211 East 46th Street, Manhattan
Condominium · 261 units · built 1979 · Block 1320, Lot 7506.
Building permits
- Alteration, filed Aug 27, 2026, estimated cost $20K, described as “Install 2 doors in existing openings office space.”
- Alteration, filed Jun 4, 2026, estimated cost $72K, described as “Repair work of garage entrance ramp at street level”
- Alteration, filed Mar 11, 2026, estimated cost $40K, described as “Interior renovation of existing builing 6TH floor with generalconstruction as per plan filed herewith. No change of use, egress or certificate of occupancy.”
- Alteration, filed Feb 13, 2026, estimated cost $2K, described as “Replace non-illuminated accessory business aluminum letter sign on the existing main entrance building structure, no change in use, egress, or occupancy.”
- Alteration, filed Oct 17, 2024, estimated cost $2K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 11, 2024, estimated cost $159K, described as “Filing application for the replacement of roof exhaust fans. No change in use, egress, or occupancy.”
- Alteration, filed Sep 25, 2024, estimated cost $7K, described as “Installation of a temporary overhead and roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application”
- Alteration, filed Apr 11, 2024, estimated cost $2K, described as “Installation of a temporarily Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Apr 10, 2024, estimated cost $400K, described as “Proposed garage repairs as per plans filed herewith. There is no change in use, egress or occupancy.”
- Alteration, filed Oct 26, 2023, estimated cost $362K, described as “Filing for facade repairs as per plans filed herewith. No change in use, occupancy or egress.”
- Alteration, filed May 2, 2023, estimated cost $20K, described as “Installation oftemporary shoring as per plans filed herewith. There is no change in use, egress or occupancy.”
- Alteration, filed May 16, 2022, estimated cost $10K, described as “Renovation of apartment 14D to include new partitions and doors,and new ventilation fan. As per plans herewith submitted. No change in use, egress or occupancy.”
- Alteration, filed Mar 31, 2022, estimated cost $8K, described as “Installation of temporary sidewalk shed as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Feb 15, 2022, estimated cost $25K, described as “Combination of 2 condo units 28h and 28j in to 1 . all finishes as per plans shown. ot to be filed under seperate application M00647653-I1.”
- Alteration, filed Feb 15, 2022, estimated cost $102K, described as “Combination of 2 condo units 28h and 28j on the 28th floor into one Apartment asper TPPN 3-97.all finishes as per plans shown. plumbing to be filed under separate. all finishes as per plans shown. plumbing to be filed under separate…”
- Alteration, filed Mar 1, 2021, estimated cost $21K, described as “Application filed for plumbing work type for interior renovation of apt. 7C, in conjunction with job #M00477875.”
- Alteration, filed Mar 1, 2021, estimated cost $29K, described as “Interior renovation of apt. 7C with new partition walls, replace flooring, kitchen cabinet and plumbing fixtures. No change the use, egress or occupancy.”
- No Work, filed Dec 18, 2019
- No Work, filed Sep 10, 2019, described as “The lebanese american university would like to utilize the space for a series of lectures which will require a temporary place of assembly. There will be 1 fire guard, certified by the FDNY fire dept. That will be provided for the event.”
- No Work, filed Sep 10, 2019, described as “The lebanese american university would like to utilize the space for a series of lectures which will require a temporary place of assembly. There will be 1 fire guard, certified by the FDNY fire dept. That will be provided for the event.”
- Alteration, filed Aug 21, 2019, estimated cost $25K, described as “Herewith filing new alt 2 application for general construction in existing unit on 33RD floor.fixtures to be replaced in existing locations on new rough-ins. Replace existing gas range on existing pipes and valve.”
- Alteration, filed Apr 19, 2018, described as “Installation of heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.”
Building history
- Alteration, filed Aug 14, 2019, permit issued - entire job/work, described as “Amend c of o at 1ST floor from store u.g. 6 (c of O#79551) to assembly eating and drinking establishment u.g. 6. Construction filed under alt-2 application 123165109. Obtain new c of o.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $36,963,929
- 2026–27 Tax
- $3,514,148
- Market value (city estimate)
- $82,142,105
- Taxable value
- $31,115,931
- Assessed land
- $9,675,916
- Assessed improvements
- $27,288,013
- Condo units with their own tax lots
- 265
Tax breaks
- Nonprofit exemption (college or university), with no end date, about $318,562 a year below the full tax.
- Co-op and Condo Abatement, with no end date, a $282,185 credit this tax year.
Zoning
C5-3 (part of the lot is R10): floor area ratio 13.75 built, 15.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Oct 6, 2026: $730,000, Apt 28D
- Sep 28, 2026: $770,000, Apt 19A
- Sep 28, 2026: $810,000, Apt 32C
- Aug 1, 2026: $154,050, Apt 11B
- Jul 31, 2026: $383,750, Apt 12F
- Jun 26, 2026: $855,000, Apt 19H
- Jun 26, 2026: $860,000, Apt 33C
- Jun 23, 2026: $830,000, Apt 10H
- Jun 2, 2026: $790,000, Apt 15C
- Jun 1, 2026: $900,000, Apt 32D
The 10 most recent of 110 open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- Greater East Midtown - Special Subdistrict (City Planning P2016M0316): Completed, decided Aug 15, 2017. This is an application by NYC Department of City Planning requesting a text amendment to establish the East Midtown Subdistrict and extend the Special Midtown District, and to rezone a half-block area from C5-2 to C5-3 to reinforce the…