# 12 East 41st Street, Manhattan

Commercial · built c. 1926 · Block 1275, Lot 64.

On Umarelli: https://umarelli.org/nyc/1012750064/12-east-41-street

More construction in Midtown: https://umarelli.org/nyc/manhattan/midtown.md

Every lot on block 1275: https://umarelli.org/nyc/manhattan/1275.md

## Building permits

- Alteration, filed May 5, 2023, estimated cost $2K, described as “Remove two toilets and two lavatories per plan. Extisting bathroom to be used for storage.”
- Alteration, filed Apr 21, 2022, estimated cost $50K, described as “Application hereby filed to repair building facade, nachage in use egress or occupancy.”
- Alteration, filed Dec 28, 2021, described as “Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Aug 19, 2021, estimated cost $56K, described as “Replacement of packaged unit on the 12TH floor mer with 3 units on the 12TH floor mer and rooftop with a total capacity of 16 tons. No change to egress, use,or occupancy.”
- Alteration, filed Jul 8, 2020, estimated cost $45K, described as “Modifications to existing sprinkler system per plans.”
- Alteration, filed May 21, 2020, estimated cost $200K, described as “Installation mechanical ductwork and a/c units”
- Alteration, filed Apr 8, 2020, estimated cost $45K, described as “Installation of mechanical ductwork and a/c units”
- Alteration, filed Feb 19, 2020, estimated cost $256K, described as “Install two new eight ton DX air conditioning systems. Install one new approx. four ton DX refrigeration system for retail market at first floor level. Obtain Equipment Use Permits. Removal of existing water towers to be filed separately…”
- Alteration, filed Jan 2, 2020, estimated cost $11K, described as “Remove one restroom. Install two sinks, one lavatory and two floor drains.”

## Building history

- Alteration, filed May 16, 2006, permit issued - entire job/work, described as “Filing for interior renovation and change in occupancy on floors cel,mez, 1 thru 4,6, 7 thru 9 and 15 as shown on plans filed herewtih”
- Alteration, filed May 17, 1991, signed off Jun 3, 1993, described as “No work to be done.at clr,1ST fl&amp;1ST mez estab.retail &amp; svce estabshmnt at cellar include office use.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $13,618,800
- 2026–27 Tax: $1,477,367
- Market value (city estimate): $30,264,000
- Taxable value: $13,618,800
- Assessed land: $2,308,500
- Assessed improvements: $11,310,300

## Zoning

C5-2.5: floor area ratio 13.16 built, above the 12.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Greater East Midtown - Special Subdistrict (City Planning P2016M0316): Completed, decided Aug 15, 2017. This is an application by NYC Department of City Planning requesting a text amendment to establish the East Midtown Subdistrict and extend the Special Midtown District, and to rezone a half-block area from C5-2 to C5-3 to reinforce the…

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
