Building permits
- Alteration, filed Sep 16, 2026, estimated cost $110K, described as “General Construction modifications taking place on the 11th floor-Suite 1133 as shown on drawings submitted herewith. No change in use, egress or occupancy”
- Alteration, filed Mar 31, 2025, estimated cost $73K, described as “Minor partition removal with installation of new partitions, doors, suspended ceilings, lighting, and finishes on 9TH floor suite 909 as per plans. No change to use, egress or occupancy.”
- Alteration, filed Mar 14, 2025, estimated cost $20K, described as “Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the (9th Fl- 909/910 Division) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Mar 4, 2025, estimated cost $10K, described as “Installation of temp scenic truss and LED Display, no alt to exist structures for H&M Spring Windows. Producer is responsible to monitor site safety. All production equipment removed upon event completion”
- Alteration, filed Feb 7, 2025, estimated cost $60K, described as “Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the (15th Floor- Suite 1501 Division) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Nov 20, 2024, estimated cost $25K, described as “#1307: minor interior renovation with new partition, lighting and finishes. No change to use, egress or occupancy.”
- Alteration, filed Oct 7, 2024, estimated cost $10K, described as “Install plumbing fixture, no change of use, egress and occupancy”
- Alteration, filed Oct 2, 2024, estimated cost $13K, described as “Interior renovation of room 1307B on 13th floor, work includes remove existing partition and install new sink. no change in use, egress and occupancy.”
- Alteration, filed Aug 27, 2024, estimated cost $5K, described as “Installation of temp scenic partitions and display platform, no alt to exist structures for Seasonal H&M 5th Ave. Producer is responsible to monitor site safety. All production equipment removed upon event completion”
- Alteration, filed May 29, 2024, estimated cost $12K, described as “Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the (13th Floor- Architectural Demolition) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Feb 27, 2024, estimated cost $8K, described as “Installation of new sink as per submitted plans. No Change to Use, Occupancy Group, or Egress.”
- Alteration, filed Dec 27, 2023, estimated cost $10K, described as “Renovation of suite 1302. No change to use, occupancy or egress.”
- Alteration, filed Nov 20, 2023, estimated cost $40K, described as “Interior renovations to electrical room. No change to use, occupancy or egress.”
- Alteration, filed Nov 2, 2022, estimated cost $5K, described as “Installation of 300PSF sidewalk shed and pipe scaffolding as per plans. All equipment shall comply with chapter # 33 of the NYC code 2014, no changes in use egress or occupancy under this application.”
- Alteration, filed Oct 24, 2022, estimated cost $393K, described as “Modification of the roof per plans filed herewith”
- Alteration, filed Oct 21, 2022, estimated cost $35K, described as “Modification of facade per plans filed herewith”
- Alteration, filed Oct 17, 2022, estimated cost $450K, described as “Modification of Facade per plans filed herewith”
- Alteration, filed Oct 17, 2022, estimated cost $14K, described as “Modification of roof per plans filed herewith”
- Alteration, filed Oct 17, 2022, estimated cost $760K, described as “Modification of roof per plans filed herewith”
- Alteration, filed Oct 12, 2022, estimated cost $410K, described as “Modification of roof per plans filed herewith”
- Alteration, filed Oct 7, 2022, estimated cost $10K, described as “Installation of mechanical units for ventilation of polishing room in commercial office 1008 on the 10th floor. No change in occupancy use or egress.”
- Alteration, filed Oct 6, 2022, estimated cost $13K, described as “Removal of Existing glass partition and installation of fire rated wall and door and 6"x6" opening in exterior wall in commercial office 1008 on the 10th floor. No change in occupancy use or egress.”
- Alteration, filed Jun 28, 2022, estimated cost $9K, described as “Relocated 13 sprinkler heads to be connected to existing sprinkler riser and providing new plumbing fixtures and piping for a renovated 9TH floor office space, in conjunction with (gc/mh) #M00731661-I1”
- Alteration, filed Jun 28, 2022, estimated cost $70K, described as “New partitions, hung ceiling, doors, lights, and new ac ducts/diffuser for existing ac unit at 9TH floor. No change to use egress or occupancy.”
- Alteration, filed Sep 8, 2021, estimated cost $535K, described as “Architectural modifications of office space on 6th, 7th, and 9th floors as shown on plans filed herewith. No change in egress, occupancy, or use.”
6 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $62,860,050
- 2026–27 tax
- $6,659,405
- Market value (city estimate)
- $139,689,000
- Taxable value
- $61,388,320
- Assessed land
- $10,035,000
- Assessed improvements
- $52,825,050
Zoning
C5-3: floor area ratio 13.80 built, 15.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.