## Building permits

- Alteration, filed Sep 26, 2023, estimated cost $10K, described as “Installation of mechanical equipment as shown on the submitted plans. No change to use, egress or occupancy.”
- Alteration, filed Oct 6, 2022, estimated cost $134K, described as “Renovation to existing commercial retail tenant on first (ground) floor. General construction.”
- Alteration, filed Sep 1, 2022, estimated cost $148K, described as “Replacement of main roof and lower roof. No change in use, egress or occupancy.”
- Alteration, filed Jun 16, 2022, estimated cost $20K, described as “Installation of 5-Ton Outdoor VRF Condenser Unit, Support Pad and Refrigerant Piping on 3rd Floor Setback Roof. Existing Indoor VRF Unit to Remain. No Change to Occupancy, Use or Egress is Proposed.”
- Alteration, filed May 3, 2022, estimated cost $17K, described as “Localized mechanical system duct removal within New Max tenant space at 22nd floor with new branch and duct installation in conjunction with editing and pantry room layout changes, no change to use egress or occupancy.”
- Alteration, filed May 3, 2022, estimated cost $10K, described as “Localized Plumbing & Sprinkler work within New Max tenant space at 22nd floor in conjunction with editing and pantry room layout changes, no change to use egress or occupancy.”
- Alteration, filed Jan 11, 2022, estimated cost $30K, described as “Various Air Conditioning Ductwork, Supply Air Diffuser, & Return Air Grill Changes on Part of 10th Floor Including Replacing (3) Existing VAV Boxes and Demolition of Existing Exhaust Fan”
- Alteration, filed Jan 11, 2022, estimated cost $100K, described as “Demo of Some Partitions & Doors, Portion of Suspended Ceiling, Millwork, Wall & Floor Finishes, Install Partitions, Doors, Portion of Suspended Ceiling, Lighting, Wall & Floor Finishes on Part of 10th Fl. No Change to Occupancy, Use or…”
- Alteration, filed Jan 11, 2022, estimated cost $7K, described as “Modifications & Additions to Existing Sprinkler System on Part of 10th Floor”
- Alteration, filed Dec 13, 2021, estimated cost $5K, described as “Filing herewith for the installation of plumbing fixtures and associated piping”
- Alteration, filed Dec 13, 2021, estimated cost $28K, described as “Modification to an existing sprinkler system”
- Alteration, filed Dec 13, 2021, estimated cost $361K, described as “Filing herewith for modifications to an existing hvac system”
- Alteration, filed Dec 8, 2021, estimated cost $1.4M, described as “Filing herewith for the removal and installation of interior non load bearing partitions and related finishes”
- Alteration, filed Dec 7, 2021, estimated cost $16K, described as “Herewith filing for structural modification”
- Alteration, filed Feb 10, 2020, estimated cost $25K, described as “Mechanical system Duct removal within New Max tenant space at 22nd floor and installation of New Branch Duct in conjunction with new office layout, no change to use egress or occupancy.”
- Alteration, filed Jan 30, 2020, estimated cost $34K, described as “Mechanical work taking place on the 17th floor as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jan 29, 2020, estimated cost $6K, described as “Sprinkler work taking place on the 17th floor as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Sep 23, 2019, estimated cost $40K, described as “Modifications to existing HVAC system. No change to egress, use or occupancy.”
- Alteration, filed Feb 7, 2019, estimated cost $25K, described as “Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use occupancy or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2014 code.”

## Property taxes

- Assessment: $71,908,200
- 2026–27 tax: $7,428,546
- Market value (city estimate): $159,796,000
- Taxable value: $68,478,480
- Assessed land: $19,035,000
- Assessed improvements: $52,873,200

## Zoning

C6-6: floor area ratio 23.93 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Greater East Midtown - Special Subdistrict (City Planning P2016M0316): Completed, decided Aug 15, 2017. This is an application by NYC Department of City Planning requesting a text amendment to establish the East Midtown Subdistrict and extend the Special Midtown District, and to rezone a half-block area from C5-2 to C5-3 to reinforce the…
- CRYSTAL PAVILION (City Planning P1995M0362): Completed, decided Oct 23, 1995. 3RD MOD TO SPECIAL PERMIT TO MOVE MECHANICAL EQUIPMENT SPACE\*FROM THE 29TH TO THE 6TH & 12TH FLOORS IN ORDER TO CREATE A\*29TH FLR CONFERENCE ROOM & OFFICE SPACE FOR BAKER & MCKENZIE\*(POPS)
- SMITH & WOLLENSKY (City Planning P1994M0675): Completed, decided May 20, 1994. MODIFIED-UNENCLOSED SIDEWALK CAFE WITH 20 SEATS
- CRYSTAL PAVILION (City Planning P1992M0395): Completed, decided Jan 22, 1993. 2ND MODIF TO MODIFY THE HOURS OF OPERATION OF THE COVERED\*PEDESTRIAN SPACE FROM 8AM-11PM MON-SAT TO 8AM-7PM MON-FRI\*(POPS)
- CRYSTAL PAVILION (City Planning P1990M0102): Completed, decided Sep 20, 1989. FOLLOW-UP REQUESTING INSPECTION & CERTIFICATION OF MECHANI-\*CAL EQUIPMENT SPACE BY CPC CHAIRPERSON
- CRYSTAL PAVILION (City Planning P1988M0496): Completed, decided Aug 24, 1988. 1ST MOD TO SPEC PERM FOR ENTOMBMENT OF FLOOR AREA IN EXCESS\*IN AREA THAT CONTAINS AMSTER YARD (POPS)