# 1 Sutton Place South, Manhattan

Co-op · 43 units · built c. 1926 · Block 1372, Lot 2.

On Umarelli: https://umarelli.org/nyc/1013720002/1-sutton-place-south

More construction in Midtown East: https://umarelli.org/nyc/manhattan/midtown-east.md

Every lot on block 1372: https://umarelli.org/nyc/manhattan/1372.md

## Building permits

- Alteration, filed Jun 30, 2026, estimated cost $8K, described as “Minor partition work throughout per plans. Combining existing apartments 4C & 4D under tppn 3/97”
- Alteration, filed May 11, 2026, described as “Installation of suspended scaffold for facade work or inspection.”
- Alteration, filed Apr 24, 2026, estimated cost $750K, described as “Hereby filing for the renovation of unit 6D. No change in use, egress or occupancy.”
- Alteration, filed Mar 30, 2026, estimated cost $1.5M, described as “Facade repairs as per plans been filled herewith.”
- Alteration, filed Oct 22, 2025, described as “Hands-in inspection of portions of facades”
- Alteration, filed Oct 17, 2025, estimated cost $1.1M, described as “Interior renovations as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed May 14, 2025, estimated cost $35K, described as “Minor plumbing work as per plans. No change of use, egress or occupancy under this application.”
- Alteration, filed Apr 10, 2025, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Oct 23, 2024, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 10, 2024, described as “Installation of temporary suspended scaffold equipment”
- Alteration, filed Jun 28, 2024, estimated cost $30K, described as “Replacing Juliette balconies with new ones on east facade. Beam and slab repair for existing concrete encased steel beam and draped mesh slab.”
- Alteration, filed Jun 26, 2024, estimated cost $6K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed May 23, 2024, estimated cost $150K, described as “Modification of ductwork, exhaust fans and addition of ac units on partial 5th floor. No change in use, egress or occupancy.”
- Alteration, filed Feb 29, 2024, estimated cost $165K, described as “Plumbing work proposed for an existing apartment. No change to use, occupancy or egress.”
- Alteration, filed Feb 29, 2024, estimated cost $608K, described as “Renovation of an existing apartment. No change to use, occupancy or egress.”
- Alteration, filed Feb 29, 2024, estimated cost $145K, described as “Mechanical work proposed for an existing apartment. No change to use, occupancy or egress.”
- Alteration, filed Dec 22, 2023, described as “Hands-on inspection for FISP.”
- Alteration, filed Nov 17, 2023, estimated cost $3K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Nov 17, 2023, estimated cost $3K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Aug 2, 2023, estimated cost $36K, described as “Removal and installation of plumbing fixtures on partial 5th floor in Apt 5CD. No change in use, egress or occupancy.”
- Alteration, filed Jul 21, 2023, estimated cost $1.3M, described as “Interior removal and installation of partitions associated with apartment renovation on partial 5th floor. Work to include combination of apartments 5CD as per TPPN # 3/97. No change in use egress or occupancy.”
- Alteration, filed May 23, 2023, estimated cost $363K, described as “Moderate interior renovation of unit 2B on 002 & 003 floors consisting of Non-load bearing partitions, GWB,tilework, moulding, trim & cosmetic finishes. No changes to egress, occupancy or use.”
- Alteration, filed Feb 15, 2023, estimated cost $58K, described as “Mechanical work in conjuction with partial renovation of existing apts 10C/10D per plans filed. No change in use, egress or occupancy.”
- Alteration, filed Feb 15, 2023, estimated cost $40K, described as “Plumbing work in conjuction with partial renovation of existing apts 10C/10D per plans filed. No change in use, egress or occupancy.”
- Alteration, filed Feb 15, 2023, estimated cost $323K, described as “Partial interior renovation of existing apts 10C/10D as per plans filed. No change in use, egress or occupancy”

11 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1013720002/1-sutton-place-south.

## Property taxes

- Assessment: $32,053,500
- 2026–27 tax: $3,125,955
- Market value (city estimate): $71,230,000
- Taxable value: $28,188,969
- Assessed land: $4,846,500
- Assessed improvements: $27,207,000

## Tax breaks

- Co-op and condo abatement, with no end date, a $380,471 credit this tax year.

## Zoning

R10: floor area ratio 8.91 built, 10.00 allowed by base zoning.

## Recent sales

- May 9, 2025: $2,500,000
- Apr 28, 2025: $5,500,000
- Jan 11, 2024: $2,850,000
- Sep 29, 2023: $9,999,999
- Apr 28, 2023: $4,650,000
- Apr 27, 2023: $3,125,000
- Nov 30, 2021: $2,850,000
- Jul 9, 2021: $5,175,000
- May 24, 2017: $16,500,000
- Dec 19, 2016: $9,495,000

The 10 most recent of 15 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- East River Fifties - Text Amendment (City Planning P2018M0060): Completed, decided Dec 5, 2017. This is an application by the East River Fifties Alliance, Inc., NYC Manhattan Borough President, NYC Council Members for Council Districts 4 and 5, and New York State Senator for District 28 requesting a text amendment to ZR Sections…
- East River Fifties\_Sutton Place - Text Amendment (City Planning P2016M0127): Completed, decided Oct 3, 2017. The applicant proposes to amend the zoning text to create contextual zoning regulations for a defined portion of the Sutton Place neighborhood that would modify the application of the existing R10 zoning district bulk and use regulations,…
- 1 SUTTON PL SOUTH (City Planning P1991M0206): Completed, decided Sep 1, 1992. RE-ISSUE OF NEGOTIATED LEASE FOR A GARDEN CONSTRUCTED UPON\*THE DECK ABOVE THE FDR DRIVE

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
