333 East 55th Street, Manhattan
Co-op · 114 units · built 1962 · Block 1348, Lot 16.
Building permits
- Alteration, filed Oct 15, 2026, estimated cost $72K, described as “Proposed interior renovation in existing residential APARTMENT#7G on the 7TH fl with minor partition work & no structural intervention. Install fire rated kitchen partition. Plumbing work will be filed separately. No change in use, egress,…”
- Alteration, filed Apr 2, 2026, estimated cost $21K, described as “Installation of temporary roof protection and overhead protection as per plans. Temporary protection shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Mar 5, 2026, estimated cost $481K, described as “Facade repairs no change in use, egress or occupancy.”
- Alteration, filed Nov 11, 2024, estimated cost $77K, described as “Partial interior renovation of apartment 10G on 010 floor. Work includes minor non-structural partition work, doors, cabinetry, and finishes. No change in use, egress, or occupancy.”
- Alteration, filed Mar 29, 2024, estimated cost $18K, described as “Installation of temporary shoring as per plans submitted herewith. There is no change in use, egress or occupancy.”
- Alteration, filed Mar 22, 2023, estimated cost $19K, described as “Interior renovation in 1E as indicated on plans. No change to use, occupancy or egress.”
- Alteration, filed Jan 31, 2022, estimated cost $71K, described as “Interior renovation in apt 12A as indicated on plans. No change to use, occupancy or egress.”
- Alteration, filed Jan 11, 2022, estimated cost $33K, described as “Filed to propose plumbing fixtures and to replace existing fixtures at duplex apartment 6B/7B”
- Alteration, filed Jan 11, 2022, estimated cost $56K, described as “Filed to propose interior alterations to duplex apartment 6B/7B”
- Alteration, filed Jan 6, 2022, estimated cost $30K, described as “Proposed enlargement of existing circular opening of connecting staircase between duplex apt at #6B and # 7B.”
- Alteration, filed Nov 4, 2021, estimated cost $35K, described as “Ot work type is filed for interior alteration work for apartment 5F on the 4TH floor level only. Scope of work limtied to closets and kitchen. No change in use, floor area, egress, bulk, or occupancy under this application.”
- Alteration, filed Jan 8, 2021, estimated cost $24K, described as “Cap, remove 1 gas range, 1 sink, 1 gas range, 2 tubs; relocate 1 sink, 1 dishwasher, 2 lavs., 2 toilets; replace 1 tub, 1 lav., 1 toilet; install 2 stall showers”
Building history
- Alteration, filed Feb 11, 2002, permit issued - entire job/work, described as “Filing to change the certificate of occupancy to correct errors.”
- Major Renovation — Conversion, filed Sep 15, 1997, signed off Dec 10, 2001, 109 units added, 11 stories, described as “Combine apartments #12D and 12E on the 11TH floor. Non-load bearing partitions and plumbing as per drawings.”
- Major Renovation — Conversion, filed Jun 16, 1997, signed off Dec 10, 2001, 109 units added, 11 stories, described as “Combine apartments #7C and #7D into apt# 7D on the sixth floor level.non load bearing partitions as per drawings. New plumbing fixtures as shown on drawi gs.”
- Major Renovation — Conversion, filed Jun 16, 1997, signed off Dec 10, 2001, 109 units added, 11 stories, described as “Combine apartments #5A and #5K into apt# 5A on the fourth floor non-load bearing partitions as per drawings.”
- Major Renovation — Conversion, filed Oct 17, 1996, permit issued - entire job/work, 118 units added, 13 stories, described as “Combine existing apartment 1-b with exis ting apartment 1-c on the 1ST floor of existing multiple dwelling. Change in unit count, amend certificat of occupancy, all as per plans filed her ewith.”
- Major Renovation — Conversion, filed Apr 16, 1991, permit issued - entire job/work, 119 units added, 13 stories, described as “No work under this appl. Legalize previo usly converted 2 doctors offices to apts. Bsmt level and previous ly combined apts. On the 4TH, 5TH, 6TH and p.h. And 8TH flr. Correct 8 th flr. Dwelling unit count.correct dwelling count on 9TH and…”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $11,869,650
- 2026–27 Tax
- $1,195,586
- Market value (city estimate)
- $26,377,000
- Taxable value
- $10,969,399
- Assessed land
- $2,317,500
- Assessed improvements
- $9,552,150
Tax breaks
- Co-op and Condo Abatement, with no end date, a $170,971 credit this tax year.
Zoning
R8: floor area ratio 8.60 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Aug 31, 2026: $1,200,000
- Jul 2, 2026: $650,000
- Dec 4, 2025: $700,000
- Jun 20, 2025: $675,000
- Jun 3, 2025: $410,000
- Jun 11, 2024: $720,000
- May 31, 2024: $735,000
- May 28, 2024: $596,000
- May 1, 2024: $860,000
- Sep 7, 2023: $1,025,000
The 10 most recent of 44 open-market sales since 2016, from the Department of Finance’s sales files.