# 655 3rd Avenue, Manhattan

Commercial · built 1958 · Block 1315, Lot 1.

On Umarelli: https://umarelli.org/nyc/1013150001/655-3-avenue

More construction in Midtown East: https://umarelli.org/nyc/manhattan/midtown-east.md

Every lot on block 1315: https://umarelli.org/nyc/manhattan/1315.md

## Building permits

- Alteration, filed Nov 16, 2026, estimated cost $224K, described as “Mechanical work for Nutter McClennan on 25th marketing floor (24th construction)”
- Alteration, filed Nov 13, 2026, estimated cost $761K, described as “General construction work for Nutter McClennan on 25th marketing floor (24th construction)”
- Alteration, filed Nov 11, 2026, estimated cost $37K, described as “Plumbing work for Nutter McClennan on 25th marketing floor (24th construction)”
- Alteration, filed Nov 11, 2026, estimated cost $28K, described as “Sprinkler work for Nutter McClennan on 25th marketing floor (24th construction)”
- Alteration, filed Nov 3, 2026, estimated cost $210K, described as “Mechanical work for installation of Optional Standby Generator”
- Alteration, filed Nov 3, 2026, estimated cost $400K, described as “Minor int & ext demo; installation of new int ceilings, doors & new ext wall modifications for the installation of an optional standby generator (by others) within the existing loading berth. Filing associated with conditionally approved…”
- Alteration, filed Nov 3, 2026, estimated cost $150K, described as “Provide structural support for new optional standby generator at existing loading dock. Structural support for louver system”
- Alteration, filed Nov 2, 2026, estimated cost $15K, described as “Sprinkler work for installation of Optional Standby Generator on cellar & 1st floor. Minor sprinkler work on construction floor 29 (marketing floor 30)”
- Alteration, filed Nov 2, 2026, estimated cost $5K, described as “Fuel oil storage associated with installation of Optional Standby Generator”
- Alteration, filed Jun 26, 2026, estimated cost $10K, described as “Remove and replace existing water source heat pump with a like for like unit. Replace existing steam coil with a steam coil of similar capacity . Provide new duct connection to new wshp and reconnect to existing duct work.”
- Alteration, filed May 29, 2026, estimated cost $36K, described as “Plumbing work on marketing floor 20 (construction floor 19)”
- Alteration, filed May 29, 2026, estimated cost $29K, described as “Sprinkler work on marketing floor 20 (construction floor 19)”
- Alteration, filed May 29, 2026, estimated cost $160K, described as “Mechanical work on marketing floor 20 (construction floor 19)”
- Alteration, filed May 29, 2026, estimated cost $400K, described as “General construction work on marketing floor 20 (construction floor 19)”
- Alteration, filed Mar 23, 2026, described as “Installation of industrial rope access for facade inspections.”
- Alteration, filed Nov 7, 2025, estimated cost $1K, described as “Erect non illuminated non advertising sign on wall.- 5 Grand Central East- No change of use, egress or occupancy”
- Alteration, filed Feb 26, 2025, estimated cost $388K, described as “General construction for office fit out for Republic of Cyprus on construction floor 16 (marketing floor 17)”
- Alteration, filed Feb 24, 2025, estimated cost $9K, described as “Sprinkler work for office fit out for Republic of Cyprus on construction floor 16 (marketing floor 17)”
- Alteration, filed Feb 24, 2025, estimated cost $131K, described as “Mechanical work for office fit out for Republic of Cyprus on construction floor 16 (marketing floor 17)”
- Alteration, filed Feb 7, 2025, estimated cost $15K, described as “Filing herewith modification of existing sprinkler system and installation of tcsp as per plans. No change in use, egress, or occupancy.”
- Alteration, filed Feb 5, 2025, estimated cost $60K, described as “Filing herewith interior removals work for existing office space as per plans. No change in use, egress, or occupancy.”
- Alteration, filed Jan 15, 2025, estimated cost $80K, described as “General construction for PMO relocation on construction floor subcellar (marketing C2 level)”
- Alteration, filed Jan 15, 2025, estimated cost $25K, described as “Plumbing work for PMO on construction floor subcellar (marketing C2 level)”
- Alteration, filed Jan 15, 2025, estimated cost $5K, described as “Sprinkler work for PMO on construction floor subcellar (marketing C2 level)”
- Alteration, filed Jan 15, 2025, estimated cost $20K, described as “Mechanical work for PMO on construction floor subcellar (marketing C2 level)”

62 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1013150001/655-3-avenue.

## Property taxes

- Assessment: $55,862,100
- 2026–27 Tax: $5,900,117
- Market value (city estimate): $124,138,000
- Taxable value: $54,388,980
- Assessed land: $12,825,000
- Assessed improvements: $43,037,100

## Zoning

C5-3: floor area ratio 20.01 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
