# 151 East 58th Street, Manhattan

Condominium · 105 units · built 2001 · Block 1313, Lot 7501.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/1013137501/151-east-58-street

More construction in Midtown: https://umarelli.org/nyc/manhattan/midtown.md

Every lot on block 1313: https://umarelli.org/nyc/manhattan/1313.md

## Building permits

- Alteration, filed Sep 28, 2026, estimated cost $324K, described as “Interior renovation for Capital One Bank. No change to use, egress or occupancy.”
- No Work, filed Sep 8, 2026
- No Work, filed Jul 30, 2026, described as “TPA Event”
- Alteration, filed Jul 16, 2026, estimated cost $1K, described as “Non-illuminated non-advertising accessory sign on existing entrance canopy - visual comfort & co. No change of use, egress or occupancy.”
- Alteration, filed Jul 7, 2026, estimated cost $1K, described as “Filing herewith for a temp structure as per plans.”
- No Work, filed Jun 25, 2026, described as “Tpa event”
- Alteration, filed Apr 24, 2026, estimated cost $95K, described as “Interior demolition of non load bearing partitions on the cellar (LL1), mezzanine and 1st floor (former Home Depot) as indicated on drawings.”
- Alteration, filed Apr 16, 2026, estimated cost $35K, described as “Sprinkler work on the 1st floor (Visual Comfort) as indicated on drawings.”
- Alteration, filed Apr 16, 2026, estimated cost $50K, described as “Plumbing work on the 1st floor (Visual Comfort) as indicated on drawings.”
- Alteration, filed Apr 16, 2026, estimated cost $140K, described as “Mechanical work on the 1st floor (Visual Comfort) as indicated on drawings”
- Alteration, filed Apr 14, 2026, estimated cost $95K, described as “Structural work on the 1st floor (Visual Comfort) as indicated on drawings.”
- Alteration, filed Apr 14, 2026, estimated cost $870K, described as “Architectural changes on the 1st floor (Visual Comfort) as indicated on drawings.”
- Alteration, filed Mar 23, 2026, estimated cost $131K, described as “Tenant fitout for an interior renovation of retail space on the 1ST floor, proposing new partitions, lighting fixtures, new awning and glazing replacment at storefront. On change in use, egress, or occupancy.”
- Alteration, filed Mar 18, 2026, estimated cost $1K, described as “Installation of temporary plywood fence as per plan. No change in use, egress or occupancy.”
- Alteration, filed Mar 17, 2026, estimated cost $14K, described as “Removal of sprinkler heads and installation of temporary sprinkler loop on the 1st floor as indicated on drawings.”
- Alteration, filed Mar 17, 2026, estimated cost $3K, described as “Removal of plumbing fixtures and capping of piping on the 1st floor as indicated on drawings.”
- Alteration, filed Mar 17, 2026, estimated cost $11K, described as “Removal of ductwork and associated equipment on the 1st floor as indicated on drawings.”
- Alteration, filed Mar 13, 2026, estimated cost $204K, described as “Interior demolition of non load bearing partitions on the 1st floor and modification of existing storefront as indicated on drawings.”
- Alteration, filed Feb 3, 2026, estimated cost $75K, described as “Demolition of existing ductwork and installation of new ductwork, vav boxes, air terminals, and thermostats. No change in use, egress, or occupancy.”
- Alteration, filed Dec 10, 2025, estimated cost $47K, described as “Addition of a sump pump in new elevator pit and Modification to existing sprinkler system as per plans.”
- Alteration, filed Dec 9, 2025, estimated cost $180K, described as “Relocation of ductwork and air terminals, removal of twofan boxes and associated duckwork: installation of newfan powered box and associated ductwork.”
- Alteration, filed Dec 2, 2025, estimated cost $166K, described as “Local remove of existing slab to form LULA elevator pit slab and sump pit slab. Slab opening for LULA elevator. Installation of structural steel frame to support proposed LULA elevator rails.”
- Alteration, filed Nov 30, 2025, estimated cost $70K, described as “Installation of new LULA elevator from floor 6 to the 7. Installation of pit into the ceiling of Floor 5.”
- Alteration, filed Nov 12, 2025, estimated cost $135K, described as “3 rd, 4TH and 6TH floors interior renovation for installation of new power distribution units (pdu). No change in use, egress or occupancy.”
- No Work, filed Aug 1, 2025, described as “TPA Filing”

105 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1013137501/151-east-58-street.

## Building history

- New Building — High-Rise, filed Sep 7, 1999, permit issued - entire job/work, 105 units, 54 stories

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $550,618,203
- Market value (city estimate): $1,223,595,995
- Taxable value: $490,866,096
- Assessed land: $72,000,000
- Assessed improvements: $478,618,203
- Condo units with their own tax lots: 109

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $159,440 credit this tax year.

## Zoning

C5-2: floor area ratio 13.08 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Dec 23, 2025: $12,000,000, Apt 38B, sold with other lots
- Dec 11, 2025: $3,200,000, Apt 42C
- Sep 17, 2025: $5,750,000, Apt 45C
- Aug 21, 2025: $16,500,000, Apt PH55W
- Mar 10, 2025: $14,700,000, Apt PH54W
- Mar 7, 2023: $4,000,000, Apt 35D
- Nov 30, 2022: $3,277,982, Apt 38B, sold with other lots
- Oct 12, 2022: $5,380,000, Apt 34D
- Apr 14, 2022: $33,000,000, Apt PH51W, sold with other lots
- Feb 18, 2022: $14,400,000, Apt PH53W

The 10 most recent of 27 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
