# 50 Central Park South, Manhattan

Condominium · 12 units · built c. 1931 · Block 1274, Lot 7503.

On Umarelli: https://umarelli.org/nyc/1012747503/50-central-park-south

More construction in Midtown West: https://umarelli.org/nyc/manhattan/midtown-west.md

Every lot on block 1274: https://umarelli.org/nyc/manhattan/1274.md

## Building permits

- Alteration, filed Apr 11, 2024, described as “Installation of temporary pipe scaffold as per plan. No change in use,egress or occupancy.”
- Alteration, filed Apr 1, 2024, described as “Installation of suspended scaffold during facade inspection/repair and Hoist.”
- Alteration, filed Jun 20, 2023, estimated cost $282K, described as “Facade repair”
- Alteration, filed Jan 18, 2023, estimated cost $1K, described as “Installation of sidewalk shed in accordance with nycc chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Dec 14, 2022, estimated cost $1.1M, described as “Minor renovation to an existing lobby, including partition changes. Replacement of front door. No change of use, egress or occupancy under this application.”
- Alteration, filed Dec 13, 2022, estimated cost $24K, described as “Mechanical work as per plans. No change of use, egress or occupancy under this application.”
- Alteration, filed Jun 22, 2022, estimated cost $51K, described as “Replacement of motor inside cooling tower on the rooftop. No change to egress, use, or occupancy.”
- Alteration, filed Jun 7, 2021, estimated cost $85K, described as “Propose to replace 2 HVAC units located on east & west towers at existing hotel. No change in use, occupancy or means of egress.”

## Building history

- Alteration, filed Nov 15, 2016, plan exam - approved, units 259 to 222, described as “Change of use on 2ND floor, removal and disposal of interior partitions, new partitions, floors, doors, wall finishes, and installation of fixtures as shown on drawings filed herewith.”
- Major Renovation — Hotel, filed Jul 8, 1999, permit issued - entire job/work, 300 hotel rooms added, 35 stories, described as “Interior renovation of ext'g. Hotel. Re- route exit stair at 2ND floor. Expand restaurant and bar use on 1ST. Replace finishes within ext'g. Hotel rooms. Remove portion of 2ND floor to create two (2) story lobby infill portion of floor…”
- Alteration, filed Aug 20, 1997, permit issued - entire job/work, described as “Renovate existing hotel and convert floors 23-33 to apartments. Obtain new c of o.”
- Alteration, filed Sep 12, 1995, permit issued - entire job/work, described as “Divide existing restaurant into a restaurant &amp; a store, remove requirement of p.a.obtain and amended c. Of o. For the 1ST floor.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $92,862,347
- 2026–27 Tax: $9,484,001
- Market value (city estimate): $206,360,776
- Taxable value: $85,677,818
- Assessed land: $10,888,649
- Assessed improvements: $81,973,698
- Condo units with their own tax lots: 14

## Zoning

R10H (part of the lot is C5-1): floor area ratio 26.91 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Feb 5, 2026: $183,566,575, Unit HOTEL
- Feb 5, 2026: $86,133,425, Unit COMM
- Nov 25, 2025: $28,380,000, Apt 28
- Jun 17, 2024: $14,980,000, Apt 24B
- Dec 22, 2023: $27,900,000, Apt 23
- Mar 12, 2021: $18,600,000, Apt 27
- Sep 7, 2017: $25,000,000, Apt 33
- Nov 2, 2016: $20,500,000, Apt 24B

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- ST. MORITZ HOTEL (City Planning P1999M0607): Completed, decided Mar 31, 1999. NEW-UNENCLOSED SIDEWALK CAFE WITH 72 SEATS
- ST. MORITZ HOTEL/CAFE DE LA PAIX (City Planning P1994M0567): Completed, decided Sep 20, 1993. RENEWAL FOR UNENCLOSED FOR 5 YEARS WITH 72 SEATS; Additional Other #(s): N920424UCM
- FAI SM MNAGEMENT, INC (City Planning P1992M0582): Completed, decided May 12, 1992. NEW-UNENCLOSED SIDEWALK CARE (CHANGE IN OWNERSHIP), 72 SEATS
- HOTEL ST. MORITZ (City Planning P1991M0605): Completed, decided Oct 16, 1990. RENEWAL-UNENCLOSED SIDEWALK CAFE WITH 72 SEATS FOR 5-YEARS
- HOTEL ST. MORITZ (City Planning P1989M1146): Completed, decided Jun 7, 1989. NEW-UNENCLOSED SIDEWALK CAFE WITH 72 SEATS
- CAFE DE LA PAIX (City Planning P1986M1250): Completed, decided Apr 29, 1987. RENEWAL-UNENCLOSED SIDEWALK CAFE
- CAFE DELA PAIX (City Planning P1982M1298): Completed, decided Dec 16, 1982. CONSENT FOR AN UNENCLOSED SIDEWALK CAFE

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
