2 Tudor City Place, Manhattan
Co-op · 334 units · built 1956 · Block 1333, Lot 18.
Building permits
- Alteration, filed Jan 23, 2026, estimated cost $135K, described as “Renovation of apartment 3KS with minor partition changes as per plans. No change in use, egress, or occupancy under this application.”
- Alteration, filed Jun 27, 2025, estimated cost $20K, described as “Amendment of existing certificate of occupancy #112694 to include additional parking spaces.”
- Alteration, filed Apr 17, 2025, estimated cost $3K, described as “Installation of heavy-duty sidewalk shed as per plans. No change in use occupancy or egress under this application. Sidewalk shed shall comply with chapter 33 of the 2022 NYC building code.”
- Alteration, filed Jan 24, 2024, estimated cost $319K, described as “Combine apts 6CN and 6DN. Remove one kitchen. Renovate one kitchen and bathroom. Relocate non bearing partitions. Replace wood flooring. New millwork. Frame new dropped ceiling. No change to use, egress or occupancy under this application”
- Alteration, filed Sep 19, 2023, estimated cost $35K, described as “Temporary debris chute as per drawings. Debris chute shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Aug 19, 2023, estimated cost $1K, described as “Proposed installation of temporary light duty pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Mar 6, 2023, estimated cost $20K, described as “Proposed plumbing work as per plans as related to apartment ga-s renovation. No change in use, egress or occupancy U8NDER this application.”
- Alteration, filed Feb 21, 2023, estimated cost $89K, described as “Proposed interior renovation of apartment ga-s as per plans. No change in use, egress or occupancy under this application”
- Alteration, filed Nov 28, 2022, estimated cost $500K, described as “Parking garage repairs & temporary shoring as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Oct 14, 2022, estimated cost $7K, described as “Proposed installation of temporary shoring as per plans filed herewith. There is no change in use, egress, or occupancy.”
- Alteration, filed Sep 28, 2022, estimated cost $9K, described as “Minor interior partition channges as per plans. No change to use, egress or occupancy filed under this application.”
- Alteration, filed May 6, 2022, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed May 6, 2022, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
- Alteration, filed Apr 28, 2022, estimated cost $11K, described as “Install supported pipe scaffold as shown on the plans. No change in use, egress, or occupancy under this application.”
- Alteration, filed Mar 10, 2022, estimated cost $538K, described as “Facade repairs (as per plans). No change in use, egress, or occupancy”
- Alteration, filed Jan 5, 2022, estimated cost $51K, described as “Alteration type 2, combine apartments by removing a non structural wall, remove 5FN kitchen & one bathroom upgrade. No change in use, egress, or occupancy.”
- Alteration, filed Dec 11, 2021, estimated cost $30K, described as “Perform minor interior partitions demolition & construction inconjunction with APT#9FN/9GN combination as per TPPN#3/97. Remove one kitchen, modify & create closet areas. Install new lighting. Plumbing filed seperatey. No change to use,…”
- Alteration, filed Nov 12, 2020, estimated cost $25K, described as “Replace, Relocate & Install Plumbing Fixtures. PAA to include changes to riser diagram.”
Building history
- Alteration, filed Jun 7, 2013, permit issued - entire job/work, units 330 to 331, described as “Interior reno of apt gfn to include pl modification as per plans submitted her ewith. Exstg (1) drs apt & office - use group 4, to be modified to (1) class a apt- use group 2.”
- Major Renovation — Conversion, filed Mar 27, 2002, plan exam - approved, 330 units added, 15 stories, described as “Convert existing basement medical office to apartment. Partition and plumbing work as indicated on drawings.”
- Major Renovation — Conversion, filed Oct 7, 1998, permit issued - entire job/work, 250 units added, 15 stories, described as “Minor partition and plumbing work. combine two apartments (gms/gos)into one on the basement level.”
- Major Renovation — Conversion, filed May 24, 1996, signed off May 19, 1997, 232 units added, 15 stories, described as “Combine apartments 5L & 6L no. Into one dwelling unit. Install interior connecting stair.”
- Alteration, filed Aug 23, 1993, permit issued - entire job/work, described as “To obtain extension of certificate of occupancy board of standard and appeals approval required.”
- Major Renovation — Conversion, filed Jun 3, 1993, signed off Jun 3, 1996, 332 units added, 15 stories, described as “Combine two apts into one, relocate interior no bearing partitions and plumbing fixtures.”
- Major Renovation — Conversion, filed Apr 10, 1992, signed off Oct 25, 1994, 332 units added, 14 stories, described as “Combine apts 11G & 11H in one apt”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $41,182,650
- 2026–27 Tax
- $3,749,796
- Market value (city estimate)
- $91,517,000
- Taxable value
- $34,761,479
- Assessed land
- $5,625,000
- Assessed improvements
- $35,557,650
Tax breaks
- Co-op and Condo Abatement, with no end date, a $580,401 credit this tax year.
Zoning
R10: floor area ratio 9.69 built, 10.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Sep 9, 2026: $1,225,000
- Aug 31, 2026: $865,000
- Jul 17, 2026: $1,045,000
- Jun 23, 2026: $492,000
- Jun 4, 2026: $772,000
- Jun 3, 2026: $720,000
- May 11, 2026: $670,000
- Mar 23, 2026: $681,000
- Nov 13, 2025: $450,000
- Aug 25, 2025: $2,100,000
The 10 most recent of 121 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Tudor City Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.