# 885 Third Ave, Manhattan

Condominium · built 1986 · Block 1327, Lot 7504.

On Umarelli: https://umarelli.org/nyc/1013277504/885-third-ave

More construction in Midtown East: https://umarelli.org/nyc/manhattan/midtown-east.md

Every lot on block 1327: https://umarelli.org/nyc/manhattan/1327.md

## Building permits

- Alteration, filed Sep 8, 2026, estimated cost $10K, described as “Msk lipstick: installation of a ups, lithium-ion battery energy storage system as per plans filed hwerewith.”
- Alteration, filed Jul 27, 2026, estimated cost $150K, described as “Mechanical changes as indicated on plans.”
- Alteration, filed Jul 23, 2026, estimated cost $707K, described as “Interior demo & reno of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans.”
- Alteration, filed Jul 17, 2026, estimated cost $184K, described as “Modification to existing HVAC system, including removal & installation of ductwork & piping, installation of VRF heat pump, replacement of diffusers, air outlets, dampers & controls on the 32nd Floor as per plans. No changes to use,…”
- Alteration, filed Jul 17, 2026, estimated cost $73K, described as “Installation, removal, and modifications to plumbing fixtures and piping on the 32nd Floor (Dr Wiser Office), as per plans. No change to use, egress, or occupancy.”
- Alteration, filed Jul 17, 2026, estimated cost $85K, described as “Modifications to the existing sprinkler system on the 32nd Floor (Dr. Wiser Office), as per plans. No change to use, egress, or occupancy.”
- Alteration, filed Jul 16, 2026, estimated cost $218K, described as “Interior renovation of existing office space on the 32nd Floor (Dr. Wiser Office), including the partitions, doors, ceilings, and finishes as per plans. No change to use, egress, or occupancy.”
- Alteration, filed Feb 27, 2026, estimated cost $75K, described as “Mechanical changes as indicated on plans.”
- Alteration, filed Feb 24, 2026, estimated cost $150K, described as “Interior demo & reno of non-load bearing partitions, walls, doors, frames, ceiling &n finishes as indicated on plans.”
- Alteration, filed Jan 15, 2026, estimated cost $944K, described as “General construction & structural modifications taking place on facade as per plans filed herewith. No change in use, egress, or occupancy”
- Alteration, filed Dec 19, 2025, estimated cost $10K, described as “Installation of temporary sidewalk shed as per plan. There is no change in use, egress, or occupancy. The sidewalk shed at east 54TH street, entrance of east 54TH st,3RD avenue, and east 53RD street elevations.”
- Alteration, filed Dec 11, 2025, described as “Temporary installation of adjustable suspended scaffold for facade inspection & repair. No change in use, egress, or occupancy. Designated primary site supervisor: harold sanchez”
- Alteration, filed Dec 11, 2025, estimated cost $735K, described as “Msk lipstick infra: modifications to HVAC ductwork, piping and equipment to accommodate the infrastructure project in the existing building. No change to use, egress or occupancy.”
- Alteration, filed Oct 30, 2025, estimated cost $76K, described as “Mechanical modifications taking place on the 36TH floor as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Oct 9, 2025, described as “FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola”
- Alteration, filed Sep 22, 2025, estimated cost $120K, described as “Mechanical changes as indicated on plans.”
- Alteration, filed Sep 19, 2025, estimated cost $110K, described as “Modifications to the existing sprinkler system as per plans (MAMO). No change to use, egress, or occupancy.”
- Alteration, filed Sep 19, 2025, estimated cost $140K, described as “Installation, removal, and modifications to plumbing fixtures and piping, as per plans. No change to use, egress, or occupancy.”
- Alteration, filed Sep 19, 2025, estimated cost $125K, described as “Minor demolition and interior renovation of existing restaurant space, including partitions, doors, ceilings (MAMO) as per plans. No change to use, egress, or occupancy.”
- Alteration, filed Sep 19, 2025, estimated cost $229K, described as “Mechanical changes to existing restaurant space (MAMO), including removal and installation of ductwork and piping, as per plans. No changes to use, egress, or occupancy.”
- Alteration, filed Sep 18, 2025, estimated cost $180K, described as “Interior demo & reno of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans.”
- Alteration, filed Mar 12, 2025, estimated cost $60K, described as “Mechanical changes as indicated on plans.”
- Alteration, filed Mar 6, 2025, estimated cost $100K, described as “Interior reno & demo of non-load bearing partitions, walls, ceiling & finishes as indicated on plans.”
- Alteration, filed Jan 25, 2024, estimated cost $24K, described as “Mechanical changes as indicated on plans.”
- Alteration, filed Jan 10, 2024, estimated cost $111K, described as “Interior reno & demo of non-load bearing partitions, walls, ceiling and finishes as indicated on plans.”

66 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1013277504/885-third-ave.

## Property taxes

- Assessment: $130,351,527
- 2026–27 tax: $4,627,086
- Market value (city estimate): $289,670,600
- Taxable value: $42,653,818
- Assessed land: $27,000,000
- Assessed improvements: $103,351,527
- Condo units with their own tax lots: 35

## Tax breaks

- Nonprofit exemption (hospital), with no end date, about $3,100,927 a year below the full tax.
- Nonprofit exemption (nonprofit, use planned), with no end date, about $6,278,666 a year below the full tax.

## Zoning

C6-6: floor area ratio 17.01 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology