# 809 1st Avenue, Manhattan

Office condominium · built 1964 · Block 1338, Lot 7503.

On Umarelli: https://umarelli.org/nyc/1013387503/809-1-avenue

More construction in Midtown East: https://umarelli.org/nyc/manhattan/midtown-east.md

Every lot on block 1338: https://umarelli.org/nyc/manhattan/1338.md

## Building permits

- Alteration, filed May 11, 2026, estimated cost $15K, described as “Proposed installation of pipe scaffold for new building as per plans. No change in use occupancy or egress under this application.”
- Alteration, filed May 6, 2026, estimated cost $5K, described as “Installation of temporary construction of fence of plywood , chain link and plywood fence and jersey barricades with chain link fence as per plans. No change in use occupancy or egress under this application.”
- Alteration, filed Apr 27, 2026, estimated cost $2K, described as “Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use occupancy or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2022 code.”
- Alteration, filed Mar 12, 2026, estimated cost $9.1M, described as “Interior Demolition and Renovation of the 10 & 11th floor. No change of use, occupancy or egress under this application”
- Alteration, filed Mar 11, 2026, estimated cost $293K, described as “Plumbing work proposed for interior office renovation for new tenant. No change to Use, Egress or Occupancy.”
- Alteration, filed Mar 11, 2026, estimated cost $1.7M, described as “Installation of new HVAC system for floors 10 & 11 as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Mar 11, 2026, estimated cost $171K, described as “Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.”
- Alteration, filed Oct 28, 2025, estimated cost $1.5M, described as “Filed herewith front facade replacement. No change of use, occupancy or egress under this application”
- Alteration, filed Jul 11, 2025, estimated cost $350K, described as “Mechanical job filed in conjunction with interior renovation of an existing office space for floors, 1-2, 5-9 and 12. Work to consist on removal and addition of HVAC system with all associated ducts and pipping.”
- Alteration, filed Jul 9, 2025, estimated cost $90K, described as “Addition of sprinkler deluge system and necessary piping fittings, etc. for renovation of an existing office space of floors 1-2, 5-9 and 12.”
- Alteration, filed May 16, 2025, estimated cost $1.5M, described as “Filed herewith rear facade replacement. No change of use, occupancy or egress under this application”
- Alteration, filed Jan 10, 2025, estimated cost $100K, described as “Plumbing work proposed for interior office renovation for new tenant. No change to Use, Egress or Occupancy.”
- Alteration, filed Nov 21, 2024, estimated cost $20K, described as “Reinforcement of existing concrete framed slab for staircase opening. No change to use, egress or occupancy.”
- Alteration, filed Nov 21, 2024, estimated cost $200K, described as “Interior office renovation for new tenant. Work to include partitions, ceilings, lighting, carpentry and finish work. No change to Use, Egress or Occupancy.”
- Alteration, filed Aug 5, 2024, estimated cost $100K, described as “Non-structural, partial interior demolition as per plans filed. No change to Use, Egress or Occupancy.”
- Alteration, filed May 18, 2022, estimated cost $25K, described as “Decommission of existing Sprint site. Remove antennas and equipment from the roof. Service connection in the basement. Initial installation approved under application #104666167. Equipment shelter, dunnage, and conduits to remain.”
- Alteration, filed Nov 27, 2019, estimated cost $7K, described as “Modification to existing sprint telecommunications site. Replace (3) antennas remove (3) rrh units and relocation of antenna sectors all with related equipment on roof. All in conformance with tppn 5/98. No change in use, egress, or…”

## Property taxes

- Assessment: $21,422,250
- Market value (city estimate): $47,605,000
- Taxable value: $0
- Assessed land: $3,406,500
- Assessed improvements: $18,015,750
- Condo units with their own tax lots: 8

## Zoning

C5-2: floor area ratio 11.19 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Oct 20, 2021: $97,516,995, Apt 1, sold with other lots
- Nov 14, 2019: $91,000,000, Apt 1, sold with other lots

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of Edgar J. Kaufman Conference Rooms, Lecture Hall and Elevator Lobby (Interior Landmark). 11 Landmarks Preservation Commission permits are on file.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
