City Planning P1985M0897): Completed, decided Jul 18, 1985. LANDMARK-CITY COLLEGE OF NY, REMSEN CEMETERY,TROTTING*COURSE LA; Additional LPC #(s): 303
In the news
Gabellini Sheppard Associates Reveals Next Phase of Renovations At 45 Rockefeller Plaza In Midtown, Manhattan, New York YIMBY, Jun 22, 2020.