222 East 41st Street, Manhattan
Community Facility Condominium · built 2001 · Block 1314, Lot 7503.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- Alteration, filed Oct 14, 2026, estimated cost $31K, described as “Herewith filing modifications to existing sprinkler system as per plans. No change in use egress or occupancy.”
- Alteration, filed Nov 15, 2024, described as “Installation and use of suspended scaffold.”
- Alteration, filed Mar 26, 2021, estimated cost $15K, described as “Installation of temporary trolley beam system as per drawings. Temporary trolley beam shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Jan 17, 2020, estimated cost $629K, described as “Removal and installation of fire protection equipment on the 8TH, 18TH, 19TH, 20TH, 21ST & 23RD floors. No change to use, egress and occupancy.”
- Alteration, filed Jan 17, 2020, estimated cost $2.2M, described as “Removal and installation of fixtures, piping and equipment. No change in use, egress and occupancy.”
- Alteration, filed Jan 17, 2020, estimated cost $3.9M, described as “Removal and installation of mechanical equipment. No change to use, egress and occupancy.”
- Alteration, filed Mar 6, 2019, estimated cost $32K, described as “Installation of system scaffold as per drawings. System scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Jan 15, 2019, estimated cost $2K, described as “Erect non-illuminated accessory business channel letter wall sign on the existing marquee, no change to use, egress or occupation”
- Alteration, filed Apr 9, 2018, estimated cost $32K, described as “Installation of scaffolding / trolley beam system as per drawings. Scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Mar 14, 2018, estimated cost $29K, described as “Installation of system scaffold as per drawings. Scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Mar 7, 2018, estimated cost $68K, described as “Installation of plywood fence, as per drawings. Plywood fence shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
Property taxes
- Assessment
- $114,844,493
- Assessed land
- $13,500,000
- Assessed improvements
- $101,344,493
Tax breaks
- Nonprofit exemption (hospital), with no end date, about $12,458,331 a year below the full tax.
Zoning
C5-3: floor area ratio 14.17 built, 15.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.