# 310 East 53rd Street, Manhattan

Condominium · 84 units · built 2006 · Block 1345, Lot 7501.

On Umarelli: https://umarelli.org/nyc/1013457501/310-east-53-street

More construction in Midtown East: https://umarelli.org/nyc/manhattan/midtown-east.md

Every lot on block 1345: https://umarelli.org/nyc/manhattan/1345.md

## Building permits

- Alteration, filed Jul 6, 2026, estimated cost $16K, described as “Interior renovation of unit 23BC to include new door and finishes in bathroom. No change in egress, occupancy or use.”
- Alteration, filed Jan 2, 2026, estimated cost $5K, described as “Installation of pipe scaffolding as per plans. Pipe scaffolding shall comply with chapter # 33 of the 2022 code. No change in use occupancy or egress under this application.”
- Alteration, filed Dec 31, 2025, estimated cost $5K, described as “Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Aug 28, 2025, estimated cost $5K, described as “Install limestone panel on east facade between third and fourth floors at to address ecb violation #35718186H. Area of work is outside the public right-of-way. No change in egress, occupancy or use.”
- Alteration, filed Aug 4, 2025, estimated cost $100K, described as “Replace approximately 250 linear feet of sidewalk and curb”
- Alteration, filed Jun 30, 2025, estimated cost $268K, described as “Interior renovation of the existing residential unit #26BC as per submitted plans. No change in occupancy, use or egress with this application.”
- Alteration, filed May 15, 2024, described as “Installation of outrigger for facade repair.”
- Alteration, filed Apr 23, 2024, estimated cost $5K, described as “Installation of pipe scaffolding as per plans. All equipment shall comply with chapter # 33 of the 2022 code. No change in use occupancy or egress under this application.”
- Alteration, filed Apr 2, 2024, estimated cost $596K, described as “Replacement of window gaskets and sealant at specified areas on facade. Miscellaneous flashing / metal panel repair at select locations.”
- Alteration, filed Mar 25, 2024, estimated cost $5K, described as “Installation of 300 psf sidewalk shed as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Oct 5, 2022, estimated cost $11K, described as “Construction of minor interior partition wall to create new office. No change in egress, occupancy or use.”
- Alteration, filed Mar 15, 2022, estimated cost $15K, described as “Modifications to existing unit's plumbing system”
- Alteration, filed Mar 10, 2022, estimated cost $150K, described as “Interior renovations to existing apartment”
- Alteration, filed Oct 11, 2021, estimated cost $33K, described as “Propose plumbing work in conjunction with arch. Design. No change in use. Egress. Or occupancy.”
- Alteration, filed Oct 11, 2021, estimated cost $100K, described as “Propose interior renovation at UNIT#12C, work includes minor partition and finish work as per plan. Plumbing work filed seperately on dobnow. No change in use. Egress. Or occupancy”
- Alteration, filed Mar 31, 2021, estimated cost $10K, described as “Modifications of sprinkler system associated with renovations to existing apartment. No change in occupancy, use or egress.”
- Alteration, filed Mar 5, 2021, estimated cost $55K, described as “Plumbing work associated with renovations to existing apartment. No change in occupancy, use or egress.”

## Property taxes

- Assessment: $29,526,769
- 2026–27 Tax: $3,263,491
- Market value (city estimate): $65,615,007
- Taxable value: $28,944,875
- Assessed land: $3,676,521
- Assessed improvements: $25,850,248
- Condo units with their own tax lots: 86

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $221,541 credit this tax year.

## Zoning

C1-9 (part of the lot is R8B): floor area ratio 12.20 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Oct 1, 2026: $2,600,000, Apt 25A
- Aug 28, 2026: $2,075,000, Apt 8A
- Aug 3, 2026: $1,380,000, Apt 2/3D
- May 22, 2026: $3,200,000, Apt 27C
- Nov 5, 2025: $2,500,000, Apt 14A
- Oct 16, 2025: $3,250,000, Apt 22C
- Jul 29, 2025: $2,518,750, Apt 18A
- Jul 24, 2025: $2,200,000, Apt 7A
- Apr 10, 2025: $2,825,000, Apt 20B
- Nov 14, 2024: $2,450,000, Apt 23A

The 10 most recent of 37 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- CITY TUNNEL NO.3,STAGE2,SHAFT 32B (City Planning P2001M0126): Completed, decided Mar 24, 2004. 00DEP015M: INVOLVES THE AACQUISITION OF LAND AND A SITE SELECTION TO CO NSTRUCT A VERTICAL WATER SUPPLY SHAFT TO CONNECT TO CITY WAT ER TUNNEL NO. 3. SHAFT 32B
- 994-1002 2ND AVE A/K/A 308-310 E53RD ST (City Planning P2001M0166): Completed, decided Oct 18, 2002. CERT FOR A TRANSIT EASEMENT VOLUME FOR THE CONSTRUCTION OF A\*MIXED-USE BLDG
- 308 E53RD ST (City Planning P1994M0533): Completed, decided Aug 24, 1994. CERT AS TO WHETHER OR NOT A TRANSIT EASEMENT IS REQUIRED IN\*THE SPECIAL TRANSIT LAND USE TA DIST IN A C1-9 ZONE

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology