650 Madison Avenue, Manhattan
Commercial · built 1957 · Block 1374, Lot 14.
Building permits
- Alteration, filed Nov 18, 2026, estimated cost $50K, described as “Interior demolition of existing 15th floor office space and corridor, including removal of flooring, finishes, non-load-bearing partitions, millwork, FF&E, ceilings and ceiling fixtures. No change in use, occupancy, egress, or structure.”
- Alteration, filed Oct 19, 2026, estimated cost $105K, described as “Minor interior renovation of retail shop for celcine; converting two existing fitting rooms to one vic fitting space as shown herewtih. No changes to egres, occupancy or use.”
- Alteration, filed Jul 6, 2026, estimated cost $7K, described as “Proposed minor general construction alterations to the C1 Cellar level as per plans submitted herewith. No Change to Use, Occupancy, or Egress.”
- Alteration, filed Jun 29, 2026, estimated cost $500K, described as “ALT-CO filed to increase occupancy on the 23rd floor as per drawings filed herewith. No change in use or egress.”
- Alteration, filed Jun 22, 2026, estimated cost $500K, described as “General construction modifications taking place on the 23R dfloor as per drawings filed herweith. No change in use, egress or occupancy.”
- Alteration, filed Apr 14, 2026, estimated cost $20K, described as “Modifications to the existing HVAC ductwork as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.”
- Alteration, filed Nov 20, 2025, estimated cost $600K, described as “Proposed general construction work on the 6th floor as per drawings filed herweith. No change in use, egress or occupancy.”
- Alteration, filed Sep 4, 2025, estimated cost $5K, described as “Temporary platform for the Ralph Lauren showroom. Removed at the end of the programing. No changes to existing structures, use or egress.”
- No Work, filed Sep 4, 2025, described as “Fashion show in the existing showroom for Ralph Lauren.”
- Alteration, filed Aug 20, 2025, estimated cost $10K, described as “Proposed minor general construction on the 9TH floor as per drawings filed herweith. No change in use, egress or occupancy.”
- Alteration, filed Jul 30, 2025, estimated cost $4K, described as “Installation of temporary roof protection as per plans. No change in use, egress or occupancy.”
- No Work, filed Jun 2, 2025, described as “Cocktail gathering for 'Companhia Siderrgica Nacional LLC' being held on the 26th Floor at 650 Madison Avenue for 150 persons on Tuesday, June 17th from 6:00PM to 9:30PM.”
- No Work, filed May 8, 2025, described as “Cocktail reception in the TOD's retail store”
- Alteration, filed Apr 21, 2025, estimated cost $133K, described as “Structural work on the 7th and 8th floors to infill stair slabs as indicated on drawings.”
- Alteration, filed Mar 3, 2025, estimated cost $600K, described as “Proposed general construction work on the 5th and 7th, and 8th floors as per drawings filed herweith. No change in use, egress or occupancy.”
- Alteration, filed Sep 25, 2024, estimated cost $780K, described as “Proposed general construction work on the fifth floor as per drawings filed herweith. No change in use, egress or occupancy.”
- Alteration, filed Jun 26, 2024, estimated cost $55K, described as “Proposed general construction work on the cellar level as per drawings filed herweith. No change in use, egress or occupancy.”
- No Work, filed May 31, 2024, described as “Cocktail gathering for 'Companhia Siderrgica Nacional LLC' being held on the 26th Floor at 650 Madison Avenue for 150 persons on Monday, June 17th from 6:00PM to 9:30PM.”
- Alteration, filed May 29, 2024, estimated cost $975, described as “Non-illuminated non-advertising accessory wall sign - roger vivier. No change of use, egress or occupancy.”
- No Work, filed Apr 23, 2024, described as “Fashion show for invited gusts in an existing showroom, with accessory backstage spaces.”
- Alteration, filed Mar 28, 2024, estimated cost $10K, described as “Proposed minor general construction on the 9TH floor as per drawings filed herweith. No change in use, egress or occupancy.”
- Alteration, filed Mar 6, 2024, estimated cost $221K, described as “General construction modifications taking place on the 17TH floor as per drawings filed herweith. No change in use, egress or occupancy.”
- Alteration, filed Feb 29, 2024, estimated cost $437K, described as “Tod's - Roger Vivier Buildout - Construction work on the 1st floor as indicated on drawings.”
- Alteration, filed Feb 28, 2024, estimated cost $39K, described as “Tod's - Roger Vivier Buildout - Structural work on the 1st floor as indicated on drawings.”
- No Work, filed Feb 8, 2024, described as “Cocktail reception in the TOD's retail store”
86 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $198,965,000
- 2026–27 tax
- $21,583,723
- Market value (city estimate)
- $442,144,400
- Taxable value
- $198,965,000
- Assessed land
- $72,000,000
- Assessed improvements
- $126,965,000
Zoning
C5-3 (part of the lot is C5-2.5): floor area ratio 12.69 built, 15.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.