# 7 East 48th Street, Manhattan

Commercial · built 1984 · Block 1284, Lot 7.

On Umarelli: https://umarelli.org/nyc/1012840007/7-east-48-street

More construction in Midtown: https://umarelli.org/nyc/manhattan/midtown.md

Every lot on block 1284: https://umarelli.org/nyc/manhattan/1284.md

## Building permits

- Alteration, filed Oct 16, 2026, estimated cost $10K, described as “Alt co filed to establish Public assembly on 3, establish acessory kitchen on 23 CONSTRUCTION 24 MARKETING and update business population on both floors.”
- Alteration, filed Sep 4, 2026, estimated cost $6.9M, described as “General construction modifications taking place on the 23-24 Construction/ 24-25 Marketing floors as per plans filed herewith. No change in use, egress or occupancy”
- Alteration, filed Sep 4, 2026, estimated cost $4.0M, described as “General construction taking place on the 3rd floor as per plans filed herewith. No change in use, egress or occupancy”
- Alteration, filed Aug 27, 2026, estimated cost $37K, described as “Sprinkler work on the 28th floor construction (29th floor marketing) as indicated on drawings.”
- Alteration, filed Aug 27, 2026, estimated cost $39K, described as “Plumbing work on the 28th floor construction (29th floor marketing) as indicated on drawings.”
- Alteration, filed Aug 27, 2026, estimated cost $120K, described as “Mechanical work on the 28th floor construction (29th floor marketing) as indicated on drawings.”
- Alteration, filed Aug 27, 2026, estimated cost $653K, described as “Construction work on the 28th floor construction (29th floor marketing) as indicated on drawings.”
- Alteration, filed Jul 14, 2026, estimated cost $90K, described as “Construction work on the 33rd floor construction (34th floor marketing) (Centennial) as indicated on drawings.”
- Alteration, filed May 20, 2026, estimated cost $271K, described as “Interior renovation of existing commercial office space on 43RD floor as per plans filed herewith. No exterior work. No change in egress, use or occupancy.”
- Alteration, filed May 19, 2026, estimated cost $295K, described as “Construction work on the 41st floor construction (42nd floor marketing) as indicated on drawings.”
- Alteration, filed May 12, 2026, estimated cost $20K, described as “Sprinkler work on the 41st floor construction (42nd floor marketing) as indicated on drawings.”
- Alteration, filed May 12, 2026, estimated cost $18K, described as “Plumbing work on the 41st floor construction (42nd floor marketing) as indicated on drawings.”
- Alteration, filed May 12, 2026, estimated cost $40K, described as “Mechanical work on the 41st floor construction (42nd floor marketing) as indicated on drawings.”
- Alteration, filed Apr 23, 2026, estimated cost $6K, described as “Sprinkler work on the 31st floor construction (32nd floor marketing) core bathrooms as indicated on drawings.”
- Alteration, filed Apr 23, 2026, estimated cost $60K, described as “Plumbing work on the 31st floor construction (32nd floor marketing) core bathrooms as indicated on drawings.”
- Alteration, filed Apr 23, 2026, estimated cost $23K, described as “Mechanical work on the 31st floor construction (32nd floor marketing) core bathrooms as indicated on drawings.”
- Alteration, filed Apr 23, 2026, estimated cost $6K, described as “Sprinkler work on the 24th floor construction (25th floor marketing) core bathrooms as indicated on drawings.”
- Alteration, filed Apr 23, 2026, estimated cost $65K, described as “Plumbing work on the 24th floor construction (25th floor marketing) core bathrooms as indicated on drawings.”
- Alteration, filed Apr 23, 2026, estimated cost $23K, described as “Mechanical work on the 24th floor construction (25th floor marketing) core bathrooms as indicated on drawings.”
- Alteration, filed Apr 21, 2026, estimated cost $245K, described as “Construction work on the 31st floor construction (32nd floor marketing) core bathrooms as indicated on drawings.”
- Alteration, filed Apr 21, 2026, estimated cost $256K, described as “Construction work on the 24th floor construction (25th floor marketing) core bathrooms as indicated on drawings.”
- Alteration, filed Jan 30, 2026, estimated cost $70K, described as “Structural changes for slab infill on the 24th floor construction (25th floor marketing) as indicated on drawings.”
- Alteration, filed Jan 15, 2026, estimated cost $30K, described as “Sprinkler demolition on the 3rd floor, 23rd floor construction (24th floor marketing) 24th floor construction (25th floor marketing) as indicated on drawings.”
- Alteration, filed Jan 15, 2026, estimated cost $23K, described as “Removal of plumbing fixtures on the 3rd floor, 23rd floor construction (24th floor marketing), 24th floor construction (25th floor marketing) as indicated on drawings.”
- Alteration, filed Jan 15, 2026, estimated cost $25K, described as “Interior mechanical demolition on the 3rd floor, 23rd floor construction (24th floor marketing) and 24th floor construction (25th floor marketing) as indicated on drawings.”

