25 Tudor City Place, Manhattan
Co-op · 443 units · built c. 1929 · Block 1334, Lot 22.
Building permits
- Alteration, filed Jul 7, 2026, described as “IRA to assist with Condition Assessment”
- Alteration, filed May 3, 2024, estimated cost $10K, described as “T-Mobile: Replacement of existing antennas on the facade. Replacement of existing RRUs in the equipment room in the sub cellar. All work is in compliance with TPPN 5/98. No change in use, egress or occupancy.”
- Alteration, filed Jun 23, 2023, estimated cost $150K, described as “Minor interior renovation/partitioning, removing unit 07 & 08 partition walls combining (2) studio apartments into a 1 bedroom residence”
- Alteration, filed Jun 23, 2023, estimated cost $31K, described as “PL: Remove and Provide New Plumbing Fixtures Connected to Existing Plumbing Piping. No Change in Use, Occupancy, or Egress.”
- Alteration, filed Jun 23, 2023, estimated cost $22K, described as “OT: Interior Renovation of Existing Ground Floor Commercial Space. No change in Use, Occupancy, or Egress.”
- Alteration, filed Jun 16, 2023, estimated cost $40K, described as “Filing for interior renovation and combination of 5TH floor apts 512 & 514 as per plans submitted herewith.”
- Alteration, filed Mar 23, 2023, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Oct 31, 2022, estimated cost $238K, described as “Terrace railing installation, copper posts at terra cotta parapet installation as per plan. No change in use, egress or occupancy.”
- Alteration, filed Oct 21, 2022, estimated cost $183K, described as “New HVAC installation and associated duct work. No change in use, egress or occupancy.”
- Alteration, filed Jun 16, 2022, estimated cost $1K, described as “Installation of temporary storage of materials as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jan 31, 2022, estimated cost $17K, described as “Plumbing scope of work in-conjunction with general construction interior renovation application.”
- Alteration, filed Jan 31, 2022, estimated cost $75K, described as “Combining co-op units (1619 & 1620) on the same floor (to comply with tppn 03/97): removal &disposal of inter. Gwb wall, along with finishes and electric cooktop. Installation of newgwb wall and finishes. No change to use, egress or…”
- Alteration, filed Jan 19, 2022, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
- Alteration, filed Oct 26, 2021, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed May 20, 2021, estimated cost $14K, described as “Combining co-op units (1612 & 1614) on the same floor (to comply with tppn 03/97): removal & disposal of inter. Gwb wall, along with finishes and electric cooktop. Installation of new gwb wall and finishes. No change to use, egress or…”
- Alteration, filed Jan 19, 2021, estimated cost $120K, described as “Minor interior renovation/partitioning, removing unit 11 & 12, partition walls, replacing wall tile and fixtures in bathroom. Combining Apartments(apt# 1911 & 1912) to Create Larger Residential Units as per TECHNICAL POLICY AND PROCEDURE…”
- Alteration, filed Mar 4, 2020, estimated cost $15K, described as “Replace (1) existing HVAC unit in an existing utility vault (UDG). Related air handlers in the existing equipment room on the second floor. No change in use, egress or occupancy.”
- Alteration, filed Apr 24, 2018, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Apr 17, 2018, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Apr 9, 2018, described as “Installation of heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.”
Building history
- Major Renovation — Conversion, filed Jun 7, 2004, permit issued - entire job/work, 441 units added, 23 stories, described as “To convert existing offices into daycare center at cellar and 1st floor. And to modify ducts of existing HVAC system.”
- Major Renovation — Conversion, filed Nov 19, 1990, permit issued - entire job/work, 442 units added, 23 stories, described as “Create new tenant laundry room in sub- cellar.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $30,783,150
- 2026–27 Tax
- $3,265,975
- Market value (city estimate)
- $68,407,000
- Taxable value
- $28,265,270
- Assessed land
- $4,725,450
- Assessed improvements
- $26,057,700
Tax breaks
- Co-op and Condo Abatement, with no end date, a $251,883 credit this tax year.
Zoning
R10: floor area ratio 21.39 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Aug 18, 2026: $357,500
- Aug 12, 2026: $260,000
- Jul 22, 2026: $335,000
- Jul 21, 2026: $290,000
- Jun 22, 2026: $315,000
- Apr 23, 2026: $285,000
- Mar 26, 2026: $305,000
- Jan 15, 2026: $290,000
- Jan 7, 2026: $85,000
- Dec 2, 2025: $430,000
The 10 most recent of 238 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Tudor City Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.