1 Beekman Place, Manhattan
Co-op · 136 units · built c. 1931 · Block 1361, Lot 21.
Building permits
- Alteration, filed Aug 19, 2026, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Jul 16, 2026, described as “Installation of suspended scaffold for facade inspection/repair.”
- Alteration, filed Apr 10, 2025, estimated cost $104K, described as “Facade restoration in connection with the cycle 9 inspection report. No change to use, egress or occupancy under this application.”
- Alteration, filed Sep 11, 2024, estimated cost $29K, described as “Minor work in 1A only. Infill ac openings and cutting interior partition wall for refrigerant. No change in use, egress, and occupancy.”
- Alteration, filed Jun 10, 2024, described as “Suspended scaffold system for the AC sleeve installation”
- Alteration, filed Apr 24, 2024, described as “Installation of suspended scaffolding during facade inspection/repair.”
- Alteration, filed Oct 3, 2023, estimated cost $12K, described as “Mh work as per plans. No change to use egress or occupancy.”
- Alteration, filed Oct 3, 2023, estimated cost $35K, described as “Gc work as per plans. No change to use egress or occupancy.”
- Alteration, filed Jan 5, 2022, estimated cost $55K, described as “Replace 8 (single zone) split systems condenser under the window and associated air handler (Cooling) in apartment 2AB on 2nd floor. No change in use, egress and occupancy.”
- Alteration, filed Apr 22, 2020, estimated cost $125K, described as “Herewith filing plumbing work as per plans. No change to use, egress or occupancy”
- Alteration, filed Apr 22, 2020, estimated cost $140K, described as “Herewith filing mechanical work as per plans. No change in use, egress or occupancy”
- Alteration, filed Dec 5, 2019, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 21, 2019, estimated cost $102K, described as “Filing herewith plumbing work in assocation with apartment renovations as per plans. No change in use, egress, oroccupancy under this application.”
- Alteration, filed Oct 21, 2019, estimated cost $160K, described as “Filing herewith mechanical work associated with apartment renovations as per plans. No change in use, egress, or occupancy under this application.”
- Alteration, filed May 30, 2019, estimated cost $7K, described as “Pipe scaffold”
- Alteration, filed May 23, 2019, estimated cost $5K, described as “Sidewalk shed”
Property taxes
- Assessment
- $25,830,000
- 2026–27 tax
- $2,670,787
- Market value (city estimate)
- $57,400,000
- Taxable value
- $23,424,071
- Assessed land
- $3,865,500
- Assessed improvements
- $21,964,500
Tax breaks
- Co-op and condo abatement, with no end date, a $243,095 credit this tax year.
Zoning
R8B: floor area ratio 8.79 built, above the 4.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jul 30, 2025: $3,500,000
- May 5, 2025: $2,797,500
- Aug 29, 2023: $2,905,750
- Mar 22, 2023: $1,336,500
- Dec 30, 2021: $6,800,000
- Mar 5, 2020: $5,500,000, Apt 3/4C
- May 24, 2018: $10,147,500
- Apr 10, 2018: $6,500,000
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- BEEKMAN PL/MITCHELL PL REZONING (City Planning P1994M0470): Completed, decided Jun 5, 1995. 94DCP030M: REZONE R10/C1-5, R10 & R8B TO R10A TO REDUCE NONCOMPLIANCE OF THE EXISTING BUILDINGS