# 340 East 52nd Street, Manhattan

Apartment Building · 66 units · built 1941 · Block 1344, Lot 33.

On Umarelli: https://umarelli.org/nyc/1013440033/340-east-52-street

More construction in Midtown East: https://umarelli.org/nyc/manhattan/midtown-east.md

Every lot on block 1344: https://umarelli.org/nyc/manhattan/1344.md

## Building permits

- Alteration, filed May 14, 2024, estimated cost $38K, described as “Application filed to install handicap bathroom. No change in use, occupancy or egress.”
- Alteration, filed Feb 7, 2024, estimated cost $79K, described as “Proposed to renovate units on the 1st floor. Work to include removal and installation of interior non-load bearing partitions and finish work as per plan. No change in use, occupancy or egress.”
- Alteration, filed Jan 30, 2024, estimated cost $25K, described as “Application filed to change use and occupancy of the cellar into amenity space, accessory to residential.”
- Alteration, filed Dec 8, 2023, estimated cost $30K, described as “Interior renovation of the cellar. Minor demolition and carpentry. No change in use, occupancy or egress.”
- Alteration, filed Oct 30, 2023, estimated cost $457K, described as “Proposed to renovate units on 2nd, 3rd, 4th, 6th, 7th and Penthouse floors. Work to include removal and installation of interior non-load bearing partitions and finish work as per plan. No change in use, occupancy or egress.”
- Alteration, filed Jun 28, 2023, estimated cost $7K, described as “Install new plumbing fixtures for apartment renovation. No change in use, occupancy, or egress.”
- Alteration, filed Apr 26, 2023, estimated cost $516K, described as “Interior renovation of units on the 1st, 3rd, 5th, 6th, 7th, 8th and Penthouse. Work to includes units 1D, 3H, 5F, 7C, 6H, 8AB, 8D, PHA, 5F. No change in use, occupancy or egress.”
- Alteration, filed Apr 25, 2023, estimated cost $120K, described as “Create core penetrations through existing cinder concrete slab for electrical conduits, on all floors (1 through 8+ PH). No additional framing or reinforcing is required if spacing requirements shown on S-101 are followed.”
- Alteration, filed Mar 28, 2023, estimated cost $157K, described as “Proposed to renovate hallways on 1st thru 8th floors. Work to include lighting and finish work as per plan.”
- Alteration, filed Mar 24, 2023, estimated cost $110K, described as “Proposed to renovate unit on the 4th floor, combine unit 4D and C. Work to include removal and installation of interior non-load bearing partitions & finish work as per plan.”
- Alteration, filed Mar 14, 2023, estimated cost $306K, described as “Proposed to renovate units on 1st, 2nd, 6th, 7th, 8th floor including units 1H, 2A, 2F, 6, 7D, 8F, 8G. No change in use, egress or occupancy.”
- Alteration, filed Dec 20, 2022, estimated cost $152K, described as “Replace, relocate and add new plumbing fixtures in 2nd through penthouse. No change in use, egress or occupancy.”
- Alteration, filed Nov 29, 2022, estimated cost $539K, described as “Application filed to renovate apartments from 2nd to PH floor. Including units: 2H, 3D, 3E, COMBINE 3DE AS PER TPPN 3/97, 4A, 5G, 5H, 6A, 7E, 7F, 8E, PHCD. No change in use, occupancy or egress.”
- Alteration, filed Aug 29, 2022, estimated cost $579K, described as “Renovation of residential units 2C,3B,3C,4B,5B,5C,6B,6C,7AB,8C at the 2nd thru 8th floors. Work to include removal and installation of interior non-load bearing partitions, lighting and finish work as per plan. No change to Use, Egress or…”
- Alteration, filed Oct 8, 2021, estimated cost $5K, described as “Installation of pipe scaffold on behalf of Contractor”
- Alteration, filed Oct 8, 2021, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed filed for remedial repairs as per plans. No change in use occupancy or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2014…”

## Property taxes

- Assessment: $5,611,950
- 2026–27 Tax: $665,428
- Market value (city estimate): $12,471,000
- Taxable value: $5,410,440
- Assessed land: $783,000
- Assessed improvements: $4,828,950

## Zoning

R8B: floor area ratio 6.49 built, above the 4.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- May 26, 2022: $28,860,000

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
