825 Third Ave, Manhattan
Condominium · 3 units · built 1969 · Block 1324, Lot 7503.
Building permits
- Alteration, filed Nov 12, 2026, estimated cost $30K, described as “Addition of (2) fire hose valves to existing standpipe system. AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.”
- Alteration, filed Nov 12, 2026, estimated cost $15K, described as “Addition of (1) fire hose valves to existing standpipe system. AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.”
- Alteration, filed Oct 21, 2026, described as “Industrial rope access for facade inspections. No changes in the means of egress.”
- Alteration, filed Oct 14, 2026, estimated cost $469K, described as “Modification to existing sprinkler system and plumbing fixtures as per plans filed herewith. NO change in use, egress or occupancy.”
- Alteration, filed Oct 14, 2026, estimated cost $700K, described as “Modification to existing sprinkler system and plumbing fixtures as per plans filed herewith. NO change in use, egress or occupancy.”
- Alteration, filed Oct 5, 2026, estimated cost $49K, described as “Interior demolition and general construction for WEF Welcome Center on 1st floor”
- Alteration, filed Oct 5, 2026, estimated cost $10K, described as “Plumbing work for WEF Welcome Center on 1st floor”
- Alteration, filed Oct 2, 2026, estimated cost $50K, described as “Mechanical work for WEF Welcome Center on 1st floor”
- Alteration, filed Oct 2, 2026, estimated cost $15K, described as “Sprinkler work for WEF Welcome Center on 1st floor”
- Alteration, filed Oct 2, 2026, estimated cost $916K, described as “Structural modifications as per plans filed herewith. NO change in use, egress or occupancy.”
- Alteration, filed Sep 30, 2026, estimated cost $1.4M, described as “Alteration, addition of (2) supplemental water source heat pump, (16) supplemental VRF evaporators, (4) water source condensing units, associated ducts, and piping. No change to use, egress, or occupancy.”
- Alteration, filed Sep 30, 2026, estimated cost $1.8M, described as “Alteration, addition of (4) electric baseboard radiators, (7) supplemental water source heat pumps, associated ducts, and piping. No change to use, egress, or occupancy.”
- Alteration, filed Sep 28, 2026, estimated cost $6.2M, described as “Interior renovation work in commercial office space to include construction of new partitions, finishes, new doors, ceilings, new ADA restrooms, cafe/ pantry and studio/podcast and studio control space. No change in use, egress or occupancy”
- Alteration, filed Sep 28, 2026, estimated cost $4.8M, described as “Interior renovation work in commercial office space to include construction of new partitions, finishes, new doors, ceilings, new core restrooms, new warming pantry, meeting spaces.”
- Alteration, filed Sep 11, 2026, estimated cost $125K, described as “Architectural work to change use from retail to business use on part of 1st floor”
- Alteration, filed Aug 31, 2026, estimated cost $10K, described as “General construction during relocation of fire command station”
- Alteration, filed Aug 24, 2026, estimated cost $48K, described as “Sprinkler work for Sodali on 27th marketing floor (26th construction)”
- Alteration, filed Aug 24, 2026, estimated cost $34K, described as “Plumbing work for Sodali on 27th marketing floor (26th construction)”
- Alteration, filed Aug 24, 2026, estimated cost $250K, described as “Mechanical work for Sodali on 27th marketing floor (26th construction)”
- Alteration, filed Aug 20, 2026, estimated cost $115K, described as “Mechanical work for Bespoke Treatments Relocation”
- Alteration, filed Aug 20, 2026, estimated cost $575K, described as “Interior demolition and construction for Sodali on 27th marketing floor (26th construction)”
- Alteration, filed Aug 18, 2026, estimated cost $20K, described as “Sprinkler work for for Bespoke Treatments Relocation”
- Alteration, filed Aug 18, 2026, estimated cost $35K, described as “Plumbing work for Bespoke Treatments Relocation”
- Alteration, filed Jul 21, 2026, estimated cost $125K, described as “General construction for Bespoke Treatments Relocation”
- Alteration, filed Jul 13, 2026, estimated cost $80K, described as “Structural work for new raised slab on 1st floor for west retail space.”
151 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $137,325,432
- 2026–27 tax
- $10,580,269
- Market value (city estimate)
- $305,167,628
- Taxable value
- $97,405,126
- Assessed land
- $17,054,999
- Assessed improvements
- $120,270,433
- Condo units with their own tax lots
- 11
Tax breaks
- Nonprofit exemption (mental or moral improvement), with no end date, about $2,360,346 a year below the full tax.
Zoning
C6-6 (part of the lot is R8B): floor area ratio 13.46 built, 15.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.