# 335 Madison Avenue, Manhattan

Commercial · built c. 1914 · Block 1278, Lot 20.

On Umarelli: https://umarelli.org/nyc/1012780020/335-madison-avenue

More construction in Midtown: https://umarelli.org/nyc/manhattan/midtown.md

Every lot on block 1278: https://umarelli.org/nyc/manhattan/1278.md

## Building permits

- No Work, filed Nov 12, 2026, described as “Cocktail parties for business-related promotional events in the existing retail space, south, 2nd floor. Requesting another TPACO from November 30, 2026 thru February 27, 2027. From 8 AM to 11:59 PM”
- No Work, filed Aug 18, 2026, described as “Cocktail parties for business-related promotional events in the existing retail space, south, 2nd floor. Requesting another TPACO from August 31, 2026 - November 29, 2026. From 8 AM to 11:59 PM”
- Alteration, filed Jun 18, 2026, estimated cost $11K, described as “Install of new Steel framing for new signage above bank entrance on Madison Ave. No Change to occupancy, use, or egress.”
- No Work, filed May 21, 2026, described as “Cocktail parties for business-related promotional events in the existing retail space, south, 2nd floor. Requesting another TPACO from June 4, 2026- August 29, 2026. From 8 am to 11:59 pm”
- No Work, filed Apr 30, 2026, described as “Cocktail parties for business-related promotional events in the existing retail space, south, 2nd floor. Requesting another TPACO from May 18, 2026 - July 30, 2026. From 8 am to 11:59 pm”
- No Work, filed Feb 3, 2026, described as “Cocktail parties for business-related promotional events in the existing retail space, south, 2nd floor. Requesting another TPACO from Feb 17, 2026 - May 17, 2026. From 8 am to 11:59 pm”
- No Work, filed Dec 12, 2025, described as “Cocktail parties for business-related promotional events in the existing retail space, south, 2nd floor. Requesting another TPACO from Jan 7, 2026 - Feb 16, 2026. From 8 am to 11:59 pm”
- No Work, filed Dec 9, 2025
- No Work, filed Dec 2, 2025
- Alteration, filed Nov 24, 2025, estimated cost $10K, described as “Heavy duty sidewalk shed during renovation of existing exterior terrace, filed separately under application #M01127340. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Oct 2, 2025, estimated cost $65K, described as “Interior renovation of building lobby as shown on drawings filed herewith. No change to occupancy, use, or egress.”
- Alteration, filed Oct 1, 2025, estimated cost $1K, described as “Installation of engineered enclosure system with protective netting as per plans to comply with BC3309.17. No change in egress, use, or occupancy.”
- Alteration, filed Sep 29, 2025, estimated cost $3.2M, described as “Interior fit out of office space as shown on drawings filed herewith. No change to occupancy, use, or egress.”
- Alteration, filed Sep 24, 2025, estimated cost $1K, described as “Installation of steel pipe scaffolding as per plans. No change in egress, use, or occupancy.”
- No Work, filed Sep 16, 2025, described as “Cocktail parties for business related promotional events in existing retail space south, 2nd floor.”
- Alteration, filed Sep 12, 2025, estimated cost $215K, described as “Demo and Construction of interior non-bearing walls, ceiling, doors, and finishes as shown on the drawings filed herewith. There will be no change to occupancy, use, or egress.”
- Alteration, filed Sep 9, 2025, estimated cost $9K, described as “Installation of Fire Sprinkler System as shown on drawings filed herewith. No change in occcpancy, use or egress.”
- No Work, filed Aug 28, 2025
- No Work, filed Aug 28, 2025
- Alteration, filed Jul 29, 2025, estimated cost $1K, described as “Installation of plywood enclosure on 9TH floor terrace as per plans. No change in egress, use, or occupancy.”
- Alteration, filed Jul 18, 2025, estimated cost $114K, described as “The scope of work includes construction to change the use for a portion of this 3RD floor from business to place of assembly as shown on drawings filed herewith. No change to the bulk of the building.”
- Alteration, filed Jul 15, 2025, estimated cost $227K, described as “The scope of work includes construction to change the use for a portion of this floor from business to place of assembly as shown on drawings filed herewith. No change to the bulk of the building”
- Alteration, filed Jun 27, 2025, estimated cost $16K, described as “Installation of temporary sprinkler loop at 003 and 004 floor, all as per plan. No change in egress, use or occupancy under this application.”
- No Work, filed Jun 17, 2025, described as “Cocktail Parties for business related promotional events in existing retail space south, 2nd floor”
- Alteration, filed May 30, 2025, estimated cost $956K, described as “Demo and Construction of interior non-bearing walls, ceiling, and finishes as shown on the drawings filed herewith. There will be no change to occupancy, use, or egress.”

88 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1012780020/335-madison-avenue.

## Property taxes

- Assessment: $153,229,950
- 2026–27 tax: $15,188,098
- Market value (city estimate): $340,511,000
- Taxable value: $140,008,278
- Assessed land: $23,895,000
- Assessed improvements: $129,334,950

## Zoning

C5-3: floor area ratio 20.20 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Feb 28, 2020: $33,072,265, 874,744 sq ft ($38 per sq ft)

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Change to an earlier grant (Board of Standards and Appeals 134-11-BZII): Change to an earlier grant, Withdrawn, filed Oct 21, 2016, decided May 10, 2017. Extension of Time to Complete Construction of a previously approved Special Permit (ZR §73-36) to allow the operation of a physical culture establishment (Spa Castle) which expired on January 20, 2016; Amendment to permit the change in…
- Variance or special permit (Board of Standards and Appeals 134-11-BZ): Variance or special permit, Granted, filed Sep 7, 2011, decided Jan 10, 2012. Special Permit (ZR §73-36) to allow the operation of a physical culture establishment (Spa Castle). C5-3 zoning district.
- Change to an earlier grant (Board of Standards and Appeals 977-86-BZ): Change to an earlier grant, Granted, filed Feb 25, 1998, decided Jun 16, 1998. Request for a waiver of the Rules of Procedure and reopening for an extension of term of the special permit which expired April 28, 1997.
- Greater East Midtown - Special Subdistrict (City Planning P2016M0316): Completed, decided Aug 15, 2017. This is an application by NYC Department of City Planning requesting a text amendment to establish the East Midtown Subdistrict and extend the Special Midtown District, and to rezone a half-block area from C5-2 to C5-3 to reinforce the…

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
