390 Park Avenue, Manhattan
Commercial · built 1952 · Block 1289, Lot 36.
Building permits
- Alteration, filed Jun 4, 2026, estimated cost $231K, described as “The scope of work includes two new stairs including openings in the existingstructure.”
- Alteration, filed Jun 3, 2026, estimated cost $8.2M, described as “Removal and installation of non load bearing partitions as per plans filed herewith.”
- Alteration, filed Jun 3, 2026, estimated cost $860K, described as “Modification to existing sprinkler and plumbing fixtures as per plans filed herewith.”
- Alteration, filed Jun 3, 2026, estimated cost $1.9M, described as “Modification to existing HVAC systems as per plans filed herewith.”
- Alteration, filed Mar 26, 2026, estimated cost $1.1M, described as “Modifications to the existing HVAC system on the 17th Floor (Industrious), as per plans. No change to use, egress, or occupancy.”
- Alteration, filed Mar 24, 2026, estimated cost $226K, described as “Modifications and additions to the existing plumbing fixtures and piping on the 17th Floor (Industrious), as per plans. No change to use, egress, or occupancy,”
- Alteration, filed Mar 24, 2026, estimated cost $103K, described as “Modifications to the existing sprinkler system on the 17th Floor (Industrious), as per plans. No change to use, egress, or occupancy.”
- Alteration, filed Mar 24, 2026, estimated cost $4.0M, described as “Interior renovation of existing office space with the installation of ceilings, floors, partitions, and finishes on the 17th Floor (Industrious), as per plans. No change to use, egress, or occupancy.”
- Alteration, filed Dec 2, 2025, estimated cost $882K, described as “Interior modifications to the existing office space including minor demolition, installation of non-load bearing partitions and related finishes. No change in use, egress or occupancy.”
- Alteration, filed Sep 24, 2025, estimated cost $13.4M, described as “Interior minor demolition, new communicating stair, partitions, casework, doors, power, ceiling, lighting & finishes for new office tenant. No change in use, egress or occupancy.”
- Alteration, filed Jul 23, 2025, estimated cost $33K, described as “Interior modifications to the existing office space including demo and installation of non-load bearing partitions and reflected finishes as per plans filed herewith. No change in egress, occupancy or use.”
- Alteration, filed Apr 10, 2025, estimated cost $1.9M, described as “Interior modifications to the existing office space including demo and installation of non-load bearing partitions and reflected finishes as per plans filed herewith. No change in egress, occupancy or use.”
- Alteration, filed Feb 25, 2025, estimated cost $539K, described as “Interior slab demo and framing for new stair openings. No change in use, egress or occupancy.”
- Alteration, filed Jan 31, 2025, estimated cost $1.3M, described as “General Construction as shown on plans.”
- Alteration, filed Mar 15, 2024, estimated cost $1.5M, described as “General construction work to include interior renovation as shown on plans for new tenant”
- Alteration, filed Feb 12, 2024, estimated cost $1.7M, described as “General construction work as shown on plans”
- Alteration, filed Nov 21, 2023, estimated cost $242K, described as “Structural work to include garage ramp repairs as shown on plans.”
- Alteration, filed Nov 21, 2023, estimated cost $700K, described as “Modification to existing HVAC system as per plans filed.”
- Alteration, filed Nov 21, 2023, estimated cost $1.1M, described as “Installation of non load bearing partitions as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 21, 2023, estimated cost $82K, described as “Modification to existing sprinkler system and installation of plumbing fixtures.”
- No Work, filed Oct 16, 2023, described as “Cocktail reception for Lever Club opening. For invited guests only, with food and beverage served.”
- Alteration, filed Sep 14, 2023, estimated cost $379K, described as “Installation of non load bearing partitions as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 13, 2023, estimated cost $290K, described as “Mechanical filing as per plans. No change use, egress or occupancy.”
- Alteration, filed Sep 13, 2023, estimated cost $6K, described as “Sprinkler filing as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 25, 2023, estimated cost $4.9M, described as “General construction work as shown on plans”
36 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $99,693,450
- 2026–27 tax
- $7,510,905
- Market value (city estimate)
- $221,541,000
- Taxable value
- $99,693,450
- Assessed land
- $13,635,000
- Assessed improvements
- $86,058,450
Tax breaks
- ICAP abatement, through Jun 30, 2034, a $3,303,840 credit this tax year.
Zoning
C5-3 (part of the lot is C5-2.5): floor area ratio 7.55 built, 15.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Landmarks
Part of Lever House (Individual Landmark). 50 Landmarks Preservation Commission permits are on file.
Board and land use applications
- Greater East Midtown - Special Subdistrict (City Planning P2016M0316): Completed, decided Aug 15, 2017. This is an application by NYC Department of City Planning requesting a text amendment to establish the East Midtown Subdistrict and extend the Special Midtown District, and to rezone a half-block area from C5-2 to C5-3 to reinforce the…
- LEVER HOUSE (City Planning P1983M0316): Completed, decided Mar 18, 1983. LANDMARK-CITY COLLEGE OF NY, REMSEN CEMETERY,TROTTING*COURSE LA; Additional LPC #(s): 318
In the news
Lever House Completes $100 Million Renovation At 390 Park Avenue In Midtown East, Manhattan, New York YIMBY, Nov 19, 2023.