4 West 58th Street, Manhattan
Commercial · built 1948 · Block 1273, Lot 44.
Building permits
- Alteration, filed Jun 2, 2026, estimated cost $10K, described as “Installation of pipe scaffold at 4 west 58 street manhattan ny 10019 as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Apr 27, 2026, estimated cost $679K, described as “Work includes per the filed plans remove/replace cracked/spalled masonry units, masonry repointing, remove/replace steel lintels, scrape/paint existing lintels/columns/dunnage beams, remove/replace brick masonry, replacement of insulation…”
- Alteration, filed Apr 23, 2026, described as “Suspended scaffold outrigger system for exterior facade repair work at 4 west 58TH street, manhattan, ny 10019”
- Alteration, filed Nov 5, 2025, estimated cost $6K, described as “Installation of temporary illuminated sign over existing marquee for premier of tv show. No change in use, occupancy, or egress”
- Alteration, filed Aug 8, 2025, estimated cost $1K, described as “Application filed to obtain certificate of compliance (eup) for ch-1-1N thru ch-1-5N at sub-cellar level..”
- Alteration, filed Jul 25, 2025, estimated cost $5K, described as “Install temp. Inflatable/equip. On marquee at the paris theater located at 4 west 58TH street, ny, ny 10019. Producer to monitor weather conditions & implement appropriate action. No alteration to exist. Structure(s).”
- Alteration, filed Mar 1, 2024, estimated cost $5K, described as “Filing for install of temp modular tent for event on 3/7/24 as per plans.”
- Alteration, filed Nov 29, 2022, estimated cost $4K, described as “Installation of temporary illuminated sign over existing marquee for premier of tv show. No change in use, occupancy, or egress”
- Alteration, filed Jul 12, 2022, estimated cost $5K, described as “Filing for installation for temporary modular tent as per plans submitted herewith.”
- Alteration, filed Aug 18, 2021, estimated cost $27K, described as “New steel support for wheelchair lift as per plans filed herewith. No change in use, occupancy or egress.”
- Alteration, filed Apr 5, 2021, estimated cost $20K, described as “Application filed for additions/modifications to plumbing in the basement as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Mar 5, 2021, estimated cost $5K, described as “Repair and replace existing "paris" accessory business sign on existing marquee. No change in use, egress or occupancy.”
- Alteration, filed Dec 3, 2020, estimated cost $1K, described as “Connect water lines to electric steam boiler as per plans. No change in use, egress or occupancy.”
- Alteration, filed Dec 3, 2020, estimated cost $20K, described as “Install new steam and condensate piping, steam pressing fixtures and components as per plans. No change in use, egress or occupancy.”
- Alteration, filed Dec 3, 2020, estimated cost $15K, described as “Install electric steam boiler as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 25, 2020, estimated cost $130K, described as “Application filed for mechanical work on the 12TH floor as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Sep 25, 2020, estimated cost $94K, described as “Application filed for plumbing and sprinkler modifications/additions on the 12TH floor as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Sep 18, 2020, estimated cost $65K, described as “Modification to existing Sprinkler systems, existing standpipe system, and existing Plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.”
- Alteration, filed Sep 15, 2020, estimated cost $270K, described as “Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.”
- No Work, filed Sep 1, 2020
- Alteration, filed Jul 7, 2020, estimated cost $90K, described as “Modify duct distribution on the cellar and the first floor. Provide vav boxes with thermostats. Provide air curtain for 1ST floor”
- Alteration, filed Jul 1, 2020, estimated cost $383K, described as “Install new fresh air intake unit, associated ducts and piping; thermostats/temperature sensors; refrigerant piping; drains; fire dampers on 9th floor”
- Alteration, filed Jun 29, 2020, estimated cost $127K, described as “Modification of Sprinkler system with addition of 52 sprinkler for the new Medical office on 9th Floor, Old system to be removed once the new system is installed and inspected. No change in use or egress under this application.”
- Alteration, filed Jun 29, 2020, estimated cost $255K, described as “Remove and/or relocate existing risers on 8th & 9th floor as per drawing, install new risers, plumbing lines for hot and cold water, sanitation, waste, and discharge and vents on 8th & 9th floor”
- Alteration, filed Feb 6, 2020, estimated cost $550K, described as “Modify HVAC ductwork and related piping as show on drawings filed herewith. No change in use, egress or occupancy.”
12 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $31,400,550
- 2026–27 tax
- $2,603,660
- Market value (city estimate)
- $69,779,000
- Taxable value
- $24,001,290
- Assessed land
- $3,150,000
- Assessed improvements
- $28,250,550
Zoning
C5-3 (part of the lot is C5-2.5): floor area ratio 9.35 built, 15.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- 9 West 57th Street (City Planning 2023M0155): Certification, Completed, filed Oct 25, 2023, decided Apr 30, 2024. This is a private application for two Chair certifications to facilitate design changes in a plaza pursuant to Section 37-625 and remove non-bonused arcade pursuant to Section 37-621 from a POPS at 9 West 57th Street located in Midtown…