815 2nd Avenue, Manhattan
Commercial · built 1963 · Block 1317, Lot 21.
Building permits
- Alteration, filed Oct 14, 2025, estimated cost $950, described as “Install exterior non-illuminated d/f banner sign (kennedy international school)”
- Alteration, filed Aug 15, 2025, estimated cost $950, described as “Install exterior non-illuminated d/f banner sign (kennedy international school)”
- Alteration, filed Mar 24, 2025, estimated cost $175K, described as “Filing for fire-rated partitions to create an accessory science lab accessory for the proposed educational occupancy for a school.”
- Alteration, filed Jan 15, 2025, estimated cost $450K, described as “Additions/modification of new partitions, doors, suspended ceilings and finishes on the 3rd floor (Lyceum Kennedy International School) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Jan 14, 2025, estimated cost $60K, described as “Modifications to the existing sprinkler system on the 3rd floor (Kennedy School) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Jan 14, 2025, estimated cost $90K, described as “Installation of new plumbing fixtures with associated piping on the 3rd floor. New sanitary piping to be installed on the 2nd floor (Kennedy School) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Jan 14, 2025, estimated cost $300K, described as “Modifications to the existing HVAC system on the 3rd floor (Kennedy School) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Mar 1, 2024, estimated cost $53K, described as “Architectural alteration at entrance arcade with new topping slab. No change to use, egress, or occupancy.”
- Alteration, filed Apr 6, 2023, estimated cost $7K, described as “Replace existing ac with a new 3-ton water-cooled heat pump on 8TH floor. Existing unit to be de-decommissioned and remove. There is no change of use, egress or occupancy filded under this application”
- Alteration, filed Mar 25, 2022, estimated cost $74K, described as “Redistribution of existing sprinkler system and addition of new sprinkler heads on floors indicated as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Feb 18, 2020, estimated cost $48K, described as “Installation of unit as per plans filed herewith.”
- Alteration, filed Feb 18, 2020, estimated cost $36K, described as “Installation of Sprinkler heads as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Oct 28, 2019, estimated cost $125, described as “Installation of non-illuminated blade sign on wall (midtown hardware true value).”
- Alteration, filed Jan 16, 2018, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300PSF.”
Property taxes
- Assessment
- $23,990,400
- 2026–27 Tax
- $475,663
- Market value (city estimate)
- $53,312,000
- Taxable value
- $4,384,802
- Assessed land
- $5,085,000
- Assessed improvements
- $18,905,400
Tax breaks
- Nonprofit exemption (house of worship), with no end date, about $1,902,653 a year below the full tax.
Zoning
C1-9: floor area ratio 13.08 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.