91 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1012840007/7-east-48-street.

## Building history

- Alteration, filed Nov 16, 2018, permit issued - entire job/work, described as “Application filed to increase occupant load of existing office building. Minor construction work associated with the ADA bathrooms as it relates to office usage of space with increased occupant load.”
- Alteration, filed Jul 18, 2017, permit issued - entire job/work, described as “Architectural renovation and change in population to floors 2ND through 11TH and 15TH through 20TH floor (wework) as indicated on drawings.”
- Alteration, filed Dec 17, 1999, signed off Sep 25, 2002, described as “Change of Occupancy on the 44th floor (45th floor tenant) from Dining (F4) and Kitchen (D2) to offices (E). No work to be performed under this applocation. All work filed under 102678769.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $106,338,600
- 2026–27 Tax: $11,097,068
- Market value (city estimate): $236,308,000
- Taxable value: $102,295,980
- Assessed land: $19,710,000
- Assessed improvements: $86,628,600

## Zoning

C5-2.5: floor area ratio 26.25 built, above the 12.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Tower 49 Cafe Cert (City Planning 2019M0067): Certification, Completed, filed Nov 30, 2018, decided Dec 1, 2021. This is a private application by Kato International LLC requesting a certification under 37-73(c) to facilitate an open air cafe at 7 e. 49th Street in Midtown, Manhattan CD 5.
- Greater East Midtown - Special Subdistrict (City Planning P2016M0316): Completed, decided Aug 15, 2017. This is an application by NYC Department of City Planning requesting a text amendment to establish the East Midtown Subdistrict and extend the Special Midtown District, and to rezone a half-block area from C5-2 to C5-3 to reinforce the…
- Tower 49 café certification (12 E. 49th St.) (City Planning P2014M0525): Completed, decided Dec 21, 2015. Chair certification for an open air café to be placed within a public plaza pursuant to 37-73(c) located at 12 E. 49th Street, CD 5, Manhattan.
- TOWER 49 KIOSK (City Planning P2011M0160): Completed, decided Jul 28, 2011. CERT. TO PERMIT AN OPEN AIR CAFE FOR THREE YEAR TERM WITHIN\*A PLAZA IN THE MIDTOWN DISTRICT (POPS)
- TOWER 49 PLAZA & CAFE (City Planning P2003M0395): Completed, decided Mar 19, 2004. 84-134M: REDUCTION IN AN URBAN PLAZA WITH CORRESPONDING REDUCTION IN EXISTING OFFICE BUILDING
- TOWER 49 PLAZA & CAFE (City Planning P2001M0385): Completed, decided Apr 28, 2003. 2ND MOD OF THE SPECIAL PERMIT TO ALLOW THE INSTALLATION OF A\*44-SEAT OPEN AIR CAFE WITH 12 TABLES, A PLANTER & 30 MOVABLE\*CHAIRS & 6 MOVABLE TABLES WITHIN THE EXISTING URBAN PLAZA\*WITHIN THE SPECIAL MIDTOWN DISTRICT (POPS)
- 360 MADISON AVE, 11-17 E48TH ST & GRAND CENTRAL TE (City Planning P2000M0253): Completed, decided Aug 1, 2000. CERT FOR THE TRANSFER OF DEVELOPMENT RIGHTS FROM THE\*TERMINAL TO 360 MADISON & 11-17 E48 ST WITHIN THE GRAND\*CENTRAL SUBDISTRICT OF THE SPECIAL MIDTOWN DIST TO BUILD\*A NEW 24-STORY BLDG WITH APPROX 287,000SF OF FLOOR AREA
- TOWER 49 (City Planning P1990M0705): Completed, decided Sep 11, 1990. 1ST MODIF FOR PERMANENT INSTALLATION OF 5 GRANITE BENCHES\*WITH APPROVAL FOR A 6TH LOCATION ON AN EXISTING NO.-FACING\*URBAN PLAZA, PLUS AN AS-OF-RIGHT 76,770 SQ FT FLR AREA BONUS\*FLOOR FOR AN URBAN OPEN SPACE PURSUANT TO ZR12-10 (POPS)
- 5 E 48TH ST (City Planning P1984M0813): Completed, decided Oct 25, 1984. 84-134M: REDUCTION IN AN URBAN PLAZA WITH CORRESPONDING REDUCTION IN EXISTING OFFICE BUILDING
- TOWER 49 PLAZA (City Planning P1982M0343): Completed, decided Mar 30, 1982. URBAN OPEN SPACE CERTIF FOR AN ARCADE & AN URBAN PLAZA\*(POPS); Additional Other #(s): 940904

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
