# 41 West 58th Street, Manhattan

Apartment Building · 316 units · built 1948 · Block 1274, Lot 6.

On Umarelli: https://umarelli.org/nyc/1012740006/41-west-58-street

More construction in Midtown West: https://umarelli.org/nyc/manhattan/midtown-west.md

Every lot on block 1274: https://umarelli.org/nyc/manhattan/1274.md

## Building permits

- Alteration, filed May 11, 2026, described as “Facade inspections”
- Alteration, filed Dec 9, 2025, estimated cost $285K, described as “Renovation of existing restaurant, limited to new millwork, fixtures and finishes. No change in use egress or occupancy.”
- Alteration, filed May 30, 2024, described as “Installation of suspended scaffold for facade work, Amend #1, added scaffold drops and outrigger details.”
- Alteration, filed Mar 14, 2024, described as “Installation of suspended scaffold for facade work”
- Alteration, filed Jan 18, 2024, estimated cost $28K, described as “Proposing 2 aditional restrom as per plan submetted, no chenge in use egress or occupancy.”
- Alteration, filed Oct 4, 2023, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 15, 2023, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
- Alteration, filed Aug 22, 2023, estimated cost $2.4M, described as “Facade repairs to include masonry, pointing, lintels, sills, concert patching, stucco, scrape, prime paint exposed steel, and partial parapet replacement.”
- Alteration, filed Oct 28, 2022, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 15, 2020, estimated cost $71K, described as “Plumbing work on the cellar and 1st floor (Gabriel's Bar & Restaurant) as indicated on drawings.”
- Alteration, filed Oct 15, 2020, estimated cost $28K, described as “Sprinkler work on the 1st floor (Gabriel's Bar & Restaurant) as indicated on drawings.”
- Alteration, filed Oct 15, 2020, estimated cost $100K, described as “Mechanical changes on the 1st floor (Gabriel's Bar & Restaurant) as indicated on drawings”
- Alteration, filed Aug 3, 2020, estimated cost $30K, described as “Plumbing changes on the 16th floor (Apartment 16G) as indicated on drawings.”
- Alteration, filed Dec 16, 2019, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 21, 2019, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300PSF.”
- Alteration, filed Jul 26, 2019, estimated cost $15K, described as “Plumbing work on the 2nd floor (suite 2C) as indicated on drawings”

## Building history

- Alteration, filed Oct 16, 2014, plan exam - disapproved
- Alteration, filed Dec 18, 2013, plan exam - disapproved, described as “Proposed transfer of development rights requiring BSA approval.”
- Alteration, filed May 5, 1998, plan exam - approved, described as “Conversion of an existing storage room into a tenant gym.”
- Alteration, filed Jan 21, 1998, signed off Nov 27, 2013, units 131 to 130
- Major Renovation — Conversion, filed Sep 18, 1997, signed off Sep 9, 1998, 38 units added, 11 stories, described as “Change in use to an Eating and Drinking establishment and all work done under a separate application.”
- Major Renovation — Conversion, filed Feb 7, 1997, plan exam - disapproved, 38 units added, 38 stories, described as “Change of use on part of the 1ST floor to establish and automobile sale showroom(use group 9).no work performed under this application.”
- Major Renovation — Conversion, filed Apr 2, 1996, signed off Sep 27, 1996, 132 units added, 22 stories, described as “Appl. Being filed to amend c/o to increa se number of occupants on 1ST all work done under appl. On 1ST fl. All work done under appl.#101260680.”
- Major Renovation — Conversion, filed May 13, 1994, signed off Sep 27, 1996, 132 units added, described as “Alter partition &amp; plumbing for bathrms &amp; kitchens in penthouse #1 &amp; #2 also an addition to penthouse on the 21 flr, which is less than 1 percent of fl area ratio. There is no change in use eg ress.”
- Major Renovation — Conversion, filed Dec 27, 1991, signed off Sep 16, 1992, 114 units added, 22 stories, described as “Alter partitions &amp; plumbing at 14TH floor construction(15TH floor rental) to create an additional apt. No change in room count.also change in nomenclature for penthouse&amp;penthouse #1 &amp; #2 to apt.(a) &amp; (b).&amp; tower duplexs.”
- Major Renovation — Conversion, filed Sep 12, 1990, signed off Aug 19, 1991, 38 units added, 11 stories, described as “Combine two existing apartments at 8 flr into one apt. Interior partitio changes and new finishes as shown on plans filed herewith.”

The 10 most recent of 11 new buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $40,297,950
- 2026–27 Tax: $4,458,902
- Market value (city estimate): $89,551,000
- Taxable value: $35,841,780
- Assessed land: $9,489,150
- Assessed improvements: $30,808,800

## Zoning

R10H (part of the lot is C5-1): floor area ratio 10.52 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Change to an Earlier Grant (Board of Standards and Appeals 960-67-BZ): Change to an Earlier Grant, Granted, filed Mar 21, 2014, decided Apr 8, 2014. Amendment of two previously approved variances (§72-21) to allow the merger of the zoning lots and the transfer of development rights from 36 to 40 Central Park South. R10-H zoning district.
- Change to an Earlier Grant (Board of Standards and Appeals 116-68-BZIII): Change to an Earlier Grant, Granted, filed Dec 26, 2013, decided Apr 8, 2014. Amendment of two previously approved variances (§72-21) to allow the merger of the zoning lots and the transfer of development rights from 36 to 40 Central Park South. R10-H zoning district.
- Change to an Earlier Grant (Board of Standards and Appeals 116-68-BZII): Change to an Earlier Grant, Granted, filed Dec 19, 2003, decided Jun 8, 2004. To permit an extension of the time to obtain a Certificate of Occupancy for an additional two (2) years from the date of this resolution to expire on June 8, 2006
- Change to an Earlier Grant (Board of Standards and Appeals 116-68-BZ): Change to an Earlier Grant, Granted, filed Nov 17, 1998, decided Dec 21, 2000. AMENDMENT: Amendment to permit the enlargement of an existing non-conforming eating and drinking establishent (Use Group 6.
- ATLAS (City Planning P2001M0570): Completed, decided Mar 23, 2001. RENEWAL-UNENCLOSED SIDEWALK CAFE FOR 5-YEARS WITH 20 SEATS
- MICKEY MANTLES RESTAURANT (City Planning P2001M0518): Completed, decided Feb 16, 2001. RENEWAL-UNENCLOSED SIDEWALK CAFE FOR 5-YEARS WITH 12 SEATS
- 40 FEAST (City Planning P2001M0460): Completed, decided Aug 4, 2000. NEW-UNENCLOSED SIDEWALK CAFE WITH 20 SEATS
- SIDEWALK CAFE TEXT (City Planning P2000M0284): Completed, decided Aug 2, 2000. 00DCP060M: ZONING TEXT AMENDMENTS TO ZR SECTIONS 14-00 AND 22-00, RELAT ING TO SIDEWALK CAFES TO PERMIT UNENCLOSED CAFES ON CENTRAL PARK SOUTH BETWEEN 5TH AND 6TH AVENUE IN AN R10H DISTRICT
- 40 CENTRAL PARK SOUTH (City Planning P1999M0645): Completed, decided Jul 18, 2000. NEW-UNENCLOSED SIDEWALK CAFE
- MICKEY MANTLE'S (City Planning P2000M0613): Completed, decided Jun 15, 2000. RENEWAL-UNENCLOSED SIDEWALK CAFE FOR 1-YEAR, WITH 12 SEATS

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
